ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / GUNINA MELLOW

Registration approved Residential/Group Housing project

GUNINA MELLOW

By GUNINA STRUCTURES

RG-KA-96772 · RERA PRM/KA/RERA/1251/310/PR/181122/002142

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Nov 2020Possession promisedmoved 6 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 47 documents Report an error

GUNINA MELLOW is a Residential/Group Housing project by GUNINA STRUCTURES in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/181122/002142 on 22 Nov 2018. Possession is promised by 15 Nov 2020. The completion date has moved by 6 months from the original filing.

At a glance

Project

  • NameGUNINA MELLOW
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/181122/002142
  • ReraGenie IDRG-KA-96772

Builder

  • NameGUNINA STRUCTURES
  • Entity typePartnership Firm
  • Authorized SignatoryGOPI KRISHNA.G

Key dates

this monthRegisteredNov 2018First promiseMay 2020Revised toNov 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on22 Nov 2018
  • Promised completion15 Nov 2020
  • Revised completionRevised to 15 Nov 2020 (originally 15 May 2020)
  • Buildings1 building record
  • Documents filed47 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GUNINA MELLOW---48048

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,943 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 11.50 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCHITECTURE STUDIO
EngineerPARAMOUNT STRUCTURAL CONSULTANTS

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionMay 2020 → Nov 2020

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed47

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/181122/002142 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: partnership firm registration certificate.pdf-
Commencement Certificate_Declearation-
Building plan-
Existing Layout Plan-
Perfoma of Sale Deed-
Performa of Sale Agreement-
Sale Deed & RTC_Gunina Mallow-
infa plan--
Development plan-
Performa of Allotment letter-
Broucher_Gunina Mallow-
Project Specification_Gunina-
EC_Gunina Mellow-2005-2018-
Katha_Gunina-
Joint development-
Existing Layout Plan-
Existing Sanction Plan_All 3-
Change of Land Use_Declearation-
Balance Sheet 2016 - 2017File: BS 17-18.pdf-
Balance Sheet 2015 - 2016File: BL 16-17.pdf-
Balance Sheet 2014 - 2015File: BS_15-16.pdf-
Audited Profit and Loss Statement 2016 - 2017File: P & L 17-18.pdf-
Audited Profit and Loss Statement 2015 - 2016File: P&L 16-17.pdf-
Audited Profit and Loss Statement 2014 - 2015File: P & L 15-16.pdf-
Director's Report 2016 - 2017File: Director report_17-18_Declearation.jpg-
Director's Report 2015 - 2016File: Director report_16-17 _Declearation.jpg-
Director's Report 2014 - 2015File: Director report_15-16_Declearation.jpg-
Cash Flow Statement 2016 - 2017File: Cash flow statement_17-18_Declearation.jpg-
Cash Flow Statement 2015 - 2016File: Cash flow statement_16-17_Declearation.jpg-
Auditor's Report 2016 - 2017File: Auditor Report_17-18_Declearation.jpg-
Auditor's Report 2015 - 2016File: Auditor report_16-17_Declearation.jpg-
Auditor's Report 2014 - 2015File: Auditor report_15-16_Declearation.jpg-
Income Tax Return Acknowledgement 2016 - 2017File: ITR 17-18.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR 16_17.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: ITR 15-16.pdf-
Affidavit_form B-
Prospectus/BrochureFile: brochure.jpg-
Advertisement Copy 1File: Banner- Mellow.jpg-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_181122_002142.xlsx-
Occupancy CertificateFile: Occupancy Certificate.pdf-
Consent for operation issued by KSPCBFile: CFO.pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: Lift permission.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: BESCOM.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: BWSSB.pdf-
Architect certificate for having completed the work(in format no 5)File: Architect.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Chartered accountant.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Affidavit.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 6 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep GUNINA MELLOW on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmGUNINA MELLOWOther 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 12 registered projects within 2 km.

Builder: GUNINA STRUCTURES

GUNINA STRUCTURES has 1 registration on RERA Karnataka, including GUNINA MELLOW. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if GUNINA MELLOW is delayed beyond 15 Nov 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of GUNINA MELLOW?

The registered promoter entity is GUNINA STRUCTURES, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in GUNINA MELLOW?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at GUNINA MELLOW?

The professionals named in the filing: Architect: ARCHITECTURE STUDIO; Engineer: PARAMOUNT STRUCTURAL CONSULTANTS. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GUNINA MELLOW?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GUNINA MELLOW. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GUNINA MELLOW to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.