Red flags

  • Completion date moved by 5 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Nov 2020Possession promisedmoved 5 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 67 documents Report an error

Grace Commercial Residency is a Mixed Development project by Valstel Builders in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/336/PR/180524/001813 on 24 May 2018. Possession is promised by 14 Nov 2020. The completion date has moved by 5 months from the original filing.

At a glance

Project

  • NameGrace Commercial Residency
  • TypeMixed Development
  • Location
    • Bantwala
    • Dakshina Kannada
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1257/336/PR/180524/001813
  • ReraGenie IDRG-KA-91949

Builder

  • NameValstel Builders
  • Entity typePartnership Firm
  • Authorized SignatoryJossy Lobo
  • OthersAna Gracey Rufina Dias, Jossy Lobo

Key dates

this monthRegisteredMay 2018First promiseJun 2020Revised toNov 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on24 May 2018
  • Promised completion14 Nov 2020
  • Revised completionRevised to 14 Nov 2020 (originally 30 Jun 2020)
  • Buildings1 building record
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GRACE COMMERCIAL RESIDENCY-----77

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 21 Jan 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 21 Jan 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,801 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 10.55 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLathish Kotian
EngineerLathish Kotian
EngineerVimal Anil

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1257/336/PR/201021/001813Jun 2020 → Nov 2020

Reason as filed by the promoterothers

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed67

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/336/PR/180524/001813 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Quarterly updates for each quarterFile: RERA 20-21.pdf21 Jan 2021
Inventory Details Flats & Shops- Old before ModificationFile: Inventory Details Flats & Shops- Old before Modification.pdf14 Dec 2020
Certificate for extentionFile: EXPRMKARERA1257336PR201021001813.pdf14 Dec 2020
Project Comppletion certificateFile: Occupation Certificate- Local Panchayath.PDF14 Dec 2020
FEE CHALLANFile: RE1020021616101822 Rera Modification Aplication Fee Challan.pdf13 Nov 2020
Sold Inventory Details Flats & ShopsFile: Sold Inventory Details Flats & Shops.pdf13 Nov 2020
Unsold Inventory Details Flats & ShopsFile: Inventory Details Flats & Shops.pdf13 Nov 2020
Abstract Inventory Details Flats & ShopsFile: Abstract Inventory Details Flats & Shops.pdf13 Nov 2020
Bank StatementFile: Bank Statement.pdf13 Nov 2020
CertificateFile: Registration Certificate.pdf-
Already registered project ongoing detailsFile: NO ONGOING.pdf-
Modified plan details site plan, floor plans, Plan Licence LetterFile: PROJECT PLAN .pdf-
Elevation, Sections, Specifications ( If changes are there )File: NO CHANGES.pdf-
List Of AllotteesFile: LIST OF ALLOTTEES.pdf-
List Of ComplaintsFile: NO COMPLAINTS.pdf-
Consent LetterFile: Consent Letters.pdf-
List Of Pending LitigationsFile: NO LITIGATIONS.pdf-
Chartered Accountant CertificateFile: FORM -4 C A Certificate.PDF-
Notarized AffidavitFile: AFFIDAVIT.pdf-
Engineer CertificateFile: FORM-6.pdf-
Architect CertificateFile: FORM-5.pdf-
Structural Engineer Certificate for stability of structureFile: FORM-6.pdf-
Modification of Plan DetailsFile: BUILDING PLAN final.pdf-
Modification of Plan DetailsFile: PROJECT PLAN .pdf-
Modification of Plan DetailsFile: LICENCE COPY .pdf-
Modification of Plan DetailsFile: LICENCE COPY .pdf-
Modification of Plan DetailsFile: PROJECT DETAILS.pdf-
Modification of Plan DetailsFile: PROJECT DETAILS.pdf-
Document 1File: NOC.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Architect (status as on date).pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer (status as on date).pdf-
CA Certificate for Funds UtilizationFile: CA CERTIFICATE- FUND UTILIZED.PDF-
Architect Certificate for Pending Work Completion Schedule.File: Architect (pending work).pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer (pending work).pdf-
CA Certificate for Funds required for Project CompletionFile: CA CERTIFICATE- FUND REQUIRED.PDF-
AffidavitFile: AFFIDAVIT.pdf-
Latest Encumbrance CertificateFile: EC.pdf-
Consent letter from 2/3rd of AllotteesFile: Consent Letters.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.pdf-
NOC DetailsFile: ORDER COPY.pdf-
Document 1File: Bank Statement.pdf-
Document 2File: Commencement Certificate.pdf-
Document 3File: AFFIDAVIT.pdf-
Document 4File: State Bank of India.pdf-
Document 5File: AFFIDAVIT.pdf-
Document 6File: Affidavit.pdf-
Commencement certificate-
draft sale deed-
draft agreement for sale-
Sale deed and RTC-
Allotment Letter-
BROUCHURE-
Project specification -
Encumbrance-
CONVERTION AND KHATA final-
Memo of undstg-
STABILITY CERTIFICATE-
STABILITY CERTIFICATE-
Legal Opinion 1-
Form B-
Prospectus/BrochureFile: BROUCHURE.pdf-
Advertisement Copy 1File: BROUCHURE.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1257_336_PR_180524_001813.xlsx-
Occupancy CertificateFile: Occupation Certificate.PDF-
Completion certificateFile: Completion Certificate.PDF-
Registered Agreement of SaleFile: AGREEMENT.pdf-
Registered conveyance deed for an individual unitFile: SALE DEED.pdf-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one moved by 5 months
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep Grace Commercial Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

Builder: Valstel Builders

Valstel Builders has 1 registration on RERA Karnataka, including Grace Commercial Residency. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if Grace Commercial Residency is delayed beyond 14 Nov 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Grace Commercial Residency?

The registered promoter entity is Valstel Builders, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Grace Commercial Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Grace Commercial Residency?

The professionals named in the filing: Architect: Lathish Kotian; Engineer: Lathish Kotian; Engineer: Vimal Anil. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Grace Commercial Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Grace Commercial Residency. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Grace Commercial Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.