Home / Browse projects / Bengaluru Urban, Karnataka / Helio at Brigade El Dorado

Registration approved Residential/Group Housing project

Helio at Brigade El Dorado

By Brigade Tetrarch Private Limited

RG-KA-06271 · RERA PRM/KA/RERA/1251/472/PR/190913/002889

Source: official RERA Karnataka filing

Red flags

  • 2 complaints at RERA Karnataka
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • Separate project account declared
Sep 2024Possession promisedmoved 9 months from the original
2Complaints at RERA Karnatakaon this registration
Jump to the 97 documents Report an error

Helio at Brigade El Dorado is a Residential/Group Housing project by Brigade Tetrarch Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/472/PR/190913/002889 on 13 Sep 2019. Possession is promised by 30 Sep 2024. The completion date has moved by 9 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameHelio at Brigade El Dorado
  • TypeResidential/Group Housing
  • Location
    • Yelahanka
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/472/PR/190913/002889
  • ReraGenie IDRG-KA-06271

Builder

  • NameBrigade Tetrarch Private Limited
  • Entity typeCompany
  • CINU92412KA1995PTC018247
  • Authorized SignatoryViswa Prathap Desu
  • Other registrations9 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredSep 2019First promiseDec 2023Revised toSep 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on13 Sep 2019
  • Promised completion30 Sep 2024
  • Revised completionRevised to 30 Sep 2024 (originally 31 Dec 2023)
  • Buildings1 building record
  • Documents filed97 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Helio at Brigade El Dorado---5240524

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etcNot applicable
Plastering inside , outside & CeilingNot applicable
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionYes-
StaircasesYes-
LiftsNoNot applicable
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area17,942 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 195.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAbhay Itty Zachariah
EngineerN.N.Nagendra Kumar

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2023 → not stated

No reason recorded in the filing

Complaints filed with RERA Karnataka2

Case no.ComplainantRespondentFiled
CMP/210205/0007582-Brigade Tetrarch Private Limited05/02/2021
CMP/220218/0009030-Brigade Tetrarch Private Limited18/02/2022

Documents filed97

As listed on the registration, under the names the promoter filed them with; the newest 80 of 97 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/472/PR/190913/002889 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: 2 Certificate of Incorporation BTPL pdf_compressed.pdf-
Already registered project ongoing detailsFile: List of Ongoing Registered Projects.xlsx-
Modified plan details site plan, floor plans, Plan Licence LetterFile: Brigade El Dorado - Revision Certificate.pdf-
Elevation, Sections, Specifications ( If changes are there )File: Helio - Elevation & Section.pdf-
List Of AllotteesFile: List of Allottess - Helio.pdf-
Consent LetterFile: BG-EHE-H-X-0017-XX-CN.pdf-
Chartered Accountant CertificateFile: Hello at Brigade El Dorado - Form 4.pdf-
Notarized AffidavitFile: Helio - Affidavit.pdf-
Engineer CertificateFile: Form -6 - Helio.pdf-
Architect CertificateFile: Helio - Form 5.PDF-
Structural Engineer Certificate for stability of structureFile: Helio - Structural Certificate.pdf-
Modification of Plan DetailsFile: Site plan.pdf-
Modification of Plan DetailsFile: Brigade El Dorado - Revised Site Plan.pdf-
Modification of Plan DetailsFile: Commencement Certificat.pdf-
Modification of Plan DetailsFile: Commencement Certificat.pdf-
Modification of Plan DetailsFile: Sold & Unsold - Details - Old.pdf-
Modification of Plan DetailsFile: Sold & Unsold - Details - New1.pdf-
Document 1File: AAI NOC.pdf-
Site PlanFile: Brigade El Dorado - Revised Site Plan.pdf-
Area StatementFile: Area Statement.pdf-
Basement Floor PlanFile: Tower H Basement Floor Plan.pdf-
Ground Floor PlanFile: Tower H Ground Floor Plan.pdf-
1st Floor PlanFile: Tower H First Floor Plan.pdf-
2nd Floor PlanFile: Tower H Second Floor Plan.pdf-
3rd & 4th Floor PlanFile: Tower H Third and Fourth Floor Plan.pdf-
5th Floor PlanFile: Tower H Fifth Floor Plan.pdf-
6th to 11th Floor PlanFile: Tower H 6th to 11th Typical Floor Plan.pdf-
12th & 13th Floor PlanFile: Tower H 12th & 13th Typical Floor Plan.pdf-
14th to 19th & 21st Floor PlanFile: Tower H 14th to 19th Typical and 21st Floor Plan.pdf-
20th Floor PlanFile: Tower H 20th Floor Plan (Refuge area Plan).pdf-
ElevationFile: Tower H Elevation.pdf-
SectionFile: Tower H Section.pdf-
Terrace Floor PlanFile: Tower H Terrace Floor Plan.pdf-
Consent Letter - Part 1File: Consent Letters - Part 1.pdf-
Consent Letter - Part 2File: Consent Letters - Part 2.pdf-
Reason for Modification of PlanFile: Helio - Reason for Modifications.pdf-
Brigade Eldorado - Plan Sanction - Phase 1-
Site plan-
Agreement to Sell- Helio-
Combined Possession Certificate - R5 & R8-
Section and Elevation-
Site plan-
Helio @ Brigade El Dorado Allotment Letter Proforma-
Helio At El-Dorado Rera Brochure_29Aug19-
Specifications-
Encumbrance Certificate-
Affidavit for Section 3 - Helio-
Combined Possession Certificate - R5 & R8-
Original Lease cum Sale Agreement-
Floor Plans-
El Dorado - Fire NOC-
AAI Clearance for R8-
Brigade Eldorado - BESCOM NOC-
El Dorado - CFE (1)-
SEIAA - ELDORADO-
Section and Elevation-
Site plan-
Section, Elevation and Specifications-
Change of Plots from KIADB-
Title Opinion-
Balance Sheet 2017 - 2018File: Balance Sheet 2017-18.pdf-
Balance Sheet 2016 - 2017File: Balance Sheet 2016-17.pdf-
Balance Sheet 2015 - 2016File: Balance Sheet 2015-16.pdf-
Audited Profit and Loss Statement 2017 - 2018File: Auditors Report 2017-18.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Auditors Report 2016-17.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Auditors Report 2015-16.pdf-
Director's Report 2017 - 2018File: Directors Report 2017-18.pdf-
Director's Report 2016 - 2017File: Directors Report 2016-17.pdf-
Director's Report 2015 - 2016File: Directors Report 2015-16.pdf-
Cash Flow Statement 2017 - 2018File: Cash Flow 2017-18.pdf-
Cash Flow Statement 2016 - 2017File: Cash Flow 2016-17.pdf-
Auditor's Report 2017 - 2018File: Auditors Report 2017-18.pdf-
Auditor's Report 2016 - 2017File: Auditors Report 2016-17.pdf-
Auditor's Report 2015 - 2016File: Auditors Report 2015-16.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: ITR 17-18.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR 16-17.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR 15-16.pdf-
Form B Helio-
Prospectus/BrochureFile: Helio At El-Dorado Rera Brochure_29Aug19.pdf-
Advertisement Copy 1File: Brigade El Dorado - Half Page Ad.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Helio at Brigade El Dorado on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmHelio at Brigade El DoraOther 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 23 registered projects within 2 km.

Builder: Brigade Tetrarch Private Limited

Brigade Tetrarch Private Limited has 10 registrations on RERA Karnataka, including Jasper and Iridium at Brigade El Dorado and Aurum at Brigade El Dorado. Its filings declare 4 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Helio at Brigade El Dorado is delayed beyond 30 Sep 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Helio at Brigade El Dorado?

The registered promoter entity is Brigade Tetrarch Private Limited, a company as per the filing. Its CIN U92412KA1995PTC018247 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Helio at Brigade El Dorado?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Helio at Brigade El Dorado?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Helio at Brigade El Dorado?

The professionals named in the filing: Architect: Abhay Itty Zachariah; Engineer: N.N.Nagendra Kumar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Helio at Brigade El Dorado?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Helio at Brigade El Dorado. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Helio at Brigade El Dorado to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.