Home / Browse projects / Nanded, Maharashtra / GVC SHAGUN CITY PHASE III
GVC SHAGUN CITY PHASE III
RG-MH-98115 · RERA P51100026123 · Last updated on MahaRERA portal: 22 Apr 2023
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nanded registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GVC SHAGUN CITY PHASE III is a Residential / Group Housing project by SHAGUN ASSOCIATES in Nanded, Maharashtra, registered with MahaRERA as P51100026123 on 20 Aug 2020. The registration is recorded completed; possession was promised by 30 Jun 2024.
At a glance
Project
- NameGVC SHAGUN CITY PHASE III
- TypeResidential / Group Housing
- Location
- OFF ROAD NO 10 BEHIND RAMBAGH RESIDENCY
- KAUTHA
- Nanded Waghala (M Corp.)
- Nanded
- 431603
- Pincode431603
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51100026123
- ReraGenie IDRG-MH-98115
Builder
- NameSHAGUN ASSOCIATES
- Entity typePartnership
- PartnersPRADEEP GAJANAN CHADAWAR, GANGAPRASAD RAMESHWAR TOSHNIWAL, RAMESH VISHWAMBHAR PARSEWAR
- Other registrations2 more →
- Completed3 of 3
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on20 Aug 2020
- Promised completion30 Jun 2024
- Revised completionNone
- Buildings14 building records
- Documents filed53 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PLOT NO 26 | NA | 2 | 0 | 0 | 0 | 0 |
| PLOT NO 25 | NA | 2 | 0 | 0 | 0 | 0 |
| PLOT NO 24 | NA | 2 | 0 | 0 | 0 | 0 |
| PLOT NO 23 | NA | 2 | 0 | 0 | 0 | 0 |
| EAST FACING CORNER 18 | NA | 2 | 0 | 0 | 0 | 0 |
| EAST FACING NON CORNER | NA | 2 | 0 | 0 | 0 | 0 |
| EAST FACING CORNER 12 | NA | 2 | 0 | 0 | 0 | 0 |
| WEST FACING CORNER 11 | NA | 2 | 0 | 0 | 0 | 0 |
| WEST FACING NON CORNER | NA | 2 | 0 | 0 | 0 | 0 |
| WEST FACING CORNER 5 AND 19 | NA | 2 | 0 | 0 | 0 | 0 |
| PLOT NO 4 | NA | 2 | 0 | 0 | 0 | 0 |
| PLOT NO 3 | NA | 2 | 0 | 0 | 0 | 0 |
| PLOT NO 2 | NA | 2 | 0 | 0 | 0 | 0 |
| PLOT NO 1 | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building14
As on 22 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
126 of 154 construction stages are filed complete across 14 buildings. The stage furthest along is Podiums (if any), at 0%.
PLOT NO 2682%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
PLOT NO 2582%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
PLOT NO 2482%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
PLOT NO 2382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
EAST FACING CORNER 1882%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
EAST FACING NON CORNER82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
EAST FACING CORNER 1282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WEST FACING CORNER 1182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WEST FACING NON CORNER82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WEST FACING CORNER 5 AND 1982%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
PLOT NO 482%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
PLOT NO 382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
PLOT NO 282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
PLOT NO 182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 22 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed14
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| PLOT NO 26 | 1 | 1 |
| PLOT NO 25 | 1 | 1 |
| PLOT NO 24 | 1 | 1 |
| PLOT NO 23 | 1 | 1 |
| EAST FACING CORNER 18 | 1 | 1 |
| EAST FACING NON CORNER | 1 | 1 |
| EAST FACING CORNER 12 | 1 | 1 |
| WEST FACING CORNER 11 | 1 | 1 |
| WEST FACING NON CORNER | 1 | 1 |
| WEST FACING CORNER 5 AND 19 | 1 | 1 |
| PLOT NO 4 | 1 | 1 |
| PLOT NO 3 | 1 | 1 |
| PLOT NO 2 | 1 | 1 |
| PLOT NO 1 | 1 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SOURABH SHIRISH KARANDIKAR |
| Engineer | SANDESH CHAVGONDA PATIL |
| Chartered Accountant | CA MAYUR AGRAWAL |
| Partner | Role in project |
|---|---|
| SHAGUN ASSOCIATES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Aug 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Aug 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Aug 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Aug 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 26 Jan 2023
Documents filed53
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SHAGUN 3 2020-21.pdf | 22 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SHAGUN 3 2021-22.pdf | 22 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31032021.pdf | 21 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31032022.pdf | 21 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31122021.pdf | 21 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SHAGUN P3 FORM 5 2020-21.pdf | 21 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SHAGUN P3 FORM 5 2021-22.pdf | 21 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHAGUN 3 2020-21.pdf | 19 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHAGUN 3 2021-22.pdf | 19 Apr 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: SHAGUN P3 2.pdf | 27 Jan 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC GUT NO 228 SHAGUN CITY 42R.pdf | 26 Jan 2023 |
| Building plan approvalFile: 42R NA ORDER.pdf | 16 Aug 2020 |
| Building plan approvalFile: HPSC0116_compressed.pdf | 16 Aug 2020 |
| Building plan approvalFile: HPSC0117_compressed.pdf | 16 Aug 2020 |
| Building plan approvalFile: HPSC0118_compressed.pdf | 16 Aug 2020 |
| Building plan approvalFile: HPSC0119_compressed.pdf | 16 Aug 2020 |
| Building plan approvalFile: HPSC0120_compressed.pdf | 16 Aug 2020 |
| Building plan approvalFile: HPSC0121_compressed.pdf | 16 Aug 2020 |
| Building plan approvalFile: HPSC0122_compressed.pdf | 16 Aug 2020 |
| Building plan approvalFile: HPSC0123_compressed.pdf | 16 Aug 2020 |
| Building plan approvalFile: HPSC0124_compressed.pdf | 16 Aug 2020 |
| Building plan approvalFile: HPSC0125_compressed.pdf | 16 Aug 2020 |
| Building plan approvalFile: HPSC0126_compressed.pdf | 16 Aug 2020 |
| Building plan approvalFile: HPSC0127_compressed.pdf | 16 Aug 2020 |
| Building plan approvalFile: HPSC0128_compressed.pdf | 16 Aug 2020 |
| Building plan approvalFile: HPSC0129_compressed.pdf | 16 Aug 2020 |
| Building plan approvalFile: HPSC0130_compressed.pdf | 16 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: 42R NA ORDER.pdf | 16 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0116_compressed.pdf | 16 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0117_compressed.pdf | 16 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0118_compressed.pdf | 16 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0119_compressed.pdf | 16 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0120_compressed.pdf | 16 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0121_compressed.pdf | 16 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0122_compressed.pdf | 16 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0123_compressed.pdf | 16 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0124_compressed.pdf | 16 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0125_compressed.pdf | 16 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0126_compressed.pdf | 16 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0127_compressed.pdf | 16 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0128_compressed.pdf | 16 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0129_compressed.pdf | 16 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0130_compressed.pdf | 16 Aug 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: 42 R BUILDING PERMISSION COVER LETTER.pdf | 16 Aug 2020 |
| Layout approvalFile: COVER PAGE_compressed.pdf | 13 Aug 2020 |
| Layout approvalFile: LAYOUT PLAN_compressed.pdf | 13 Aug 2020 |
| Copy of the legal title reportFile: SEARCH REPORT 42R_compressed.pdf | 13 Aug 2020 |
| Details of encumbrancesFile: 42R DECLARATION CUM AFFIDAVIT.pdf | 13 Aug 2020 |
| Copy of Layout Approval (in case of layout)File: COVER PAGE_compressed.pdf | 13 Aug 2020 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN_compressed.pdf | 13 Aug 2020 |
| Declaration in FORM BFile: 42R DECLARATION CUM AFFIDAVIT.pdf | 13 Aug 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 RERA CA CERTIFICATE 42R.pdf | 13 Aug 2020 |
| Proforma of Allotment letterFile: RERA MODEL DRAFT RESI Phase-III-converted.pdf | 13 Aug 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nanded
Computed across the 100+ Nanded projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 53 filed documents as one ZIP, foldered, with a manifest
Keep GVC SHAGUN CITY PHASE III on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KAUTHA100+ in Nanded
Filed coordinates, straight-line distance. 17 registered projects within 2 km.
Vishwakarma Layout
VISHWAKARMA HOUSING PVT. LTD
SHRI SWAMI SAMARTH HEIGHTS
SHRI SWAMI SAMARTH ESTATES
GVC GANGADHAM PHASE I
GVC DEVELOPERS
GVC GANGADHAM SKYILA
GVC DEVELOPERS
A R KHIYANI CITY
M B BUILDERS AND DEVELOPERS
PADMANABHA RESIDENCY
SHREE SAMARTH BUILDERS AND DEVELOPERS
See every Nanded project, with the district possession charts
Builder: SHAGUN ASSOCIATES
SHAGUN ASSOCIATES has 3 registrations on MahaRERA, including GVC SHAGUN CITY PHASE 1 and GVC SHAGUN CITY PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nanded district page.
Frequently asked questions
What are my rights if GVC SHAGUN CITY PHASE III is delayed beyond 30 Jun 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GVC SHAGUN CITY PHASE III?
The registered promoter entity is SHAGUN ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GVC SHAGUN CITY PHASE III?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GVC SHAGUN CITY PHASE III?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GVC SHAGUN CITY PHASE III?
The professionals named in the filing: Architect: SOURABH SHIRISH KARANDIKAR; Engineer: SANDESH CHAVGONDA PATIL; Chartered Accountant: CA MAYUR AGRAWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GVC SHAGUN CITY PHASE III?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback