Home / Browse projects / Bengaluru Urban, Karnataka / HIMA SAI HEIGHTS

Registration approved Mixed Development project

HIMA SAI HEIGHTS

By HIMAGIRI BUILDERS AND DEVELOPERS PRIVATE LIMITED

RG-KA-02904 · RERA PRM/KA/RERA/1251/310/PR/200908/003590 · Last updated on RERA Karnataka portal: 26 Aug 2020

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Aug 2024Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 93 documents Report an error

HIMA SAI HEIGHTS is a Mixed Development project by HIMAGIRI BUILDERS AND DEVELOPERS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/200908/003590 on 8 Sep 2020. Possession is promised by 28 Aug 2024. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameHIMA SAI HEIGHTS
  • TypeMixed Development
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/200908/003590
  • ReraGenie IDRG-KA-02904

Builder

  • NameHIMAGIRI BUILDERS AND DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • CINU70102TG2016PTC104099
  • Authorized SignatoryBAPU REDDY KOMMULA
  • DirectorBAPU REDDY KOMMULA

Key dates

this monthRegisteredSep 2020First promiseAug 2023Revised toAug 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on8 Sep 2020
  • Promised completion28 Aug 2024
  • Revised completionRevised to 28 Aug 2024 (originally 28 Aug 2023)
  • Buildings1 building record
  • Documents filed93 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
HIMA SAI HEIGHTS---55055

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 26 Aug 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 26 Aug 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable

Land and ownership7

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,467 sq m
Named landowners7
LandownerVillageDistrict
Y V ANNAIAH--
J K ANANDH--
K MANJUNATHA--
K JAYARAM--
P NANJAMMA--
RATHNA S REDDY--
K MUNISANJEEVAPPA--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 17.50 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHARSHA VARDHAN PANNALA
EngineerPONNALA VISHNU VARDHAN

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/310/PR/231221/003590Aug 2023 → Aug 2024

Reason as filed by the promoterShortage of Labour

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed93

As listed on the registration, under the names the promoter filed them with; the newest 80 of 93 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/200908/003590 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Development detailsFile: Development details and specification.pdf26 Aug 2020
Project SpecificationFile: PROJECT SPECIFICATION.pdf13 Aug 2020
REMAINING FEES PAID CHALLANFile: REMAININGS FEES PAID.pdf5 Aug 2020
RERA BANK ACCOUNT STATEMENTFile: KVB BANK STATEMENT.pdf5 Aug 2020
FINANCIAL STATEMENT For the year 2018-19File: FINANCIAL STATEMENT FY 2018-19.pdf5 Aug 2020
ECFile: EC HG 1.4.04 TO 08.07.20.pdf5 Aug 2020
Joint affidavit cum declarationFile: JOINT AFFIDAVIT HG.pdf5 Aug 2020
Sanctioned floor PlansFile: PLANS ALL.pdf5 Aug 2020
NOC issued by Airport AuthorityFile: NOC AIRPORT AUTHORITY.pdf5 Aug 2020
NOC OF KSPCBFile: KSPCB.pdf5 Aug 2020
Sanctioned Typical floor Plans from Basement and other floorsFile: PLANS ALL.pdf5 Aug 2020
DEVELOPMENT DETAILSFile: DEVELOPMENT DETAILS.pdf5 Aug 2020
CertificateFile: INCORPORATION CERTIFICATE.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Form-Ex1 Architect Certificate For Status of Work As On Date.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Form-Ex5 Engineers Certificate for Status of Work as on date.pdf-
CA Certificate for Funds UtilizationFile: Form-Ex3 CA Certificate For Fund Utilization.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Form-Ex2 Architect Certificate For Pending Work As On Date.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Form-Ex6 Engineers Certifictae for Pending work as on date.pdf-
CA Certificate for Funds required for Project CompletionFile: Form-Ex4 CA Certificate For Fund Required.pdf-
AffidavitFile: Form B Affidavit.pdf-
Latest Encumbrance CertificateFile: ECC-06112023-4797640.pdf-
Details Of Sold/ Un-sold UnitsFile: SOLD UNSOLD.xlsx-
Document 1File: ARCHITECT CERTIFICATE Q2.pdf-
Document 2File: ENGINEER CERTIFICATE Q2.pdf-
Document 3File: RERA Certificate - Q2 final.pdf-
Document 4File: AFFIDAVIT.pdf-
Document 8File: Himasai noc,s (1).pdf-
Document 9File: NOC AIRPORT AUTHORITY.pdf-
Document 10File: Himagiri Org Structure.pdf-
APPROVAL LETTER-
01-
PALN 1-
DRAFT-
DRAFT-
JD AGREEMENT_compressed-
02-
PALN 03-
DRAFT-
DRAFT-
DRAFT-
EC-
AFFIDAVIT-
AFFIDAVIT-
KHATHA-
JD AGREEMENT-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
FIRE& EMERGENCY-
Unnamed document-
BESCOM-
WATER SUPPLY-
KSPCB-
Unnamed document-
BSNL-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
PALN 1-
PLANTS ALL-
DRAFT-
Unnamed document-
Balance Sheet 2018 - 2019File: BS 18-19.pdf-
Balance Sheet 2017 - 2018File: BS 17-18.pdf-
Balance Sheet 2016 - 2017File: BS 16-17.pdf-
Audited Profit and Loss Statement 2018 - 2019File: PL 18-19.pdf-
Audited Profit and Loss Statement 2017 - 2018File: PL 17-18.pdf-
Audited Profit and Loss Statement 2016 - 2017File: PL FY 16-17.pdf-
Director's Report 2018 - 2019File: AUDIT REPOR.pdf-
Director's Report 2017 - 2018File: AUDIT REPOR.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep HIMA SAI HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmHIMA SAI HEIGHTSOther 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 20 registered projects within 2 km.

Builder: HIMAGIRI BUILDERS AND DEVELOPERS PRIVATE LIMITED

HIMAGIRI BUILDERS AND DEVELOPERS PRIVATE LIMITED has 1 registration on RERA Karnataka, including HIMA SAI HEIGHTS. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if HIMA SAI HEIGHTS is delayed beyond 28 Aug 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of HIMA SAI HEIGHTS?

The registered promoter entity is HIMAGIRI BUILDERS AND DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U70102TG2016PTC104099 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in HIMA SAI HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at HIMA SAI HEIGHTS?

The professionals named in the filing: Architect: HARSHA VARDHAN PANNALA; Engineer: PONNALA VISHNU VARDHAN. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HIMA SAI HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HIMA SAI HEIGHTS. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HIMA SAI HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.