Home / Browse projects / Mumbai Suburban, Maharashtra / Houston Residency (A2) - upto 14th floor

Registration lapsed No litigation declared Residential / Group Housing project

Houston Residency (A2) - upto 14th floor

By Rare Townships Private Limited

RG-MH-10989 · RERA P51800000937 · Last updated on MahaRERA portal: 31 Jul 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 6 months past the filed date
  • 18 complaints at MahaRERA
  • Completion date moved by 16 months
  • 2 extensions taken
  • Rs 296.00 crore secured on the land, in favour of SWAMIH Invesment Fund
  • The charge is held by SWAMIH Invesment Fund, a distressed-debt buyer or stressed-asset fund rather than an originating lender

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

7 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2026Possession promised6 months past this date
11 of 11Construction stages doneevery applicable stage filed complete
25 of 84Units unsoldnot recorded sold or booked
18Complaints at MahaRERAon this registration
Jump to the 140 documents Report an error

Houston Residency (A2) - upto 14th floor is a Residential / Group Housing project by Rare Townships Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800000937 on 25 Jul 2017. Possession was promised by 30 Apr 2026 and is now 6 months past that date. The completion date has moved by 16 months from the original filing. 59 of the 84 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete. 18 complaints are on record with the regulator.

At a glance

Project

  • NameHouston Residency (A2) - upto 14th floor
  • TypeResidential / Group Housing
  • Location
    • Mankhurd Ghatkopar Link Road
    • Ghatkopar East
    • Ghatkopar
    • Kurla
    • Mumbai Suburban
    • 400077
  • Pincode400077
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800000937
  • ReraGenie IDRG-MH-10989

Builder

  • NameRare Townships Private Limited
  • Entity typeCompany
  • CINU70102MH2000PTC126999
  • DirectorDattatreya V Prabhu
  • Other registrations15 more →
  • Completed9 of 16
  • No longer live5 lapsed, de-registered or revoked

Key dates

6 months past promisethis monthRegisteredJul 2017First promiseDec 2024Revised toApr 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on25 Jul 2017
  • Promised completion30 Apr 2026
  • Revised completionRevised to 30 Apr 2026 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed140 files

Current status

70%59 of 84 units booked
82.8%Work done, per cost certificate

Figures as on 31 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Rising City - Houston Residency Upto 14 FloorNA171584084

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Rising City - Houston Residency Upto 14 Floor: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 31 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes95%
Street LightingYes95%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed122

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots122
Closed/Covered122

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area25,000 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofSWAMIH Invesment Fund
Secured amountRs 296.00 crore
CERSAI search filedYes
Declared on1 Oct 2024
LandownerVillageDistrict
MR SHRENIK MEHTAGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI7075.47
Proposed, not sanctioned7,075 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch101-102, Vasant Niwas Bldg, Tilak Road and Vallabh Baug Junction, Ghatkopar East, Mumbai - 400077
Estimated costRs 49.18 cr
Cost incurredRs 40.71 cr
Work done82.78%
BuildingWingEstimatedIncurred
Rising City - Houston Residency Upto 14 FloorNARs 46.03 crRs 40.71 cr
-NARs 3.15 cr-

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAAKAR ARCHITECTS (Umesh Pawar)
ArchitectCitygold Management Service Private Limited
EngineerPANDURANG BHOITE
EngineerStructural Engg:- JW+ Cosulants LLP (Mr.Achyut Watve)
EngineerJW Consultants LLP
Chartered AccountantMaloo Rathod and Company
Chartered AccountantNiraj D. Adatia & Associates
Chartered AccountantNDDA & ASSOCIATES LLP CHARTERED ACCOUNTANT
Chartered AccountantSanket R Shah & Associates Chartered Accountants
PartnerRole in project
Rare Townships Private Limited-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800018616Dec 2024 → Dec 2025

Reason as filed by the promoterDue to several circumstances and events which mentioned in attached documents that have been beyond the control of the Promoter anticipates further deferral in the timeline of the project completion date.

EA20022619923Dec 2024 → Apr 2026

Reason as filed by the promoterConstruction completed before due date , however OC received late due to election duties for the government officers.

