Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Haven of Bliss is a Residential/Group Housing project by ANEMONES HOSPITALITY AND HOTELS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/040326/008502 on 4 Mar 2026. Possession is promised by 31 Dec 2026. 19 of the 480 units on this registration are recorded sold or booked, and 17 of 17 construction stages are filed complete.
At a glance
Project
- NameHaven of Bliss
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/310/PR/040326/008502
- ReraGenie IDRG-KA-40880
Builder
- NameANEMONES HOSPITALITY AND HOTELS PRIVATE LIMITED
- Entity typeCompany
- CINU45400KA2015PTC079526
- GSTIN29AANCA3476C1ZJ
- Authorized SignatorySushil Chandravadan Choksey
- DirectorsChidananda Y P, Chidananda Y P, Sushil Chandravadan Choksey, Dharminder Singh Chahal
- Project HeadShivaprasad H
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on4 Mar 2026
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed246 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Haven Of Bliss | - | - | - | 480 | 0 | 480 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
17 of 17 construction stages are filed complete.
Building: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 100% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 100% |
| Painting | 100% |
| Fire prevention and fire fighting fitting and fixture with network | 100% |
| Weather Proof work(tile,concrete) | 100% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 100% |
| Internal and External work including landscapes as per sanctioned drawings | 100% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Sewage and Drainage System | Yes | 100% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 100% |
| Energy management | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Solid waste management and disposal | Yes | 100% |
| Emergency Evacuation services | Yes | 100% |
| Internal Roads & Footpaths | Yes | 100% |
| Electricity supply transformer and substation | Yes | 100% |
| Storm water drains | Yes | 100% |
| Use of renewable energy | Yes | 100% |
| Sewage Treatment Plant (STP) | Yes | 100% |
| Parks & Tree planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Electricity | Yes | 100% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | 100% |
| Community Hall | Yes | 100% |
| Outdoor Sports facility | Yes | 100% |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | 100% |
| Gym | Yes | 100% |
| Parks | Yes | 100% |
| Power Backup | Yes | 100% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 100% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | Yes | 100% |
| Corridor/Lobbies | Yes | 100% |
| Fire escapes | Yes | 100% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 100% |
| Basement | Yes | 100% |
| Terrace | Yes | 100% |
| Outer Wall | Yes | 100% |
| Open parking areas | Yes | 100% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 100% |
| Common storage spaces | No | Not applicable |
Land and ownership14
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| VBHC Mumbai Value Homes Private Limited | - | - |
| VBHC Mumbai Value Homes Private Limited | - | - |
| VBHC Mumbai Value Homes Private Limited | - | - |
| VBHC Mumbai Value Homes Private Limited | - | - |
| VBHC Mumbai Value Homes Private Limited | - | - |
| VBHC Mumbai Value Homes Private Limited | - | - |
| VBHC Mumbai Value Homes Private Limited | - | - |
| VBHC Mumbai Value Homes Private Limited | - | - |
| VBHC Mumbai Value Homes Private limited | - | - |
| VBHC Mumbai Value Homes Pvt Ltd | - | - |
| VBHC Mumbai Value Homes Private Limited | - | - |
| VBHC Mumbai Value Homes Private Limited | - | - |
| VBHC Mumbai Value Homes Private Limited | - | - |
| VBHC Mumbai Value Homes Private Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 66.19 cr | - |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 16.74 cr | - |
| Payment of taxes | Rs 12.98 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | TNS Chakravarthi |
| Engineer | Dakka Gurappa |
| Chartered Accountant | Rahul Jain |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed246
As listed on the registration, under the names the promoter filed them with; the newest 80 of 246 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/040326/008502 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4- Q2-26-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: ARCHITECT CERTIFICATE.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form - 6.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: CA Certificate Form 4 Q1 2026-27.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Sale Deed 3444 - SyNo 28-1 4A 29GFile: Sale Deed 3444 - SyNo 28-1 4A 29G.pdf | 28 Feb 2026 |
| Revised Agreement for SaleFile: Revised Agreement for Sale.pdf | 28 Feb 2026 |
| Declarartion for SEIAA NOCFile: Declarartion for SEIAA NOC.pdf | 28 Feb 2026 |
| Allotment LetterFile: Allotment Letter.pdf | 28 Feb 2026 |
| Query Answer Document 28-02-2026File: Query Answer Document 28-02-2026.pdf | 28 Feb 2026 |
| Haven of Bliss Sale Deed Sy no25File: 1 Haven of Bliss Sale Deed Sy no25.pdf | 21 Feb 2026 |
| Haven of Bliss Sale Deed Sy no 28 1File: 1 Haven of Bliss Sale Deed Sy no 28 1.pdf | 21 Feb 2026 |
| Affidavit for Renewed PlanFile: 2 Affidavit for Renewed Plan.pdf | 21 Feb 2026 |
| Area Bifurcation of all the blocksFile: 3 Area Bifurcation of all the blocks.pdf | 21 Feb 2026 |
| Declaration for Car parking facilityFile: 4 Declaration for Car parking facility.pdf | 21 Feb 2026 |
| Declaration for Non provision of CCTV facilityFile: 5 Declaration for Non provision of CCTV facility.pdf | 21 Feb 2026 |
| Clarification for other towers registrationFile: 6 Clarification for other towers registration.pdf | 21 Feb 2026 |
| Engineer licenceFile: 7 Engineer licence.pdf | 21 Feb 2026 |
| Stability Certificate with Engineer LicenceFile: 8 Stability Certificate with Engineer Licence.pdf | 21 Feb 2026 |
| Agreement for SaleFile: 9 Agreement for Sale.pdf | 21 Feb 2026 |
| Affidavit for BESCOM NOCFile: 10 Affidavit for BESCOM NOC.pdf | 21 Feb 2026 |
| Fire NOC CCFile: 10 Fire NOC CC.pdf | 21 Feb 2026 |
| Gram Panchayat Water NocFile: 10 Gram Panchayat Water Noc.pdf | 21 Feb 2026 |
| SEIAA NOCFile: 11 SEIAA NOC.pdf | 21 Feb 2026 |
| STP drawingFile: 12 STP drawing.pdf | 21 Feb 2026 |
| DP work orderFile: DP work order.pdf | 21 Feb 2026 |
| Query Answers 21-02-2026File: Query Answers 21-02-2026.pdf | 21 Feb 2026 |
| RTC, survey 25 | - |
| Mutation, survey 25 | - |
| Encumbrance Certificate, survey 25 | - |
| Conversion/Alienation Order, survey 25 | - |
| JDA, survey 25 | - |
| Khatha, survey 25 | - |
| RTC, survey 28/1 | - |
| Mutation, survey 28/1 | - |
| Encumbrance Certificate, survey 28/1 | - |
| Conversion/Alienation Order, survey 28/1 | - |
| JDA, survey 28/1 | - |
| Khatha, survey 28/1 | - |
| RTC, survey 28/2 | - |
| Mutation, survey 28/2 | - |
| Encumbrance Certificate, survey 28/2 | - |
| Conversion/Alienation Order, survey 28/2 | - |
| JDA, survey 28/2 | - |
| Khatha, survey 28/2 | - |
| RTC, survey 29/4 | - |
| Mutation, survey 29/4 | - |
| Encumbrance Certificate, survey 29/4 | - |
| Conversion/Alienation Order, survey 29/4 | - |
| JDA, survey 29/4 | - |
| Khatha, survey 29/4 | - |
| RTC, survey 29/9 | - |
| Mutation, survey 29/9 | - |
| Encumbrance Certificate, survey 29/9 | - |
| Conversion/Alienation Order, survey 29/9 | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Haven of Bliss on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: ANEMONES HOSPITALITY AND HOTELS PRIVATE LIMITED
ANEMONES HOSPITALITY AND HOTELS PRIVATE LIMITED has 1 registration on RERA Karnataka, including Haven of Bliss. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Haven of Bliss is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Haven of Bliss?
The registered promoter entity is ANEMONES HOSPITALITY AND HOTELS PRIVATE LIMITED, a company as per the filing. Its CIN U45400KA2015PTC079526 and GSTIN 29AANCA3476C1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Haven of Bliss?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Haven of Bliss?
The professionals named in the filing: Architect: TNS Chakravarthi; Engineer: Dakka Gurappa; Chartered Accountant: Rahul Jain. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Haven of Bliss?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback