Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Sep 2020Possession promisedmoved 6 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 68 documents Report an error

GR Elysium3 is a Residential/Group Housing project by G R Builders in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/180420/001527 on 20 Apr 2018. Possession is promised by 30 Sep 2020. The completion date has moved by 6 months from the original filing.

At a glance

Project

  • NameGR Elysium3
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/180420/001527
  • ReraGenie IDRG-KA-28214

Builder

  • NameG R Builders
  • Entity typePartnership Firm
  • Authorized SignatoryR Gangadhar
  • OthersR Raghavendra Reddy

Key dates

this monthRegisteredApr 2018First promiseMar 2020Revised toSep 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on20 Apr 2018
  • Promised completion30 Sep 2020
  • Revised completionRevised to 30 Sep 2020 (originally 31 Mar 2020)
  • Buildings2 building records
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
block A and Block B---1440144
Block B---16016

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,774 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 39.81 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYukti Consultants
EngineerIndigo Consultants

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionMar 2020 → Sep 2020

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed68

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/180420/001527 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: GR Builders Firm Reg.pdf-
9 Commencement certificate-
10 Building License -
11 Approved Plan-
18 proforma of sale deed-
12 Proforma of agreement of sale-
SALEDEEDS-
14 Approved section of building-
15 Area development plan of project area-
16 Proforma od allotment letter-
17 Brochure of current project - Copy - Copy-
32 SEIAA NOC-
19 Project specifications-
EC latest 9-
G R Builders Khatha002-
20 JDA-
23 GPA-
25 Conversion Order-
26 KPTCL NOC-
48 Utilization certificate-
49 Transfer of development rights certificate-
50 Relinquishment deed-
27 Fire force Dep NOC-
28 Airport Authority of India NOC-
29 BESCOM NOC-
30 BWSSB NOC-
31 KSPCB NOC-
32 SEIAA NOC-
33 BSNL NOC-
46 NOC of building abutting to neighbouring-
Unnamed document-
39 Urban land ceiling NOC-
37 BMRCL NOC-
41 Bangalore urban arts commission-
42 Inspector of factories-
43 District Magistrate-
44 Costal regulation zone authority-
45 Certificate from Enginer-
Section drawing-
35 Existing Layout Plan-
36 Existing Section Plan-
37 Change of land-
47 GR Legal opinion Narendra-
Balance Sheet 2016 - 2017File: BALANCE SHEET.pdf-
Balance Sheet 2015 - 2016File: BALANCE SHEET.pdf-
Balance Sheet 2014 - 2015File: BALANCE SHEET.pdf-
Audited Profit and Loss Statement 2016 - 2017File: financial report.pdf-
Audited Profit and Loss Statement 2015 - 2016File: financial report.pdf-
Audited Profit and Loss Statement 2014 - 2015File: financial report.pdf-
Director's Report 2016 - 2017File: DIRECTORS REPORT.pdf-
Director's Report 2015 - 2016File: DIRECTORS REPORT.pdf-
Director's Report 2014 - 2015File: DIRECTORS REPORT.pdf-
Cash Flow Statement 2016 - 2017File: CASH FLOW.pdf-
Cash Flow Statement 2015 - 2016File: CASH FLOW.pdf-
Auditor's Report 2016 - 2017File: AUDITORS REPORT.pdf-
Auditor's Report 2015 - 2016File: AUDITORS REPORT.pdf-
Auditor's Report 2014 - 2015File: AUDITORS REPORT.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: IT RETURNS.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: IT RETURNS.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: IT RETURNS.pdf-
21 Declartion (Form B)-
Prospectus/BrochureFile: Elysium3 BROUCHER.pdf-
Advertisement Copy 1File: 5Will update.jpg-
Tower Excel SheetFile: GRRERAEXCEL.xlsx-
Occupancy CertificateFile: OC CERTIFICATE GR .pdf-
Completion certificateFile: engineer completion Certificate.pdf-
Registered Agreement of SaleFile: RAKESH SALE AGREEMENT223.pdf-
Registered conveyance deed for an individual unitFile: RAKESH SALE DEED.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 6 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep GR Elysium3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmGR Elysium3Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 32 registered projects within 2 km.

Builder: G R Builders

G R Builders has 1 registration on RERA Karnataka, including GR Elysium3. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if GR Elysium3 is delayed beyond 30 Sep 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of GR Elysium3?

The registered promoter entity is G R Builders, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in GR Elysium3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at GR Elysium3?

The professionals named in the filing: Architect: Yukti Consultants; Engineer: Indigo Consultants. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GR Elysium3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GR Elysium3. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GR Elysium3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.