Home / Browse projects / Mumbai Suburban, Maharashtra / GS CASA

Registered No litigation declared Residential / Group Housing project

GS CASA

By PRACH REALCON LLP

RG-MH-99482 · RERA P51800049559 · Last updated on MahaRERA portal: 12 Feb 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 81%
23 of 68Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 125 documents Report an error

GS CASA is a Residential / Group Housing project by PRACH REALCON LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049559 on 15 Feb 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 45 of the 68 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameGS CASA
  • TypeResidential / Group Housing
  • Location
    • KANNWAR ROAD
    • VILLAGE HARIYALI
    • VIKHROLI
    • Vikhroli
    • Kurla
    • Mumbai Suburban
    • 400083
  • Pincode400083
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800049559
  • ReraGenie IDRG-MH-99482

Builder

  • NamePRACH REALCON LLP
  • Entity typePartnership
  • Designated PartnerPRASHANT NARAINDAS THAKUR
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2023First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed125 files

Current status

66%45 of 68 units booked
57.3%Work done, per cost certificate

Figures as on 12 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GS CASANA222268068

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 81%.

GS CASA: 71% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure81%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 12 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes20%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed38

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots38
Closed/Covered38

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area646 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Sep 2024
LandownerVillageDistrict
KANNAMWAR NAGAR EKTA CO-OPERATIVE HSG LTDHariyaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI4921.25
Proposed, not sanctioned3,794 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBODKE BLDG NS ROAD MULUND W MUMBAI 400080
Estimated costRs 56.00 cr
Cost incurredRs 32.10 cr
Work done57.32%
BuildingWingEstimatedIncurred
GS CASANARs 55.00 crRs 32.10 cr
-NARs 1.00 cr-

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPACE DESIGN PVT LTD
ArchitectSPACE DEIGN PRIVATE LIMITED
EngineerR C TIPNIS
EngineerRAJAN CHANDRAKANT TIPNIS
EngineerYOGESH GANGADHAR KHANDAR
Chartered AccountantM D BAROT ASSOCIATES
Chartered AccountantDILIP BANSILAL JAIN
Chartered AccountantMANISH DOSAL BAROT
PartnerRole in project
PRACH REALCON LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA17112518350Dec 2025 → Dec 2026

Reason as filed by the promoterReasonable circumstances beyond our control: This is our first time extension application. Our deadline was 31st Dec 2025. Photos of current status of of Project and Architect Undertaking is attached with the application. Request kind approval for extension of 1 year i.e upto 31st Dec 2026