Complaints filed with MahaRERA18

Case no.ComplainantRespondentFiled
CC006000000000437Gurcharan Singh MataHemant M shah08/09/2017
CC006000000022979Ravi Gupta and Shikha GuptaRARE TOWNSHIPS PVT LTD18/01/2018
CC006000000197166Suresh M. RungtaRARE Townships Private Limited06/06/2021
CC006000000197167MAHESH M. RUNGTARARE Townships Private Limited06/06/2021
CC006000000055893SURESH SINHARare Townships Private Limited22/08/2018
CC006000000193066Ritesh GarodiaRare Townships Pvt Ltd18/03/2020
CC006000000209529Shailaja Karve and Mihir KarveRare Township Private Limited24/12/2021
CC006000000193645Mr. Shiv MuttooRare Townships Private Limited31/07/2020
CC006000000196310Ms. Sushma JhaveriRare Townships Private Limited09/03/2021
CC006000000197443Kalpana Jagdish MisraRare Township Private Limited31/07/2021
CC006000000500584RARE TOWNSHIPS PRIVATE LIMITEDSuresh Sinha27/05/2024
CC12501164Madan Mohan PandeyRare Townships Private Limited08/04/2025
CC12501188Geeta MenonMrs Jyoti Ajay Pancholi09/04/2025
CC12501834Rare township private limitedMr Ritesh Agrawal04/06/2025
CC12501845RARE TOWNSHIPS PRIVATE LIMITEDMr Sanjay Ganpat Tapal05/06/2025
CC12501844RARE TOWNSHIPS PRIVATE LIMITEDAniruddha Vinay Kadu05/06/2025
CC12503384Mahendra pratap SinghRare Townships Private Limited22/09/2025
CC12503816Aniruddha KaduRare Townships Private Limited31/10/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Aug 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed140

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 140 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Houston Residency upto-14th floor.pdf31 Jul 2026
Withdrawal Update Form 1File: FORM -I P51800000937 - RTPL HOUSTON RESIDENCY (A2) UPTO 14TH FLOORS.pdf22 Jul 2026
Withdrawal Update Form 2File: FORM -II A2-Upto 14th Floor.pdf22 Jul 2026
Withdrawal Update Form 3File: Form III- Houston Residency (A2) (June 26) - upto 14th Flr signed.pdf22 Jul 2026
Layout approvalFile: Rising CITY A2 PHASE - I layout plan.pdf26 Jun 2026
Building plan approvalFile: A2 - phase- I Drawing.pdf26 Jun 2026
Building plan approvalFile: A2 - phase- I- Drawing 2.pdf26 Jun 2026
Withdrawal Update Form 1File: FORM - I P51800000937 - RTPL HOUSTON RESIDENCY (A2) UPTO 14TH FLOORS.pdf16 May 2026
Withdrawal Update Form 2File: FORM II -upto14th FL.pdf16 May 2026
Withdrawal Update Form 3File: FORM - III Houston Residency (A2) (Mar 26) - upto 14th Flr.pdf16 May 2026
Withdrawal Update Form 1File: FORM - I P51800000937 - RTPL HOUSTON RESIDENCY (A2) UPTO 14TH FLOORS.pdf12 May 2026
Withdrawal Update Form 2File: FORM II -upto14th FL.pdf12 May 2026
Withdrawal Update Form 3File: FORM - III Houston Residency (A2) (Mar 26) - upto 14th Flr.pdf12 May 2026
Layout approvalFile: Amended Highilighted Layout.pdf15 Apr 2026
Form 2A (FY 2024-2025)File: Houston Residency (A2) - upto 14th floor.pdf5 Mar 2026
Withdrawal Update Form 1File: P51800000937 - FORM 1 - RTPL HOUSTON RESIDENCY (A2) UPTO 14TH FLOORS.pdf9 Feb 2026
Withdrawal Update Form 2File: FORM 2_P51800000937_RTPL Engineers Certificate A2_upto 14th FL.pdf9 Feb 2026
Withdrawal Update Form 3File: RTPL A2 14 Floor Form_3.pdf9 Feb 2026
Withdrawal Update Form 1File: P51800000937 - RTPL HOUSTON RESIDENCY (A2) UPTO 14TH FLOOR.pdf27 Nov 2025
Withdrawal Update Form 2File: Tower_A2_-_Upto_14th_Flr[1].pdf27 Nov 2025
Withdrawal Update Form 3File: FORM-III_RTPL_A2_14F.pdf27 Nov 2025
Form 5 (FY 2024-2025)File: FORM5 - A2-14th FL.pdf5 Oct 2025
Form 1File: P51800000937 - RTPL HOUSTON RESIDENCY (A2) UPTO 14TH FLOORS.pdf14 Aug 2025
Form 2File: Form II_Houston Residency_upto 14th floor.pdf14 Aug 2025
Form 3File: CA Form III_Houston Residency_upto 14th floor.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Houston Residency_upto 14th floor.pdf14 Aug 2025
Form 1File: P51800000937 - RTPL HOUSTON RESIDENCY (A2) UPTO 14TH FLOORS.pdf29 May 2025
Form 2File: Houston Residency (A2) - upto 14th floor.pdf29 May 2025
Form 3File: RTPL Form 3 A2-PH-1-31-03-25.pdf29 May 2025
Certificates of CA (Form 3)File: RTPL Form 3 A2-PH-1-31-03-25_compressed.pdf22 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800000937 - RTPL HOUSTON RESIDENCY (A2) UPTO 14TH FLOORS.pdf30 Apr 2025
Certificates of CA (Form 3)File: RTPL Form 3 A2-PH-1-31-12-24_compressed.pdf30 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Houston Residency (A2) - upto 14th floor.pdf30 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Houston Residency (A2) - upto 14th floor.pdf30 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - HR_upto14th floor_FY 2023-24.pdf1 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800000937 - RTPL HOUSTON RESIDENCY (A2) UPTO 14TH FLOORS.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: A2-Phase I.pdf20 Jan 2025
Certificates of CA (Form 3)File: RTPL Form 3 A2-PH-1-30-09-24.pdf22 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A2-Ph-I.pdf19 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 04 A-2 Flr up to 14.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Documents of sold-Hou 1.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Houston Residency_Ph I.pdf20 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A2-PH-I.pdf18 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A-2 Flr up to 14.pdf18 Jul 2024
Layout approvalFile: A2-PH-I-LAYOUT_compressed (2).pdf2 May 2024
Copy of Layout Approval (in case of layout)File: A2-PH-I-LAYOUT_compressed (2).pdf2 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: HR - 1.pdf2 May 2024
Layout approvalFile: A2-PH-I-LAYOUT_compressed (1).pdf24 Apr 2024
Details of encumbrancesFile: Encumbrance Certificate-HR-1.pdf24 Apr 2024
Copy of Layout Approval (in case of layout)File: A2-PH-I-LAYOUT_compressed (1).pdf24 Apr 2024
Building plan approvalFile: RTPL- Amended building plan approval 29122023.pdf23 Apr 2024
Building plan approvalFile: A2-PH-I-LAYOUT_compressed.pdf23 Apr 2024
Building plan approvalFile: A2-PH-I- BUA_compressed.pdf23 Apr 2024
Building Plan Approval (IOD)File: RTPL- Amended building plan approval 29122023.pdf23 Apr 2024
Building Plan Approval (IOD)File: A2-PH-I-LAYOUT_compressed.pdf23 Apr 2024
Building Plan Approval (IOD)File: A2-PH-I- BUA_compressed.pdf23 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: RTPL Sale CC - Revalidated till 10022025.pdf23 Apr 2024
Declaration about Commencement CertificateFile: A2-PH-I.pdf23 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A2-I.pdf23 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A-2-HR-upto 14 th.pdf23 Apr 2024
Disclosure of sold/ booked inventoryFile: A2-Phase_1.pdf23 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200303820212_Houston Residency.pdf23 Apr 2024
Certificates of CA (Form 3)File: RTPL Form 3 A2-PH-1-31-12-23_compressed.pdf23 Apr 2024
Certificates of CA (Form 3)File: RTPL Form 3 A2-PH-1-31-03-24.pdf23 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest_SM.pdf23 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest_DVP.pdf23 Apr 2024
Proforma of Agreement for saleFile: A2-AFS.pdf23 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate bank account letters-HR-1.pdf23 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: A-2 1 to 14.pdf5 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A2-I.pdf1 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Houston Residency (A2) P-14.pdf29 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A2-P_14FI.pdf23 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A2-PH-I.pdf22 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 2408573_FurtherCC_signed.pdf4 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RTPL Form 5 A2-PH-1-31-03-23.pdf20 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A2-PH-I.pdf27 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A2-P_14 FI.pdf27 Oct 2023
Certificates of CA (Form 3)File: RTPL Form 3 A2-PH-1-30-09-23.pdf27 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A2-I.pdf12 Oct 2023
Certificates of CA (Form 3)File: RTPL Form 3 A2-PH-1-30-06-23.pdf16 Aug 2023

How this compares with Mumbai Suburban

70%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 16 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Houston Residency (A2) - upto 14th floor on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghatkopar East6,700+ in Mumbai Suburban

2 kmHouston Residency (A2) -Completed 125Lapsed / revoked 88Other 124Dot size: filed unitsN

Filed coordinates, straight-line distance. 337 registered projects within 2 km.

Builder: Rare Townships Private Limited

Rare Townships Private Limited has 16 registrations on MahaRERA, including North Sea Heights (A1) - 19th floor and North Sea Heights (A1) - upto 14th floor. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Houston Residency (A2) - upto 14th floor shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Houston Residency (A2) - upto 14th floor is delayed beyond 30 Apr 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Houston Residency (A2) - upto 14th floor?

The registered promoter entity is Rare Townships Private Limited, a company as per the filing. Its CIN U70102MH2000PTC126999 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Houston Residency (A2) - upto 14th floor?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Houston Residency (A2) - upto 14th floor?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Houston Residency (A2) - upto 14th floor?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Houston Residency (A2) - upto 14th floor?

The professionals named in the filing: Architect: AAKAR ARCHITECTS (Umesh Pawar); Architect: Citygold Management Service Private Limited; Engineer: PANDURANG BHOITE; Engineer: Structural Engg:- JW+ Cosulants LLP (Mr.Achyut Watve); Engineer: JW Consultants LLP; Chartered Accountant: Maloo Rathod and Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Houston Residency (A2) - upto 14th floor?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Houston Residency (A2) - upto 14th floor. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Houston Residency (A2) - upto 14th floor to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.