Registration approved No litigation declared Residential/Group Housing project

GREEN EDGE CASERO

By Green Edge Projects

RG-KA-91156 · RERA PRM/KA/RERA/1251/310/PR/220922/005265 · Last updated on RERA Karnataka portal: 20 Sep 2022

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2026Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 113 documents Report an error

GREEN EDGE CASERO is a Residential/Group Housing project by Green Edge Projects in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/220922/005265 on 22 Sep 2022. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameGREEN EDGE CASERO
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/220922/005265
  • ReraGenie IDRG-KA-91156

Builder

  • NameGreen Edge Projects
  • Entity typePartnership Firm
  • Authorized SignatoryB NARASIMHA REDDY

Key dates

this monthRegisteredSep 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on22 Sep 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed113 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING A---1170117

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 20 Sep 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 20 Sep 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-
Common storage spacesYes-

Land and ownership4

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners4
LandownerVillageDistrict
HEMANTH KUMAR--
NARAYANAPPA--
GOWRAMMA--
RENUKA N--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 45.94 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 45.94 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSwetha B
EngineerPraveen Kumar G
Chartered AccountantC Prakash Reddy

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed113

As listed on the registration, under the names the promoter filed them with; the newest 80 of 113 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/220922/005265 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
P &L Account & Balance Sheet 2021File: P &L Account & Balance Sheet 2021.pdf20 Sep 2022
Supplementary Partnership DeedFile: Supplementary Partnership Deed.pdf20 Sep 2022
Profit & Loss 2021File: Profit & Loss 2021.pdf5 Sep 2022
Balance Sheet 2021File: Balance Sheet 2021.pdf5 Sep 2022
Building LicenseFile: Building License.pdf5 Sep 2022
FAR SANCTION DetailsFile: FAR SANCTION Details.pdf5 Sep 2022
Development Details (Bifurcation of Type of Break up of types of BHKFile: Development Details (Bifurcation of Type of InventoriesFlatsSitesPlotsVillas) Break up of 5 Sep 2022
CARPET AREAFile: CARPET AREA.pdf5 Sep 2022
FORM 1 CA CERTIFICATEFile: Form 1 CA Certificate.pdf23 Aug 2022
CA UDINFile: CA UDIN.pdf23 Aug 2022
Advocate Search Report with sing on letterheadFile: Adv Serch Report.pdf23 Aug 2022
IHR MR of Narayana ReddyFile: IHR MR of Narayana Reddy.pdf23 Aug 2022
Partnership DeedFile: PartnershipDeed.pdf23 Aug 2022
Guideline Value of Land costFile: Guideline Value seegehalli.pdf23 Aug 2022
Building LicenseFile: Building License.pdf23 Aug 2022
Relinquishment DeedFile: Relinquishment Deed.pdf23 Aug 2022
Development Details with bifercationFile: Development Details.pdf23 Aug 2022
Total built Up Area is 18371.36SQMTRFile: Drawing Site,Section,Elevation& Terrace Floor.pdf23 Aug 2022
Carparking total required 129 given 131File: Car Parking Confirmation.pdf23 Aug 2022
CDP PlanFile: CDPPlan.pdf23 Aug 2022
Village Map MarkedFile: VillageMapMarked.pdf23 Aug 2022
Project Specifications signedFile: Project Specifications.pdf23 Aug 2022
NOC BESCOMFile: NOC BESCOM.pdf23 Aug 2022
NOC FIREFile: NOC FIRE.pdf23 Aug 2022
NOC KSPCBFile: NOC KSPCB.pdf23 Aug 2022
NOC PDO WaterFile: NOC PDO Water.pdf23 Aug 2022
Panchayat LicenceFile: Panchayat Licence.pdf23 Aug 2022
Car Parking ConfirmationFile: Car Parking Confirmation.pdf23 Aug 2022
STP Demarcation site planFile: STP Demacration site plan_page-0001.pdf23 Aug 2022
Fee ReceiptFile: Fee Receipt.pdf23 Aug 2022
Section of the 3(1) Affidavat with ACK project nameFile: Section of the 3(1) Affidavat.pdf23 Aug 2022
Board ResolutionFile: BOARD RESOLUTION.pdf23 Aug 2022
CERTIFICATE OF STRUCTURAL SAFETY FOR BUILDINGFile: CERTIFICATE OF STRUCTURAL SAFETY FOR BUILDING.pdf23 Aug 2022
Proforma of Sale Agreement of SaleFile: Proforma of Sale Agreement of Sale.pdf23 Aug 2022
NOC AIRPORTFile: NOC AIRPORT.pdf23 Aug 2022
RTC, survey 87/4-
Mutation, survey 87/4-
Encumbrance Certificate, survey 87/4-
Conversion/Alienation Order, survey 87/4-
JDA, survey 87/4-
Khatha, survey 87/4-
Registration CertificateFile: Firm Registration Copy.pdf-
Partnership DeedFile: PartnershipDeed.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form 1 CA Certificate (1).pdf-
Certificate issued by Architect Form 2File: Form 2 architect Certificate.pdf-
Certificate issued by Engineer Form 3File: Form 3 Engineer Certificate (2).pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non Litigation Affidavit.pdf-
Certificate from Chartered AccountFile: Form 1 CA Certificate (1).pdf-
Balance Sheet 2020 - 2021File: New company.pdf-
Balance Sheet 2019 - 2020File: New company.pdf-
Balance Sheet 2018 - 2019File: New company.pdf-
Audited Profit and Loss Statement 2020 - 2021File: New company.pdf-
Audited Profit and Loss Statement 2019 - 2020File: New company.pdf-
Audited Profit and Loss Statement 2018 - 2019File: New company.pdf-
Director's Report 2020 - 2021File: New company.pdf-
Director's Report 2019 - 2020File: New company.pdf-
Director's Report 2018 - 2019File: New company.pdf-
Cash Flow Statement 2020 - 2021File: New company.pdf-
Cash Flow Statement 2019 - 2020File: New company.pdf-
Auditor's Report 2020 - 2021File: New company.pdf-
Auditor's Report 2019 - 2020File: New company.pdf-
Auditor's Report 2018 - 2019File: New company.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: New company.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: New company.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: New company.pdf-
NOC BDA Licence-
NOC BESCOM-
NOC PDO Water-
Approved Layout plan-
NOC BDA Licence-
Existing layou Plan-
Existing Section drawing-
Sectional drawing of the Apratments-
Projec Specifications-
Sectional drawing of the Apratments - Copy-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep GREEN EDGE CASERO on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Green Edge Projects

Green Edge Projects has 1 registration on RERA Karnataka, including GREEN EDGE CASERO. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if GREEN EDGE CASERO is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of GREEN EDGE CASERO?

The registered promoter entity is Green Edge Projects, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in GREEN EDGE CASERO?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at GREEN EDGE CASERO?

The professionals named in the filing: Architect: Swetha B; Engineer: Praveen Kumar G; Chartered Accountant: C Prakash Reddy. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GREEN EDGE CASERO?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GREEN EDGE CASERO. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GREEN EDGE CASERO to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.