Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Aug 2023Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 85 documents Report an error

GRC SUBHIKSHA PHASE 2 is a Residential/Group Housing project by GRC INFRA PVT LTD in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/200219/003295 on 19 Feb 2020. Possession is promised by 15 Aug 2023. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameGRC SUBHIKSHA PHASE 2
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/200219/003295
  • ReraGenie IDRG-KA-32261

Builder

  • NameGRC INFRA PVT LTD
  • Entity typeCompany
  • Authorized SignatoryPRATHAP
  • Other registrations3 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredFeb 2020First promiseNov 2022Revised toAug 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on19 Feb 2020
  • Promised completion15 Aug 2023
  • Revised completionRevised to 15 Aug 2023 (originally 15 Nov 2022)
  • Buildings1 building record
  • Documents filed85 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C Bloock-----48

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 6 Feb 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 6 Feb 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionYes-
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,720 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 9.40 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGrey scale design studio LLP
EngineerRSD ENGINEERING

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionNov 2022 → Aug 2023

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed85

As listed on the registration, under the names the promoter filed them with; the newest 80 of 85 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/200219/003295 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
FORM-BFile: FORM-B-RERA.PDF6 Feb 2020
RTCFile: rtc rera.pdf29 Jan 2020
KhataFile: 22Khatha, GRC Infra.pdf29 Jan 2020
form BFile: FORM-B , notarised.PDF29 Jan 2020
Block A Previously registered PRM/KA/RERA/1251/308/PR/180504/001615 with 120 units. NO changeFile: a block.jpg29 Jan 2020
Block B Previously registered PRM/KA/RERA/1251/308/PR/180504/001615 with 120 units. NO changeFile: b block.jpg29 Jan 2020
Proposed Block C ack no: ACK/KA/RERA/1251/308/PR/200117/003830. 48 unitsFile: c block.jpg29 Jan 2020
All other queries addressed in this file : Queries.pdfFile: queries.pdf29 Jan 2020
director report 2017File: director report 2017.pdf25 Jan 2020
director report 2018File: director report 2018.pdf25 Jan 2020
director report 2019File: director report 2019.pdf25 Jan 2020
company registration certificateFile: registration certificate.pdf25 Jan 2020
bank account passbokFile: passbook -1639.pdf25 Jan 2020
form B notarizedFile: FORM-B , notarised.PDF25 Jan 2020
KhataFile: 22Khatha, GRC Infra.pdf25 Jan 2020
plan with licence letterFile: plan & licence copy.pdf25 Jan 2020
25conversion copy-
10Sanction Plan-
10Sanction Plan-
18 proforma sale deed-
12Agreement draft of GRC Subhiksha Final-
13 Sale deed-
10Sanction Plan-
10Sanction Plan-
16alottement letter-
19Specifications - FOR C BLOCK-
8EC from 01042004 to 22122019compressed-
22Khatha, GRC Infra-
17GRC Subhiksha broucher-
25conversion copy-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
30BWSSB NOC-
31Revised pollution NOC-
32Revised Environmental NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
37BDA Change of land-
Unnamed document-
Balance Sheet 2018 - 2019File: Balance Sheet AY 19-20.pdf-
Balance Sheet 2017 - 2018File: Balance Sheeet AY 18-19.pdf-
Balance Sheet 2016 - 2017File: Balance Sheet AY 17-18.PDF-
Audited Profit and Loss Statement 2018 - 2019File: P&L AY 19-20.pdf-
Audited Profit and Loss Statement 2017 - 2018File: P& L AY 18-19.pdf-
Audited Profit and Loss Statement 2016 - 2017File: P&L AY 17-18.PDF-
Director's Report 2018 - 2019File: 3CA & 3CD Infra AY 19-20.pdf-
Director's Report 2017 - 2018File: 3CA & 3CD Infra AY 17-18.pdf-
Director's Report 2016 - 2017File: 3CA & 3CD Infra AY 17-18.pdf-
Cash Flow Statement 2018 - 2019File: Cash Flow AY 19-20.pdf-
Cash Flow Statement 2017 - 2018File: Cash Flow AY 18-19.pdf-
Auditor's Report 2018 - 2019File: Audit Report 18-19_compressed (1).pdf-
Auditor's Report 2017 - 2018File: Audit Report 17-18_compressed.pdf-
Auditor's Report 2016 - 2017File: Audit Report 16-17_compressed (1).pdf-
Income Tax Return Acknowledgement 2018 - 2019File: ACK AY 19-20.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: ACK AY 18-19.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ACK AY 17-18.PDF-
21 FORM-B -'C BLOCK-
Tower Excel SheetFile: PRM_KA_RERA_1251_308_PR_200219_003295.xlsx-
Occupancy CertificateFile: OC.pdf-
Consent for operation issued by KSPCBFile: KSPCB NOC.pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: Lift License.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: Bescom approval letter for C Block.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: Water NOC.pdf-
Details of external infrastructure work such as drive way, play area, park, STP and water treatment plant, WheFile: KSPCB NOC 1.pdf-
Common Area and other amenities facilities are completed or not and details of handling over of the same to asFile: Clarification on Amenities and Association.pdf-
Architect certificate for having completed the work(in format no 5)File: Architect Completion Certificate.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep GRC SUBHIKSHA PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmGRC SUBHIKSHA PHASE 2Other 41Dot size: filed unitsN

Filed coordinates, straight-line distance. 41 registered projects within 2 km.

Builder: GRC INFRA PVT LTD

GRC INFRA PVT LTD has 4 registrations on RERA Karnataka, including GRC Subhiksha and GRC SUBHIKSHA PHASE 2. Its filings declare 3 earlier projects, 3 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if GRC SUBHIKSHA PHASE 2 is delayed beyond 15 Aug 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of GRC SUBHIKSHA PHASE 2?

The registered promoter entity is GRC INFRA PVT LTD, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in GRC SUBHIKSHA PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at GRC SUBHIKSHA PHASE 2?

The professionals named in the filing: Architect: Grey scale design studio LLP; Engineer: RSD ENGINEERING. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GRC SUBHIKSHA PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GRC SUBHIKSHA PHASE 2. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GRC SUBHIKSHA PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.