Green Edge Signature
RG-KA-54301 · RERA PRM/KA/RERA/1251/446/PR/220424/006831 · Last updated on RERA Karnataka portal: 14 Mar 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Green Edge Signature is a Residential/Group Housing project by Green Edge Ventures in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/220424/006831 on 22 Apr 2024. Possession is promised by 31 Dec 2026. 19 of the 216 units on this registration are recorded sold or booked, and 8 of 19 construction stages are filed complete.
At a glance
Project
- NameGreen Edge Signature
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/446/PR/220424/006831
- ReraGenie IDRG-KA-54301
Builder
- NameGreen Edge Ventures
- Entity typePartnership Firm
- GSTIN29AAXFG8863C1ZO
- Authorized SignatoryB NARASIMHA REDDY
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on22 Apr 2024
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings2 building records
- Documents filed178 files
Current status
Figures as on 14 Mar 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BLOCK-A | - | - | - | 112 | 0 | 112 |
| BLOCK-B | - | - | - | 104 | 0 | 104 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 19 construction stages are filed complete. The stage furthest along is Joinery: Doors, at 10%.
Building: 43% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 10% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | 0% |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities34
As on 14 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 70% |
| Sewage and Drainage System | Yes | 50% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 40% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 30% |
| Solid waste management and disposal | Yes | 30% |
| Emergency Evacuation services | Yes | 20% |
| Internal Roads & Footpaths | Yes | 67% |
| Electricity supply transformer and substation | Yes | 30% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Water and Sanitation | Yes | 0% |
| Staircases | Yes | 77% |
| Lifts | Yes | 66% |
| Corridor/lobbies | Yes | 60% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 60% |
| Outer Wall | Yes | 80% |
| Open parking areas | Yes | 55% |
| Provision for lodging of management staff and security staff | Yes | 10% |
| Water conservation and renewable energy | Yes | 5% |
Land and ownership9
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| JAYAMMA & OTHERS | - | - |
| SRINIVAS REDDY & OTHERS | - | - |
| VENUGOPAL SJ | - | - |
| SAROJAMMA and OTHERS | - | - |
| GOWRAMMA and OTHERS | - | - |
| MUNIRAJU and OTHERS | - | - |
| VENKATESH and OTHERS | - | - |
| MUNIYAPPA and OTHERS | - | - |
| RATHNAMMA and OTHERS | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 84.10 cr | Rs 41.82 cr |
| Payment of taxes | Rs 6.54 cr | Rs 2.50 cr |
| On-site expenditure-Site Overhead | Rs 4.19 cr | - |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 2.80 cr | Rs 1.49 cr |
| On-site expenditure-Consultants Fees | Rs 75.80 lakh | Rs 2.30 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Bommu Veera Narendranath Reddy |
| Engineer | Madamanchi Surendra Nadh |
| Chartered Accountant | CH PRANAY KUMAR |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed178
As listed on the registration, under the names the promoter filed them with; the newest 80 of 178 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/220424/006831 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 CA Certificate 311226 Signature.pdf | 14 Mar 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate-31122025 Signature.pdf | 14 Mar 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate-31122025 Signature.pdf | 14 Mar 2026 |
| Commencement CertificateFile: Commencement Certificate.pdf | 21 Apr 2024 |
| Relinquishment DeedFile: Relinquishment Deed.pdf | 21 Apr 2024 |
| Balance Sheet with UDINFile: Balance Sheet with UDIN.pdf | 18 Apr 2024 |
| Profit & Loss with UDINFile: Profit & Loss with UDIN.pdf | 18 Apr 2024 |
| Agreemnent Of Sale - AOSFile: Agreemnent Of Sale - AOS.pdf | 18 Apr 2024 |
| Affidavit Section of 3(1) violationFile: Affidavit Section of 3(1) violation.pdf | 18 Apr 2024 |
| Bank AffidavitFile: Bank Affidavit.pdf | 18 Apr 2024 |
| Certified Common Area & Amenities DetailsFile: Certified Common Area & Amenities Details.pdf | 18 Apr 2024 |
| Certified Area StatementFile: Certified Area Statement.pdf | 18 Apr 2024 |
| Demarked site location in CDPFile: Demarked site location in CDP.pdf | 18 Apr 2024 |
| Demarked site location in Google MapFile: Demarked site location in Google Map.pdf | 18 Apr 2024 |
| Demarked site location in Road MapFile: Demarked site location in Road Map.pdf | 18 Apr 2024 |
| Demarked site location in Village MapFile: Demarked site location in Village Map.pdf | 18 Apr 2024 |
| Demarked STP in Approved PlanFile: Demarked STP in Approved Plan.jpg | 18 Apr 2024 |
| Form 3 Engineer CertificateFile: Form 3 Engineer Certificate.pdf | 18 Apr 2024 |
| Gift Deed 60-10File: Gift Deed 60-10.pdf | 18 Apr 2024 |
| Gift Deed 60-19File: Gift Deed 60-19.pdf | 18 Apr 2024 |
| KSPCB and SEIAA NOC,sFile: KSPCB and SEIAA NOC,s.pdf | 18 Apr 2024 |
| Release Deed 58-2File: Release Deed 58-2.pdf | 18 Apr 2024 |
| Relinquishment Deed VarthurFile: Relinquishment Deed Varthur.pdf | 18 Apr 2024 |
| Sale deed 58-2File: Sale deed 58-2.pdf | 18 Apr 2024 |
| Sale Deed 60-1File: Sale Deed 60-1.pdf | 18 Apr 2024 |
| Self attested AAI NOCFile: Self attested AAI NOC.pdf | 18 Apr 2024 |
| Self attested BBMP NOCFile: Self attested BBMP NOC.pdf | 18 Apr 2024 |
| Self attested Bescom NOC With FeeFile: Self attested Bescom NOC With Fee.pdf | 18 Apr 2024 |
| Self attested BSNL NOCFile: Self attested BSNL NOC.pdf | 18 Apr 2024 |
| Self Attested Engineer CertifcateFile: Self Attested Engineer Certifcate.pdf | 18 Apr 2024 |
| Self attested BWSSB NOC with receiptFile: Self attested BWSSB NOC with receipt.pdf | 18 Apr 2024 |
| Self attested HAL NOCFile: Self attested HAL NOC.pdf | 18 Apr 2024 |
| Self attested KSPCB NOCFile: Self attested KSPCB NOC.pdf | 18 Apr 2024 |
| Self attested FIRE NOC - convertedFile: Self attested FIRE NOC - converted.pdf | 18 Apr 2024 |
| Self attested MoeF NOCFile: Self attested MoeF NOC.pdf | 18 Apr 2024 |
| Sources of Fund to complete the projectFile: Sources of Fund to complete the project.pdf | 18 Apr 2024 |
| Zonal Regu Buffer Lake DetailsFile: Zonal Regu Buffer Lake Details.pdf | 18 Apr 2024 |
| ZR BDA-rmp2015File: ZR BDA-rmp2015.pdf | 18 Apr 2024 |
| Commencement CertificateFile: Commencement Certificate.pdf | 18 Apr 2024 |
| RTC, survey 58/2 | - |
| Mutation, survey 58/2 | - |
| Encumbrance Certificate, survey 58/2 | - |
| Conversion/Alienation Order, survey 58/2 | - |
| Sale/Title/Gift Deed, survey 58/2 | - |
| JDA, survey 58/2 | - |
| Khatha, survey 58/2 | - |
| RTC, survey 60/8 | - |
| Mutation, survey 60/8 | - |
| Encumbrance Certificate, survey 60/8 | - |
| Conversion/Alienation Order, survey 60/8 | - |
| Sale/Title/Gift Deed, survey 60/8 | - |
| JDA, survey 60/8 | - |
| Khatha, survey 60/8 | - |
| RTC, survey 60/9 | - |
| Mutation, survey 60/9 | - |
| Encumbrance Certificate, survey 60/9 | - |
| Conversion/Alienation Order, survey 60/9 | - |
| Sale/Title/Gift Deed, survey 60/9 | - |
| JDA, survey 60/9 | - |
| Khatha, survey 60/9 | - |
| RTC, survey 60/10 | - |
| Mutation, survey 60/10 | - |
| Encumbrance Certificate, survey 60/10 | - |
| Conversion/Alienation Order, survey 60/10 | - |
| Sale/Title/Gift Deed, survey 60/10 | - |
| JDA, survey 60/10 | - |
| Khatha, survey 60/10 | - |
| RTC, survey 60/19 | - |
| Mutation, survey 60/19 | - |
| Encumbrance Certificate, survey 60/19 | - |
| Conversion/Alienation Order, survey 60/19 | - |
| Sale/Title/Gift Deed, survey 60/19 | - |
| JDA, survey 60/19 | - |
| Khatha, survey 60/19 | - |
| RTC, survey 60/20 | - |
| Mutation, survey 60/20 | - |
| Encumbrance Certificate, survey 60/20 | - |
| Conversion/Alienation Order, survey 60/20 | - |
| Sale/Title/Gift Deed, survey 60/20 | - |
| JDA, survey 60/20 | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Green Edge Signature on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Green Edge Ventures
Green Edge Ventures has 1 registration on RERA Karnataka, including Green Edge Signature. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Green Edge Signature is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Green Edge Signature?
The registered promoter entity is Green Edge Ventures, a partnership firm as per the filing. Its GSTIN 29AAXFG8863C1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Green Edge Signature?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Green Edge Signature?
The professionals named in the filing: Architect: Bommu Veera Narendranath Reddy; Engineer: Madamanchi Surendra Nadh; Chartered Accountant: CH PRANAY KUMAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Green Edge Signature?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback