Registration approved Residential/Group Housing project

HERE AND NOW

By Assetz Investments & Holdings LLP

RG-KA-60839 · RERA PRM/KA/RERA/1251/446/PR/171014/000797

Source: official RERA Karnataka filing

Red flags

  • 2 complaints at RERA Karnataka
  • Completion date moved by 15 months
  • 2 extensions taken

Clear

  • Separate project account declared
Feb 2022Possession promisedmoved 15 months from the original
2Complaints at RERA Karnatakaon this registration
Jump to the 63 documents Report an error

HERE AND NOW is a Residential/Group Housing project by Assetz Investments & Holdings LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/171014/000797 on 14 Oct 2017. Possession is promised by 28 Feb 2022. The completion date has moved by 15 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameHERE AND NOW
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/446/PR/171014/000797
  • ReraGenie IDRG-KA-60839

Builder

  • NameAssetz Investments & Holdings LLP
  • Entity typePartnership Firm
  • Authorized SignatoryAkshay Kumar Dewani

Key dates

this monthRegisteredOct 2017First promiseNov 2020Revised toFeb 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on14 Oct 2017
  • Promised completion28 Feb 2022
  • Revised completionRevised to 28 Feb 2022 (originally 30 Nov 2020)
  • Buildings2 building records
  • Documents filed63 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 1---1920192
Tower 2---1920192

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etcNot applicable
Plastering inside , outside & CeilingNot applicable
Joinery: Doors, Windows, Ventilators etcNot applicable
Basic work of Water supply, Sanitary and ElectrificationNot applicable
Dadoing, Skirting, Flooring, Tiles work (All types)Not applicable
Railing and Grill fixingNot applicable
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
PaintingNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,140 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 99.62 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAXIS INCORPORATED
EngineerM/s. Ramboll India Limited

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionNov 2020 → Aug 2021

No reason recorded in the filing

EX/PRM/KA/RERA/1251/446/PR/220711/000797Aug 2021 → Feb 2022

Reason as filed by the promoterForce Majeure

Complaints filed with RERA Karnataka2

Case no.ComplainantRespondentFiled
CMP/211203/0008672-Assetz Investments & Holdings LLP03/12/2021
00564/2025-Assetz Investments & Holdings LLP02/04/2025

Documents filed63

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/171014/000797 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Cert of incorp Here Now.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Annexure 3 Arhitect Certificate for work Completed.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Annexure 5 Engineering Certificate for Work Completed.pdf-
CA Certificate for Funds UtilizationFile: Annexure 2 CA Certificate for Fund Utilization.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Annexure 4 Arhitect Certificate for Work Pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Annexure 6 Engineering Certificate for Work Pending.pdf-
CA Certificate for Funds required for Project CompletionFile: Annexure 1 CA certificate for Fund Required.pdf-
AffidavitFile: Annexure 7 -Affidavit.pdf-
Latest Encumbrance CertificateFile: Annexure 11 Latest EC.pdf-
Relevant Document/sFile: Annexure 14 Delay Compensation.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Building License -17 02 17-
Sanction plan-
LAYOUT NA-
Sale Deed Here and Now-
Here & Now - Agreement draft 29 07 17-
Legal Opinion-
Floor_Plans-
Alloment letter draft-
Brochure-
Approvals-
Specs Here and Now-
EC 13 04 2107 to 07 06 2017-
khata and tax paid receipt Rachenahalli-
76Conversion9315-
1 Fire NOC 13 1 2017-
2 AAI 8 10 15-
3 Bescom 28 8 15-
4 BWSSB 21 9 15-
6 KSPCB (CFE)-
5 MOEF 28 12 2016-
7 BSNL 19 9 15-
Balance Sheet 2015 - 2016File: 1 Statement of Asset & Liabilities 2015-16.pdf-
Balance Sheet 2014 - 2015File: 1 Statement of Asset & Liabilities 2014-15.pdf-
Balance Sheet 2013 - 2014File: AI&H - 13-14-min.pdf-
Audited Profit and Loss Statement 2015 - 2016File: 2 Statement of Income & Expenditure 2015-16.pdf-
Audited Profit and Loss Statement 2014 - 2015File: 2 Statement of Income & Expenditure 2014-15.pdf-
Audited Profit and Loss Statement 2013 - 2014File: AI&H - 13-14-min.pdf-
Director's Report 2015 - 2016File: NA DIRECTOR REPORT.pdf-
Director's Report 2014 - 2015File: NA DIRECTOR REPORT.pdf-
Director's Report 2013 - 2014File: NA DIRECTOR REPORT.pdf-
Cash Flow Statement 2015 - 2016File: 4 Cash Flow 2015-16.pdf-
Cash Flow Statement 2014 - 2015File: 4 Cash Flow 2014-15.pdf-
Auditor's Report 2015 - 2016File: 5 Auditor's Report 2015-16.pdf-
Auditor's Report 2014 - 2015File: 5 Auditor's Report 2014-15.pdf-
Auditor's Report 2013 - 2014File: Audit Report 2013.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: 6 ITR_AY 2016-17.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: 6 ITR_AY 2015-16.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: 6 ITR_AY 2014-15.pdf-
Form B Final-
Prospectus/BrochureFile: Here & Now.pdf-
Advertisement Copy 1File: 1. 63 east, Marq & H&N.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_446_PR_171014_000797.xlsx-
Loan raised documentFile: Assetz Buildwell LLP-Closure letter.pdf-
Change in inventory/specification detailsFile: Revised Inventory.pdf-
Stability CertificateFile: Structure Stability certificate.pdf-
NOC issued by the Fire Force department after completion of workFile: FIRE.pdf-
Occupancy CertificateFile: OCCUPANCY CERTIFICATE.pdf-
Consent for operation issued by KSPCBFile: KSPCB.pdf-
Architect certificate for having completed the work(in format no 5)File: Acrtitect Certificate.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: CA Certificate.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Affidavit.pdf-
Engineer certificateFile: Engineer Certificate.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 15 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep HERE AND NOW on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Assetz Investments & Holdings LLP

Assetz Investments & Holdings LLP has 1 registration on RERA Karnataka, including HERE AND NOW. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if HERE AND NOW is delayed beyond 28 Feb 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of HERE AND NOW?

The registered promoter entity is Assetz Investments & Holdings LLP, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in HERE AND NOW?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against HERE AND NOW?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at HERE AND NOW?

The professionals named in the filing: Architect: PRAXIS INCORPORATED; Engineer: M/s. Ramboll India Limited. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HERE AND NOW?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HERE AND NOW. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HERE AND NOW to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.