ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Intelligentia Horizon by Haware Properties

Registered No litigation declared Others project

Intelligentia Horizon by Haware Properties

By Haware Intelligentia Properties LLP

RG-MH-77243 · RERA P51800049437 · Last updated on MahaRERA portal: 10 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
24 of 88Construction stages doneacross 8 buildings; furthest along: Slabs of Super Structure, 80%
1Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

Intelligentia Horizon by Haware Properties is a Others project by Haware Intelligentia Properties LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049437 on 14 Feb 2023. Possession is promised by 31 Dec 2027. 1 complaint is on record with the regulator.

At a glance

Project

  • NameIntelligentia Horizon by Haware Properties
  • TypeOthers
  • Location
    • Bldg 234 237 Kannamwar Nagar
    • Vikhroli East Mumbai
    • Greater Mumbai (M Corp.) (Part) (802794)
    • Mumbai
    • Mumbai Suburban
    • 400083
  • Pincode400083
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800049437
  • ReraGenie IDRG-MH-77243

Builder

  • NameHaware Intelligentia Properties LLP
  • Entity typePartnership
  • PartnersAmit Suresh Haware, Amar Suresh Haware
  • Other registrations1 more →

Key dates

this monthRegisteredFeb 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Feb 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings8 building records
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A Ground ProposedNA20000
Wing A 1 to 27 ProposedNA270000
Wing B Ground ProposedNA10000
Wing B 1 to 27 ProposedNA270000
Wing C Ground ProposedNA10000
Wing C 1 to 27 ProposedNA270000
Wing D Ground ProposedNA10000
Wing D 1 to 27 ProposedNA270000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 10 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

Wing A Ground Proposed11%
ActivityProgress
Excavation100%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing A 1 to 27 Proposed66%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B Ground Proposed11%
ActivityProgress
Excavation100%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B 1 to 27 Proposed63%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing C Ground Proposed11%
ActivityProgress
Excavation100%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing C 1 to 27 Proposed75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Wing D Ground Proposed11%
ActivityProgress
Excavation100%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing D 1 to 27 Proposed75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,248 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Sandeshchandra CHSLKurlaMumbai Suburban

Approvals and building plan

Permissible FSI23542.0
Proposed, not sanctioned23,542 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShree Ganesh CHS Sec 1 Vashi Navi Mumbai

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKalakruti Architects
EngineerPARAS CONSULTANTS
Chartered AccountantSharat Jain
PartnerRole in project
Haware Intelligentia Properties LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600021Bhakti AchrekarHaware Intelligentia Properties LLP08/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - Intelligentia Horizon as on June 2025.pdf10 Jun 2026
Form 2File: Form 2 - Intelligentia Horizon as on June 2025.pdf10 Jun 2026
Form 3File: Form 3 - Intelligentia Horizon as on June 2025.pdf10 Jun 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Intelligentia Horizon as on June 2025.pdf10 Jun 2026
Form 1File: Form 1 - Intelligentia Horizon as on Sep 2025.pdf10 Jun 2026
Form 2File: Form 2 - Intelligentia Horizon as on Sep 2025.pdf10 Jun 2026
Form 3File: Form 3 - Intelligentia Horizon as on Sep 2025.pdf10 Jun 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Intelligentia Horizon as on Sep 2025.pdf10 Jun 2026
Form 1File: Form 1 - Intelligentia Horizon as on Dec 2025.pdf10 Jun 2026
Form 2File: Form 2 - Intelligentia Horizon as on Dec 2025.pdf10 Jun 2026
Form 3File: Form 3 of Intelligentia Horizon as on 31-12-2025.pdf10 Jun 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Intelligentia Horizon as on Dec 2025.pdf10 Jun 2026
Form 1File: Form 1 - Intelligentia Horizon as on March 2026.pdf10 Jun 2026
Form 2File: Form 2 - Intelligentia Horizon as on March 2026.pdf10 Jun 2026
Form 3File: Form 3 - Intelligentia Horizon as on March 2026.pdf10 Jun 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Intelligentia Horizon as on March 2026.pdf10 Jun 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Intelligentia Horizon as on 31-03-2024.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Intelligentia Horizon as on 30-06-2024.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Intelligentia Horizon as on 30-09-2024.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Intelligentia Horizon as on 31-03-2025.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Intelligentia Horizon as on March 2024.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Intelligentia Horizon as on June 2024.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Intelligentia Horizon as on Sep 2024.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Intelligentia Horizon as on March 2025.pdf6 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 of Intelligentia Horizon As on 31-03-2023.pdf6 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 of Intelligentia Horizon As on 31-03-2024.pdf6 May 2025
Proforma of Agreement for saleFile: Intelligentia Horizon AGREEMENT FOR SALE Draft.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Intelligentia Horizon ICICI Format.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Intelligentia Horizon - 31-12-24_compressed.pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Intelligentia Horizon.pdf15 Feb 2025
Details of encumbrances concerned to FinanceFile: Declaration Of Encumbrances- Finance.pdf7 Feb 2025
Details of encumbrances concerned to LegalFile: Declaration Of Encumbrances- Finance.pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 intelligentia Horizon jun 2024_compressed.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: HORIZONE FORM 3 DEC 23_compressed.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Intelligentia Horizon ICICI Format-2023-05-05.pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Intelligentia Horizon ICICI format.pdf12 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 HORIZON_compressed.pdf12 Oct 2023
Details of encumbrances concerned to FinanceFile: Self Declaration Regarding Encumbrances FInancial - Intelligentia Horizon-Feb23updated.pdf8 Feb 2023
Details of encumbrances concerned to LegalFile: Self Declaration Regarding Encumbrances FInancial - Intelligentia Horizon-Feb23updated.pdf8 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf18 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Intelligentia Horizon by Haware Properties updated format copy _compressed.pdf17 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account.pdf10 Dec 2022
Proforma of Agreement for saleFile: Intelligentia Horizon AGREEMENT FOR SALE Draft.pdf5 Dec 2022
Building plan approvalFile: IOA Plan 24 Dec 2021 compressed.pdf17 Nov 2022
Building plan approvalFile: CC Plan Zero FSI compressed.pdf17 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: IOA Plan 24 Dec 2021 compressed.pdf17 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: CC Plan Zero FSI compressed.pdf17 Nov 2022
Copy of the legal title reportFile: Legal Title Report - Kannamwar Nagar.pdf16 Nov 2022
Details of encumbrances concerned to FinanceFile: Self Declaration Regarding Encumbrances FInancial - Intelligentia Horizon.pdf28 Sep 2022
Details of encumbrances concerned to LegalFile: Details Of Legal Encumbrances.pdf28 Sep 2022
Deviation Report with respect to Allotment letterFile: Deviation Report for Model Allotment Letter.pdf28 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report for Model Agreement.pdf28 Sep 2022
Declaration about Commencement CertificateFile: Decluaration About Commencent Certificate.pdf26 Sep 2022
Declaration in FORM BFile: Form B Affidavit HIP LLP_compressed.pdf26 Sep 2022
CERSAI detailsFile: Declaration About cersai.pdf26 Sep 2022
Proforma of Allotment letterFile: PROFORMA ALLOTMENT LETTER.pdf26 Sep 2022
Layout approvalFile: Details Of Legal Encumbrances.pdf21 Sep 2022
Copy of Layout Approval (in case of layout)File: Details Of Legal Encumbrances.pdf21 Sep 2022
PAN CardFile: Haware Intelligentia Properties LLP Pan Card.pdf16 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: CC 22-06-2022_compressed (1).pdf16 Sep 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Intelligentia Horizon by Haware Properties on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vikhroli East Mumbai6,700+ in Mumbai Suburban

2 kmIntelligentia Horizon byCompleted 32Lapsed / revoked 28Other 88Dot size: filed unitsN

Filed coordinates, straight-line distance. 148 registered projects within 2 km.

Builder: Haware Intelligentia Properties LLP

Haware Intelligentia Properties LLP has 2 registrations on MahaRERA, including Intelligentia Axis by Haware Properties and Intelligentia Horizon by Haware Properties. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Intelligentia Horizon by Haware Properties is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Intelligentia Horizon by Haware Properties?

The registered promoter entity is Haware Intelligentia Properties LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Intelligentia Horizon by Haware Properties?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Intelligentia Horizon by Haware Properties?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Intelligentia Horizon by Haware Properties?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Intelligentia Horizon by Haware Properties?

The professionals named in the filing: Architect: Kalakruti Architects; Engineer: PARAS CONSULTANTS; Chartered Accountant: Sharat Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Intelligentia Horizon by Haware Properties?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Intelligentia Horizon by Haware Properties. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Intelligentia Horizon by Haware Properties to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.