Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Heavie Halcyon is a Residential/Group Housing project by Sentient Devcon LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/131224/007286 on 13 Dec 2024. Possession is promised by 31 Aug 2027. 2 of the 42 units on this registration are recorded sold or booked, and 2 of 14 construction stages are filed complete.
At a glance
Project
- NameHeavie Halcyon
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- 560102
- Pincode560102
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/131224/007286
- ReraGenie IDRG-KA-85135
Builder
- NameSentient Devcon LLP
- Entity typePartnership Firm
- GSTIN29AETFS0162A1Z0
- Authorized SignatoryKin Shreeraj Reddy
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on13 Dec 2024
- Promised completion31 Aug 2027
- Revised completionNone
- Buildings1 building record
- Documents filed100 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Block A | - | - | - | 42 | 0 | 42 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 14 construction stages are filed complete. The stage furthest along is Upto Plinth Level, at 35%.
Building: 27% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 35% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 35% |
| Retaining wall (All types) | 25% |
| RCC or MS Framed structure | 30% |
| Masonry Construction | 30% |
| Plastering inside , outside & Ceiling | 25% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 35% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 45% |
| Lifts | Yes | 45% |
| Corridor/Lobbies | Yes | 45% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership12
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| A M Ramesh Reddy | - | - |
| Somashekhar & Others | - | - |
| Srinivas G | - | - |
| Sujatha G | - | - |
| Arun Kumar A N | - | - |
| Ramachandra & Others | - | - |
| Jayamma & Archana | - | - |
| Saraswathamma | - | - |
| Kamakshi | - | - |
| Manjula R | - | - |
| Venkataramanappa & Others | - | - |
| Sentient Devcon LLP | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 42.50 cr | Rs 9.88 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 3.60 cr | - |
| On-site expenditure-Consultants Fees | Rs 1.88 cr | Rs 1.09 cr |
| On-site expenditure-Salaries of workers | Rs 1.79 cr | Rs 1.03 cr |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 21.00 lakh | Rs 12.13 lakh |
| On-site expenditure-Site Overhead | Rs 18.00 lakh | Rs 10.40 lakh |
| Payment of taxes | - | Rs 2.50 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Arjun Nambisan |
| Engineer | Suryakanth Pavare |
| Chartered Accountant | B Adisekhara Reddy |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed100
As listed on the registration, under the names the promoter filed them with; the newest 80 of 100 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/131224/007286 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM-4 Q2 FY 26-27 - Signed.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: HEAVIE HALCYON - Form -6 - FY 26-27 - Q2 - Signed.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 5 2026-27 - Q2 - Signed.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM-4 RERA CERTIFICATE SENTIN.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Architects Certificate -Form 5.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Engineer's Certificate - Signed.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 - Q4 - Signed.pdf | 20 May 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 - Q4 - Signed.pdf | 20 May 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 - Q4 - Signed.pdf | 20 May 2026 |
| Q4 2025-26 Water supply and sewage board | 20 May 2026 |
| Q4 2025-26 KPTCL- BESCOM | 20 May 2026 |
| Q4 2025-26 Fire and Safety | 20 May 2026 |
| Q4 2025-26 Airport Authority of India | 20 May 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 - Q3 - Signed.pdf | 13 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 - Q3 - Signed.pdf | 13 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 - Q3 - Signed.pdf | 13 Feb 2026 |
| Q3 2025-26 Water supply and sewage board | 13 Feb 2026 |
| Q3 2025-26 KPTCL- BESCOM | 13 Feb 2026 |
| Q3 2025-26 Fire and Safety | 13 Feb 2026 |
| Q3 2025-26 Airport Authority of India | 13 Feb 2026 |
| HAL NOCFile: HAL NOC.pdf | 29 Nov 2024 |
| BIAL NOCFile: BIAL_NOC.pdf | 29 Nov 2024 |
| Proforma of Allotment LetterFile: ALLOTMENT LETTER.pdf | 29 Nov 2024 |
| Proforma Agreement for SaleFile: Profrma AFS.pdf | 29 Nov 2024 |
| Brief Estimation CostFile: Cost of Construction Certified by Engineer.pdf | 29 Nov 2024 |
