HIVE BY SUMADHURA
By SUMADHURA INFRACON PRIVATE LIMITED
RG-KA-07428 · RERA PRM/KA/RERA/1251/446/PR/051024/007123 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
HIVE BY SUMADHURA is a Commercial project by SUMADHURA INFRACON PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/051024/007123 on 5 Oct 2024. Possession is promised by 31 Dec 2026. 5 of the 45 units on this registration are recorded sold or booked, and 10 of 18 construction stages are filed complete.
At a glance
Project
- NameHIVE BY SUMADHURA
- TypeCommercial
- Location
- Bengaluru East
- Bengaluru Urban
- 560037
- Pincode560037
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/051024/007123
- ReraGenie IDRG-KA-07428
Builder
- NameSUMADHURA INFRACON PRIVATE LIMITED
- Entity typeCompany
- CINU45200KA2012PTC062071
- GSTIN29AAQCS9641A1ZZ
- Authorized SignatoryBHARAT KUMAR KANDUKURI
- Chairman and Managing DirectorGUNDA MADHUSUDHAN
- DirectorsBHARAT KUMAR KANDUKURI, KALAKUNTLA VENKATA RAMA RAO, G NAVEEN KUMAR, G SWAPNA, G MADHUSUDHAN, RAHUL KANDUKURI
- Project HeadK MAHESH
- Other registrations20 more →
- Declared earlier projects16 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on5 Oct 2024
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed144 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHOPS AND OFFICES | - | - | - | 0 | 45 | 45 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 18 construction stages are filed complete. The stage furthest along is Railing and Grill fixing, at 95%.
Building: 85% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 90% |
| Basic work of Water supply, Sanitary and Electrification | 60% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 90% |
| Railing and Grill fixing | 95% |
| Electrification, Water supply and Sanitary Finishing | 65% |
| Painting | 55% |
| Fire prevention and fire fighting fitting and fixture with network | 100% |
| Weather Proof work(tile,concrete) | 100% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 60% |
| Internal and External work including landscapes as per sanctioned drawings | 15% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 72% |
| Sewage and Drainage System | Yes | 100% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 100% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Solid waste management and disposal | Yes | 100% |
| Emergency Evacuation services | Yes | 95% |
| Internal Roads & Footpaths | Yes | 100% |
| Electricity supply transformer and substation | Yes | 95% |
| Storm water drains | Yes | 60% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 100% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | Yes | 10% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | Yes | 95% |
| Corridor/Lobbies | Yes | 90% |
| Fire escapes | Yes | 100% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 90% |
| Basement | Yes | 90% |
| Terrace | Yes | 95% |
| Outer Wall | Yes | 100% |
| Open parking areas | Yes | 10% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Sri SRINIVAASAN M/s SRI CHAMUNDESWARI SUGARS LIMITED SRINIVAASAN | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 46.97 cr | Rs 8.64 cr |
| Payment of taxes | Rs 29.07 cr | Rs 2.71 cr |
| On-site expenditure-Site Overhead | Rs 6.61 cr | - |
| On-site expenditure-Consultants Fees | Rs 81.75 lakh | Rs 49.09 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Gnanavel T |
| Engineer | Arun Sirkanth Nadig |
| Chartered Accountant | CH PRANAY KUMAR |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed144
As listed on the registration, under the names the promoter filed them with; the newest 80 of 144 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/051024/007123 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate-300926 Hive_0001.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate-300926 Hive.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate 300926-Hive.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 CA Certificate 300626-Hive_0001.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate-30062026 Hive.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate 300626-Hive.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate 310326-Hive.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate-310326-HIVE.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate 310326 Hive - converted.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate 31122025 Hive.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 6 Engineer Certificate-Hive 31122025.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate-Hive 31122025.pdf | 14 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 14 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 14 Jan 2026 |
| Q3 2025-26 Fire and Safety | 14 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 14 Jan 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 14 Jan 2026 |
| Bank affidavit estimated project costFile: Affidavit Bank notarized.pdf | 27 Sep 2024 |
| Form 1 CA Certificate HiveFile: Form 1 CA Certificate Hive.pdf | 27 Sep 2024 |
| SIPL Audited Financials FY 2020-21File: SIPL Audited Financials FY 2020-21.pdf | 27 Sep 2024 |
| SIPL Audited Financials FY 2021-22File: SIPL Audited Financials FY 2021-22.pdf | 27 Sep 2024 |
| SIPL Audited Financials FY 2022-23File: SIPL Audited Financials FY 2022-23.pdf | 27 Sep 2024 |
| CA adhar self attestedFile: CA adhar self attested.pdf | 27 Sep 2024 |
| CA licence(self attested)File: CA licence(self attested).pdf | 27 Sep 2024 |
| Fee Receipt Balance AmountFile: Fee Receipt Balance Amount.pdf | 27 Sep 2024 |
| Mother Conversion orderFile: Mother Conversion order.pdf | 27 Sep 2024 |
| Title deed of the land ownerFile: Title deed of the land owner.pdf | 27 Sep 2024 |
| notarized affidavit litigations /non-litigationFile: Affidivat_Non-Litigation.pdf | 27 Sep 2024 |
| JD Affidavit cum Declaration Promoter and LandownerFile: JD Affidavit cum Declaration Promoter and Landowner.pdf | 27 Sep 2024 |
| Advocate Search Report HiveFile: Advocate Search Report Hive.pdf | 27 Sep 2024 |
| Form 3 Engineer Certificate Hive formatFile: Form 3 Engineer Certificate Hive.pdf | 27 Sep 2024 |
| Amenities and Common area details calculation sheet certified by the Engineer HiveFile: Amenities and Common area details calculation sheet certified by the Engineer Hive.pdf | 27 Sep 2024 |
| Structural License self attestedFile: Structural License self attested.pdf | 27 Sep 2024 |
| Brief estimated cost of construction certified by the Engineer HIVEFile: Brief estimated cost of construction certified by the Engineer HIVE.pdf | 27 Sep 2024 |
| Project Specifications signed HIVEFile: Project Specifications signed HIVE.pdf | 27 Sep 2024 |
| Notarized Affidavit for 3(1) Voliation ACKFile: Notarized Affidavit for 3(1) Voliation ACK.pdf | 27 Sep 2024 |
| Allotment Letter - Hive by SumadhuraFile: Allotment Letter - Hive by Sumadhura.pdf | 27 Sep 2024 |
| Agreement of Sale Proforma HiveFile: Agreement of Sale Proforma Hive.pdf | 27 Sep 2024 |
| NOC HAL HIVEFile: NOC HAL HIVE.pdf | 27 Sep 2024 |
| STP design drawing certified by the Engineer as per the guidelines of KSPCB NOC.File: STP design drawing certified by the Engineer as per the guidelines of KSPCB NOC Hive.pdf | 27 Sep 2024 |
| Land cost calculation sheet as per the guidance value(Self-attested copy) HiveFile: Land cost calculation sheet as per the guidance value(Self-attested copy) Hive.pdf | 27 Sep 2024 |
| Approved Sanction Plan setFile: Approved Plan HIVE.pdf | 27 Sep 2024 |
| RTC, survey 8/2 | - |
| Mutation, survey 8/2 | - |
| Encumbrance Certificate, survey 8/2 | - |
| Conversion/Alienation Order, survey 8/2 | - |
| JDA, survey 8/2 | - |
| Khatha, survey 8/2 | - |
| Registration CertificateFile: Company Registration Certificate.PDF | - |
| Memorandum of AssociationFile: MOA.pdf | - |
| Article of AssociationFile: AOA.pdf | - |
| Organization StructureFile: Organaisation Chart.pdf | - |
| Certificate issued by CA Form 1File: Form 1 CA Certificate Hive.pdf | - |
| Certificate issued by Architect Form 2File: Form 2 Architect Certificate Hive.pdf | - |
| Certificate issued by Engineer Form 3File: Form 3 Engineer Certificate Hive.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: JD Affidavit cum declaration.pdf | - |
| Balance Sheet 2022 - 2023File: SIPL Balance sheet FY2022-23.pdf | - |
| Balance Sheet 2021 - 2022File: SIPL Balance Sheet FY 2021-22.pdf | - |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| FOLIUM BY SUMADHURA PHASE-I | BBMP Katha No 650/389 Sy No 47/1 47/2A & B 48/3 48/4 47/3 Whitefiled Village K R Puram Hobli Bangalore East Taluk | Ongoing | Jun 2025 | Not delivered |
| SUMADHURA SUSHANTHAM PHASE-II | BBMP Katha No 1583 Sy No 3/7 3/8A 3/8B 3/8C Thindlu Village Yelahanka Hobli Bangalore North Taluk | Ongoing | Dec 2024 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep HIVE BY SUMADHURA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 45 registered projects within 2 km.
MAITHRI SPRINGWOODS
MAITHRI DEVELOPERS
Century Mirai Ph1
Century Silicon City Private Limited
MYHNA ORCHID
MYHNA ESTATE PROJECTS
INNOVATIVE PALACIA
SHUBANKARA DEVELOPERS
Saideep Hiranya
Shri Saideep Srinidhi Buildcon LLP
77° LIFE
DivyaSree Infrastructure Projects Private
See every Bengaluru Urban project, with the district possession charts
Builder: SUMADHURA INFRACON PRIVATE LIMITED
SUMADHURA INFRACON PRIVATE LIMITED has 21 registrations on RERA Karnataka, including Sumadhura Belfort and SUMADHURA SUSHANTHAM PHASE I. Its filings declare 16 earlier projects, 11 of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if HIVE BY SUMADHURA is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of HIVE BY SUMADHURA?
The registered promoter entity is SUMADHURA INFRACON PRIVATE LIMITED, a company as per the filing. Its CIN U45200KA2012PTC062071 and GSTIN 29AAQCS9641A1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in HIVE BY SUMADHURA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at HIVE BY SUMADHURA?
The professionals named in the filing: Architect: Gnanavel T; Engineer: Arun Sirkanth Nadig; Chartered Accountant: CH PRANAY KUMAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HIVE BY SUMADHURA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback