Red flags

  • 18 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 296.00 crore secured on the land, in favour of SWAMIH Investment Fund
  • The charge is held by SWAMIH Investment Fund, a distressed-debt buyer or stressed-asset fund rather than an originating lender

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 12 months from the original
6 of 11Construction stages donefurthest along: Internal walls, 35%
55 of 100Units unsoldnot recorded sold or booked
18Complaints at MahaRERAon this registration
Jump to the 140 documents Report an error

India International Tower (A6) - upto 13th Floor is a Residential / Group Housing project by Rare Townships Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800001034 on 25 Jul 2017. Possession is promised by 30 Dec 2027. The completion date has moved by 12 months from the original filing. 45 of the 100 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 18 complaints are on record with the regulator.

At a glance

Project

  • NameIndia International Tower (A6) - upto 13th Floor
  • TypeResidential / Group Housing
  • Location
    • Mankhurd Ghatkopar Link Road
    • Ghatkopar East
    • Kurla
    • Mumbai Suburban
    • 400077
  • Pincode400077
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800001034
  • ReraGenie IDRG-MH-11020

Builder

  • NameRare Townships Private Limited
  • Entity typeCompany
  • CINU70102MH2000PTC126999
  • DirectorDattatreya V Prabhu
  • Other registrations15 more →
  • Completed9 of 16
  • No longer live5 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2017First promiseDec 2026Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Jul 2017
  • Promised completion30 Dec 2027
  • Revised completionRevised to 30 Dec 2027 (originally 30 Dec 2026)
  • Buildings1 building record
  • Documents filed140 files

Current status

45%45 of 100 units booked
61.8%Work done, per cost certificate

Figures as on 20 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Rising City - The India International - Upto 13th FloorNA16131000100

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 35%.

Rising City - The India International - Upto 13th Floor: 64% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes10%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes10%
Landscaping & Tree PlantingYes80%
Street LightingYes90%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes10%
Solid Waste Management And DisposalYes10%
Water conservation /Rain water harvestingYes10%
Energy managemcntYes10%
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed144

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots144
Closed/Covered125
Open Space19

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,315 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofSWAMIH Investment Fund
Secured amountRs 296.00 crore
CERSAI search filedYes
Declared on3 Oct 2024

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI13007.22
Proposed, not sanctioned8,797 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch101-102, Vasant Niwas Bldg, Tilak Road and Vallabh Baug Junction, Ghatkopar East, Mumbai - 400077
Estimated costRs 62.50 cr
Cost incurredRs 38.60 cr
Work done61.76%
BuildingWingEstimatedIncurred
Rising City - The India International - Upto 13th FloorNARs 58.37 crRs 38.60 cr
-NARs 4.13 cr-

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAAKAR ARCHITECTS (Mr. UMESH PAWAR)
ArchitectCitygold Management Service Private Limited
ArchitectSUSAN JOHN
EngineerJW Consultant LLP (Mr.Achyut Watve)
EngineerPANDURANG BHOLTE
Chartered AccountantNiraj D. Adatia & Associates
Chartered AccountantMaloo Rathod and Companny
Chartered AccountantNDDA & ASSOCIATES LLP CHARTERED ACCOUNTANT
Chartered AccountantSanket R Shah & Associates Chartered Accountants
PartnerRole in project
Rare Townships Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800018629Dec 2026 → Dec 2027

Reason as filed by the promoterApplication for extension under Rule 6 of MahaRERA Act, 2016.

Complaints filed with MahaRERA18

Case no.ComplainantRespondentFiled
CC006000000012464Rajiv kumar BassiRARE TOWNSHIPS PVT LTD23/12/2017
CC006000000193664Amit PalRare Townships Private Limited05/08/2020
CC006000000193668Amit PalRare Townships Private Limited05/08/2020
CC006000000192810Manoranjan GhoshRare Townships Private Limited03/03/2020
CC006000000198553Shaila Dilip Targe PatilRare Township Private Limited04/10/2021
CC006000000198763Anshul Bansal & Priyanka KheraRareTownshis Pvt Ltd21/10/2021
CC006000000198949RARE TOWNSHIPS PRIVATE LIMITEDAMIT PAL07/11/2021
CC006000000198950RARE TOWNSHIPS PRIVATE LIMITEDAMIT PAL07/11/2021
CC006000000428692Rare Township Private LimitedAnshuman Atri08/01/2024
CC006000000428737Rare Township Private LimitedManoranjan Ghosh13/01/2024
CC006000000199026Anshuman AtriRareTownshis Pvt Ltd13/11/2021
CC006000000220646Sri. Karthik VelamakanniRareTownshis Pvt Ltd01/04/2022
CC12502685Rare Township Private LimitedPramod Kumar Sapra01/08/2025
CC12503485Rare Township Private LimitedMr Irshad Ahmed Ansari29/09/2025
CC12504518Naveen SinghalRare Townships Private Limited18/12/2025
CC12600352Rare Township Private LimitedMr Shadab Raza Mushfique Raza Syed19/01/2026
CC12600629Rare Township Private LimitedAftab Raza Mushfique Raza Syed03/02/2026
CC12600630Rare Township Private LimitedShahenshah Hussain Mushfique Raza Syed03/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Aug 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2027