| ADLR Survey SketchFile: Survey Sketch.pdf | 29 Nov 2024 |
| ADLR LetterFile: ADLR Letter.pdf | 29 Nov 2024 |
| BBMP KhathaFile: BBMP Khatha.pdf | 29 Nov 2024 |
| sources of funds to complete the projectFile: DetailedStatement (16).pdf | 30 Oct 2024 |
| Bank affidavitFile: BANK AFFIDAVIT.pdf | 30 Oct 2024 |
| profit and loss account, balance sheet, and ITR for 2022-23File: UDIN 1.pdf | 30 Oct 2024 |
| Title DeedFile: TITLE DEED.pdf | 30 Oct 2024 |
| notarized affidavit regarding all pending or cleared litigations /non-litigation by clearly mentionFile: Notarised affidavit.pdf | 30 Oct 2024 |
| advocate search reportFile: Ec New Hsr Project Rera.pdf | 30 Oct 2024 |
| Phase wise Development phase demarcation drawingsFile: SANCTION DRAWINGS _page-0001.jpg | 30 Oct 2024 |
| all original sanctioned drawings, floor plan, sectional drawings and elevationsFile: SANCTION DRAWINGS .pdf | 30 Oct 2024 |
| Area calculation sheet certified by the EngineerFile: Project area details.pdf | 30 Oct 2024 |
| notarized JD cum AffidavitFile: JDA cum AFFIDAVIT.pdf | 30 Oct 2024 |
| Amenities and Common area details certified by the EngineerFile: Calculations of amenities & common areas.pdf | 30 Oct 2024 |
| structural safety adopted for the proposed buildingFile: Structural safety.pdf | 30 Oct 2024 |
| STP design drawingFile: STP LOCATION.pdf | 30 Oct 2024 |
| project specification certified by the Engineer.File: Project Specification.pdf | 30 Oct 2024 |
| section 3(1) notarized affidavitFile: Section 3.pdf | 30 Oct 2024 |
| Master plan Extract ear markFile: Location Map.pdf | 30 Oct 2024 |
| self attested copy of the Engineer license certificateFile: COP Certificate_Self attested.pdf | 30 Oct 2024 |
| NOC issued by BESCOM and BWSSBFile: BWSSB & BESCOM R1.pdf | 30 Oct 2024 |
| guidance valueFile: Guidance value.pdf | 30 Oct 2024 |
| Agreement for Sale and proforma of the Allotment letterFile: Agreement of sale Proforma RERA.pdf | 30 Oct 2024 |
| Partners financial statements - Kin Shreeraj ReddyFile: NOA FY 2022-23.pdf | 10 Oct 2024 |
| Partners financial statements - Pramod ReddyFile: FINANCIALS FY 22-23 PRAMOD SIGNED-2.pdf | 10 Oct 2024 |
| Partners financial statements - ChamundeswariFile: Chamundeswari 2023-24.pdf | 10 Oct 2024 |
| Partners financial statements - MallikaFile: FINANCILAS SMT MALLIKA FY 2022-23.pdf | 10 Oct 2024 |
| Partners financial statements - Ramesh ReddyFile: Balance sheet.pdf | 10 Oct 2024 |
| Partner's KYC with self-attestedFile: self-attested - Partners.pdf | 10 Oct 2024 |
| EC from 13/3/2024 to till dateFile: Ec New Hsr Project Rera.pdf | 10 Oct 2024 |
| Building License from Local Authority Original CopyFile: Building Licence.pdf | 10 Oct 2024 |
| Original sanctioned drawings, floor plan, sectional drawings and elevations.File: SANCTION DRAWINGS .pdf | 10 Oct 2024 |
| NOC issued by the concerned Airport and HALFile: R1_HAL NOC.pdf | 10 Oct 2024 |
| Registration CertificateFile: COI.pdf | - |
| Partnership DeedFile: amended LLP Agreement mca upload.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: FORM-1 COMPRESSED.pdf | - |
| Certificate issued by Architect Form 2File: COA - Arjun.pdf | - |
| Certificate issued by Engineer Form 3File: Engineer Certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Non Litigation Notarised affidavit.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Heavie Halcyon on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 12 registered projects within 2 km.
SOULSPRING PHASE 1
SHANKESHWAR LANDMARK LLP
MANIKCHAND SVAMITVA SOULSPRING PHASE 2
SHANKESHWAR LANDMARK LLP
LIVIUM
M/s Rayala Infra Projects LLP
VYAS SIGNATURE
VYAS BUILDERS AND DEVELOPERS
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
See every Bengaluru Urban project, with the district possession charts
Builder: Sentient Devcon LLP
Sentient Devcon LLP has 1 registration on RERA Karnataka, including Heavie Halcyon. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Heavie Halcyon is delayed beyond 31 Aug 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Heavie Halcyon?
The registered promoter entity is Sentient Devcon LLP, a partnership firm as per the filing. Its GSTIN 29AETFS0162A1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Heavie Halcyon?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Heavie Halcyon?
The professionals named in the filing: Architect: Arjun Nambisan; Engineer: Suryakanth Pavare; Chartered Accountant: B Adisekhara Reddy. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Heavie Halcyon?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback