ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / GS PEARL

Registered No litigation declared Residential / Group Housing project

GS PEARL

By PRACH REALCON LLP

RG-MH-06912 · RERA P51800053941 · Last updated on MahaRERA portal: 20 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 32%
1 of 1Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

GS PEARL is a Residential / Group Housing project by PRACH REALCON LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800053941 on 11 Dec 2023. Possession is promised by 31 Dec 2026. 0 of the 1 unit on this registration is recorded sold or booked, and 4 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameGS PEARL
  • TypeResidential / Group Housing
  • Location
    • HARIYALI VILLAGE KANNAMWAR NAGAR
    • VIKHROLI EAST
    • Vikhroli
    • Kurla
    • Mumbai Suburban
    • 400083
  • Pincode400083
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800053941
  • ReraGenie IDRG-MH-06912

Builder

  • NamePRACH REALCON LLP
  • Entity typePartnership
  • Designated PartnerCHIRAG NITIN JOBANPUTRA
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Dec 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed93 files

Current status

0%0 of 1 units booked

Figures as on 20 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GS PEARLNA1818101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 32%.

GS PEARL: 42% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure32%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities17

As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Others - Society OfficeYes0%
Others - Fitness CenterYes0%

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Closed/Covered32

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area647 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Sep 2024
LandownerVillageDistrict
KANNAMWAR NAGAR PANCHVAIBHAV CHS LTDVikhroliMumbai Suburban

Approvals and building plan

Permissible FSI4815.88
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBOKDE BUILDING NS ROAD MULUND W

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPACE DESIGN PVT LTD
ArchitectSPACE DESIGN PRIVATE LIMITED
EngineerEPICONS CONSULTANTS PVT LTD
EngineerYOGESH GANGADHAR KHANDAR
Chartered AccountantM D BAROT ASSOCIATES
Chartered AccountantDILIP BANSILAL JAIN
Chartered AccountantMANISH DOSAL BAROT
PartnerRole in project
PRACH REALCON LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600388Bhakti AchrekarPRACH REALCON LLP29/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A RERA Certificate 2526 q4 5.pdf20 May 2026
Form 1File: Form 1 Q4 25-26 B05.pdf19 May 2026
Form 2File: Form 2 Q4 25-26 B05.pdf19 May 2026
Form 3File: Form 3 Q4 25-26 B05.pdf19 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unslod Inventory Q4 2526 B05.pdf19 May 2026
Form 1File: Form 1 Q2 2425 05.pdf15 Jan 2026
Form 2File: Form 2 Q2 2425 05.pdf15 Jan 2026
Form 3File: Form 3 Q2 2425 05.pdf15 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold list q2 2425 05.pdf15 Jan 2026
Form 1File: Form 1 Q3 2526 b05.pdf15 Jan 2026
Form 2File: Form 2 Q3 2526 b05.pdf15 Jan 2026
Form 3File: Form 3 Q3 2526 b05.pdf15 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold list q3 2526 b05.pdf15 Jan 2026
Form 1File: Form 1 Q2 25-26.pdf30 Oct 2025
Form 2File: Form 2 Q2 25-26.pdf30 Oct 2025
Form 3File: Form 3 Q2 25-26.pdf30 Oct 2025
Disclosure of Sold and Booked InventoryFile: 05 Sold unsold inventory q2 25-26.pdf30 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 scan 05 2425.pdf19 Sep 2025
Form 1File: Form 1 Q1 2526 b5.pdf29 Jul 2025
Form 2File: Form 2 Q1 2526 b5.pdf29 Jul 2025
Form 3File: Form 3 Q1 2526 b5.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory q1 2526 b5.pdf29 Jul 2025
Form 1File: FORM 1 Q3 24-25 B05.pdf19 Jul 2025
Form 2File: FORM 2 Q3 24-25 B05.pdf19 Jul 2025
Form 3File: FORM 3 Q3 24-25 B05.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory 05.pdf19 Jul 2025
Form 1File: Form 1 Q1 24-25 05.pdf19 Jul 2025
Form 2File: Form 2 Q1 24-25 05.pdf19 Jul 2025
Form 3File: Form 3 Q 24-25 05.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Soldbooked Q1 2425 05 List.pdf19 Jul 2025
Form 1File: Form 1 Q4 23-24 B05.pdf19 Jul 2025
Form 2File: Form 2 Q4 23-24 B05.pdf19 Jul 2025
Form 3File: Form 3 Q4 23-24 B05.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold bookedinventory List Q4 23-24 B05.pdf19 Jul 2025
OthersFile: Form 2A Q4 23-24 B05.pdf19 Jul 2025
Form 1File: Form 1 Q3 23-24 B05.pdf19 Jul 2025
Form 2File: Form 2 Q3 23-24 B05.pdf19 Jul 2025
Form 3File: Form 3 Q3 23-24 B05.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory 05.pdf19 Jul 2025
Form 2A (FY 2023-2024)File: Form 2A Q4 23-24 B05.pdf19 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A 2024-25.pdf19 Jul 2025
Form 5 (FY 2023-2024)File: Form 5 23-24 05.pdf19 Jul 2025
Form 1File: FORM 1 Q4 24-25 B05.pdf30 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q3 24-25 B05.pdf24 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 24-25 B05.pdf24 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3 24-25 B05.pdf24 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory 05.pdf24 Feb 2025
Layout approvalFile: Amend Plan 06012025 05.pdf7 Feb 2025
Layout approvalFile: Amend_Plan_06012025_(1).pdf7 Feb 2025
Building plan approvalFile: Amended IOA 06012025.pdf7 Feb 2025
Copy of Layout Approval (in case of layout)File: Amend Plan 06012025 05.pdf7 Feb 2025
Copy of Layout Approval (in case of layout)File: Amend_Plan_06012025_(1).pdf7 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: GS Pearl CC 05-02-2025.pdf7 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA 06012025.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 2324 05.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2 2324 05.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 2324 05.pdf2 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24 05.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 24-25 05.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q 24-25 05.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1 24-25 05.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold List.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 23-24 B05.pdf30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 23-24 B05.pdf30 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Q4 23-24 B05.pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold bookedinventory List Q4 23-24 B05.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 23-24 B05.pdf30 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 23-24 B05.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 23-24 B05.pdf30 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory 05.pdf30 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 23-24 B05.pdf30 Jan 2024
CERSAI detailsFile: Declaraion CERSAI 22-11.pdf22 Nov 2023
Proforma of Allotment letterFile: Draft AL 18-11.pdf18 Nov 2023
Proforma of Agreement for saleFile: Draft AFS 18-11.pdf18 Nov 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS 18-11.pdf18 Nov 2023
Other - LegalFile: LLP Agreement compressed.pdf6 Nov 2023
Other - TechnicalFile: Communication from MHADA.pdf6 Nov 2023
Details of encumbrances concerned to FinanceFile: Encumbrance on project.pdf4 Nov 2023
Details of encumbrances concerned to LegalFile: Encumbrance on project.pdf4 Nov 2023
Declaration about Commencement CertificateFile: Format D CC Declaration.pdf4 Nov 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
GS 47TH AVENUEP51800027446VILLAGE HARIYALI VIKHROLI EAST, Mumbai SuburbanDec 2020CompletedDec 2024Jul 2023

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GS PEARL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VIKHROLI EAST6,700+ in Mumbai Suburban

2 kmGS PEARLCompleted 24Lapsed / revoked 23Other 80Dot size: filed unitsN

Filed coordinates, straight-line distance. 127 registered projects within 2 km.

Builder: PRACH REALCON LLP

PRACH REALCON LLP has 2 registrations on MahaRERA, including GS CASA and GS PEARL. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if GS PEARL is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GS PEARL?

The registered promoter entity is PRACH REALCON LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GS PEARL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GS PEARL?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GS PEARL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GS PEARL?

The professionals named in the filing: Architect: SPACE DESIGN PVT LTD; Architect: SPACE DESIGN PRIVATE LIMITED; Engineer: EPICONS CONSULTANTS PVT LTD; Engineer: YOGESH GANGADHAR KHANDAR; Chartered Accountant: M D BAROT ASSOCIATES; Chartered Accountant: DILIP BANSILAL JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GS PEARL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GS PEARL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GS PEARL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.