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed125

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 125 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 q3 2526 b13.pdf12 Feb 2026
Withdrawal Update Form 2File: Form 2 q3 2526 b13.pdf12 Feb 2026
Withdrawal Update Form 3File: Form 3 q3 2526 b13.pdf12 Feb 2026
Form 1File: Form 1 Q2 25-26.pdf30 Oct 2025
Form 2File: Form 2 Q2 25-26.pdf30 Oct 2025
Form 3File: Form 3 Q2 25-26.pdf30 Oct 2025
Disclosure of Sold and Booked InventoryFile: 13 Sold unsold inventory q2 25-26.pdf30 Oct 2025
Form 5 (FY 2024-2025)File: Form scan 5 13 24-25.pdf19 Sep 2025
Form 1File: Form 1 q1 2526 b13.pdf29 Jul 2025
Form 2File: Form 2 q1 2526 b13.pdf29 Jul 2025
Form 3File: Form 3 q1 2526 b13.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold inventory q1 2526 b13.pdf29 Jul 2025
Form 1File: Form 1.pdf18 Jul 2025
Form 2File: Form 2.pdf18 Jul 2025
Form 3File: Form 3.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory.pdf18 Jul 2025
Form 1File: Form 1 q2 2324.pdf18 Jul 2025
Form 2File: Form 2 q2 2324.pdf18 Jul 2025
Form 3File: Form 3 q2 2324.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked status.pdf18 Jul 2025
Form 1File: Form 1.pdf18 Jul 2025
Form 2File: Form 2.pdf18 Jul 2025
Form 3File: Form 3.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: diclosure sold booked inventory.pdf18 Jul 2025
Form 1File: Form 1.pdf18 Jul 2025
Form 2File: Form 2.pdf18 Jul 2025
Form 3File: Form 3.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Booked Sold inventory.pdf18 Jul 2025
OthersFile: Form 2A.pdf18 Jul 2025
Form 2A (FY 2022-2023)File: Form 2A.pdf18 Jul 2025
Form 2A (FY 2023-2024)File: Form 2A.pdf18 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A 2425 13.pdf18 Jul 2025
Form 5 (FY 2022-2023)File: Form 5 22-23.pdf18 Jul 2025
Form 5 (FY 2023-2024)File: Form 5 2324 13.pdf18 Jul 2025
Form 1File: Form 1 Q3 24-25 13.pdf3 Jul 2025
Form 2File: FORM 2 Q3 24-25 13.pdf3 Jul 2025
Form 3File: Form 3 Q3 24-25 13.pdf3 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory.pdf3 Jul 2025
Form 1File: Form 1 Q4 24-25 13.pdf3 Jul 2025
Form 2File: Form 2 Q1 24-25 B13.pdf3 Jul 2025
Form 3File: Form 3 Q1 24-25 13.pdf3 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold List.pdf3 Jul 2025
Form 1File: Form 1 Q2 24-25 13.pdf3 Jul 2025
Form 2File: Form 2 Q2 24-25 13.pdf3 Jul 2025
Form 3File: Form 3 Q2 24-25 13.pdf3 Jul 2025
Disclosure of Sold and Booked InventoryFile: Q2 Disclosure of sold Booked Inventory.pdf3 Jul 2025
Form 1File: Form 1 Q4 23-24 B13.pdf3 Jul 2025
Form 2File: Form 2 Q4 23-24 B13.pdf3 Jul 2025
Form 3File: Form 3 Q4 23-24 B13.pdf3 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory List Q4 23-24 B13.pdf3 Jul 2025
OthersFile: Form 2A.pdf3 Jul 2025
Form 1File: Form 1 Q4 24-25 13.pdf30 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 24-25 13.pdf24 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 24-25 13.pdf24 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3 24-25 13.pdf24 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory.pdf24 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 24-25 13.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2 24-25 13.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 24-25 13.pdf2 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2324 13.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 24-25 13.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 24-25 13.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1 24-25 B13.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold unsold List.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 23-24 B13.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 23-24 B13.pdf30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 23-24 B13.pdf30 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory List Q4 23-24 B13.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 23-24 B13.pdf30 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf30 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory.pdf30 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf30 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Revalidation.pdf6 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 q2 2324.pdf23 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 q2 2324.pdf23 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Booked status.pdf23 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 q2 2324.pdf23 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 q2 2324.pdf23 Nov 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
GS 47TH AVENUEP51800027446VILLAGE HARIYALI VIKHROLI EAST, Mumbai SuburbanDec 2020CompletedDec 2024Jul 2023

How this compares with Mumbai Suburban

66%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GS CASA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILLAGE HARIYALI, VIKHROLI6,700+ in Mumbai Suburban

2 kmGS CASACompleted 25Lapsed / revoked 25Other 86Dot size: filed unitsN

Filed coordinates, straight-line distance. 136 registered projects within 2 km.

Builder: PRACH REALCON LLP

PRACH REALCON LLP has 2 registrations on MahaRERA, including GS CASA and GS PEARL. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if GS CASA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GS CASA?

The registered promoter entity is PRACH REALCON LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GS CASA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GS CASA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GS CASA?

The professionals named in the filing: Architect: SPACE DESIGN PVT LTD; Architect: SPACE DEIGN PRIVATE LIMITED; Engineer: R C TIPNIS; Engineer: RAJAN CHANDRAKANT TIPNIS; Engineer: YOGESH GANGADHAR KHANDAR; Chartered Accountant: M D BAROT ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GS CASA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GS CASA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GS CASA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.