Documents filed140

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 140 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM - I P51800001034 - RTPL INDIA INTERNATIONAL TOWER (A6) UPTO13TH FLOOR.pdf20 May 2026
Withdrawal Update Form 2File: FORM - II -upto13th FL.pdf20 May 2026
Withdrawal Update Form 3File: Form III- India International Tower (A6) (Mar 26) - upto 13th Flr..pdf20 May 2026
Withdrawal Update Form 1File: P51800001034 - RTPL INDIA INTERNATIONAL TOWER (A6) UPTO13TH FLOOR.pdf6 May 2026
Withdrawal Update Form 2File: Form II_A6- upto 13th FL.pdf6 May 2026
Withdrawal Update Form 3File: A6-P1_Withdrawal Application Form III.pdf6 May 2026
Withdrawal Update Form 1File: P51800001034 - RTPL INDIA INTERNATIONAL TOWER A6 UPTO 13TH FLOOR.pdf27 Nov 2025
Withdrawal Update Form 2File: Tower A6 - Upto 13th Flr.pdf27 Nov 2025
Withdrawal Update Form 3File: FORM-III_RTPL_A6_13F.pdf27 Nov 2025
Form 5 (FY 2024-2025)File: FORM5 - A6-13th FL.pdf5 Oct 2025
Form 1File: P51800001034 - RTPL IIT (A6) UPTO 13TH FLOORS.pdf14 Aug 2025
Form 2File: Form II_India International Tower-upto 13th floor.pdf14 Aug 2025
Form 3File: CA Form III_India International Tower- upto 13th floor.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: India International tower_upto 13th floor.pdf14 Aug 2025
Form 1File: P51800001034 - RTPL IIT (A6) UPTO 13TH FLOORS.pdf29 May 2025
Form 2File: India International Tower (A6) - upto 13th Floor (2).pdf29 May 2025
Form 3File: RTPL Form 3 A6-PH-1-31-03-25.pdf29 May 2025
Certificates of CA (Form 3)File: RTPL Form 3 A6-PH-1-31-03-25_compressed.pdf22 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800001034 - RTPL IIT (A6) UPTO 13TH FLOORS.pdf30 Apr 2025
Certificates of CA (Form 3)File: RTPL Form 3 A6-PH-1-31-12-24_compressed.pdf30 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: India International Tower (A6) - upto 13th Floor.pdf30 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: India International Tower (A6) - upto 13th Floor (2).pdf30 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800001034 - RTPL IIT (A6) UPTO 13TH FLOORS.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: A6-Phase I.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RTPL Form 5 A6-PH-1-31-03-24.pdf14 Nov 2024
Certificates of CA (Form 3)File: RTPL Form 3 A6-PH-1-30-09-24.pdf22 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A6-Ph-I.pdf19 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 16 A-6 Flr upto 13.pdf19 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A6-PH-I.pdf20 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A-6 Flr upto 13.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: India Intl Tower_Ph I.pdf20 Jul 2024
Certificates of CA (Form 3)File: RTPL Form 3 A6-PH-1-30-06-24.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: IIT - 1.pdf3 May 2024
Layout approvalFile: A6-PH-I-LAYOUT_compressed.pdf26 Apr 2024
Building plan approvalFile: RTPL- Amended building plan approval 29122023.pdf26 Apr 2024
Building plan approvalFile: A6-PH-I-LAYOUT_compressed.pdf26 Apr 2024
Building plan approvalFile: A6-PH-I-BUA_compressed.pdf26 Apr 2024
Details of encumbrancesFile: Encumbrance Certificate-IIT-1.pdf26 Apr 2024
Copy of Layout Approval (in case of layout)File: A6-PH-I-LAYOUT_compressed.pdf26 Apr 2024
Building Plan Approval (IOD)File: RTPL- Amended building plan approval 29122023.pdf26 Apr 2024
Building Plan Approval (IOD)File: A6-PH-I-LAYOUT_compressed.pdf26 Apr 2024
Building Plan Approval (IOD)File: A6-PH-I-BUA_compressed.pdf26 Apr 2024
Declaration about Commencement CertificateFile: A6-PH-I.pdf26 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A6-I.pdf26 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A6-IIT- upto 13 th.pdf26 Apr 2024
Disclosure of sold/ booked inventoryFile: A6-Phase_1.pdf26 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200303820704_India International Tower.pdf26 Apr 2024
Certificates of CA (Form 3)File: RTPL Form 3 A6-PH-1-31-12-23_compressed.pdf26 Apr 2024
Certificates of CA (Form 3)File: RTPL Form 3 A6-PH-1-31-03-24.pdf26 Apr 2024
Proforma of Agreement for saleFile: A6-AFS.pdf26 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate bank account letters-IIT-1.pdf26 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: A-6 1to 13.pdf5 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A6-I.pdf1 Mar 2024
Building plan approvalFile: 01-08_Building plans.pdf22 Feb 2024
Building plan approvalFile: 09-15_Building plans.pdf22 Feb 2024
Building plan approvalFile: 16-22_Building plans.pdf22 Feb 2024
Building plan approvalFile: 23-29_Building plans.pdf22 Feb 2024
Building Plan Approval (IOD)File: 01-08_Building plans.pdf22 Feb 2024
Building Plan Approval (IOD)File: 09-15_Building plans.pdf22 Feb 2024
Building Plan Approval (IOD)File: 16-22_Building plans.pdf22 Feb 2024
Building Plan Approval (IOD)File: 23-29_Building plans.pdf22 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: RTPL Sale CC - Revalidated till 10022025.pdf22 Feb 2024
Building plan approvalFile: RTPL- B1 Ammendement approval 29122023.pdf21 Feb 2024
Layout approvalFile: Layout plan-rtpl.pdf21 Feb 2024
Copy of Layout Approval (in case of layout)File: Layout plan-rtpl.pdf21 Feb 2024
Building Plan Approval (IOD)File: RTPL- B1 Ammendement approval 29122023.pdf21 Feb 2024
Declaration about Commencement CertificateFile: A6.pdf2 Feb 2024
Declaration in FORM BFile: India International_upto 13th floor_Form B.pdf2 Feb 2024
Disclosure of sold/ booked inventoryFile: A6-Phase_16.pdf2 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest_DVP.pdf2 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest_SM.pdf2 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration_Seperate Bank_Ind Intl upto 13.pdf2 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A6-PH- I.pdf22 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 2408573_FurtherCC_signed.pdf4 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RTPL Form 5 A6-PH-1-31-03-23.pdf20 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A6-PH- I.pdf31 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A6-P_13 FI.pdf31 Oct 2023
Certificates of CA (Form 3)File: RTPL Form 3 A6-PH-1-30-09-23_compressed.pdf31 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A6-I.pdf12 Oct 2023
Certificates of CA (Form 3)File: RTPL Form 3 A6-PH-1-30-06-23.pdf16 Aug 2023

How this compares with Mumbai Suburban

45%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep India International Tower (A6) - upto 13th F on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghatkopar East6,700+ in Mumbai Suburban

2 kmIndia International ToweCompleted 125Lapsed / revoked 90Other 125Dot size: filed unitsN

Filed coordinates, straight-line distance. 340 registered projects within 2 km.

Builder: Rare Townships Private Limited

Rare Townships Private Limited has 16 registrations on MahaRERA, including North Sea Heights (A1) - 19th floor and North Sea Heights (A1) - upto 14th floor. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if India International Tower (A6) - upto 13th Floor is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of India International Tower (A6) - upto 13th Floor?

The registered promoter entity is Rare Townships Private Limited, a company as per the filing. Its CIN U70102MH2000PTC126999 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in India International Tower (A6) - upto 13th Floor?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against India International Tower (A6) - upto 13th Floor?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for India International Tower (A6) - upto 13th Floor?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at India International Tower (A6) - upto 13th Floor?

The professionals named in the filing: Architect: AAKAR ARCHITECTS (Mr. UMESH PAWAR); Architect: Citygold Management Service Private Limited; Architect: SUSAN JOHN; Engineer: JW Consultant LLP (Mr.Achyut Watve); Engineer: PANDURANG BHOLTE; Chartered Accountant: Niraj D. Adatia & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in India International Tower (A6) - upto 13th Floor?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About India International Tower (A6) - upto 13th Floor. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save India International Tower (A6) - upto 13th F to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.