Home / Browse projects / Beed, Maharashtra / Gopal Residency

Registered No litigation declared Residential / Group Housing project

Gopal Residency

By AJINKYA BABURAO SHIRALE

RG-MH-36436 · RERA P52300056250 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Beed registration emailed to you, free during the pilot beta.
Sep 2027Possession promisedmoved 15 months from the original
18 of 66Construction stages doneacross 6 buildings; furthest along: Staircases, 50%
32 of 51Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

Gopal Residency is a Residential / Group Housing project by AJINKYA BABURAO SHIRALE in Beed, Maharashtra, registered with MahaRERA as P52300056250 on 22 May 2024. Possession is promised by 30 Sep 2027. The completion date has moved by 15 months from the original filing. 19 of the 51 units on this registration are recorded sold or booked, and 18 of 66 construction stages are filed complete.

At a glance

Project

  • NameGopal Residency
  • TypeResidential / Group Housing
  • Location
    • Chartha Road near Kapilmuni mandir
    • Gopal Nagari Ankush Nagar Beed
    • Bid (M Cl)
    • Beed
    • 431122
  • Pincode431122
  • RERA no.P52300056250
  • ReraGenie IDRG-MH-36436

Builder

  • NameAJINKYA BABURAO SHIRALE
  • Entity typeIndividual
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2024First promiseJun 2026Revised toSep 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 May 2024
  • Promised completion30 Sep 2027
  • Revised completionRevised to 30 Sep 2027 (originally 30 Jun 2026)
  • Buildings6 building records
  • Documents filed65 files

Current status

37%19 of 51 units booked
117.7%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROW HOUSE 1 to 11NA2211011
ROW HOUSE 12 to 15NA22404
ROW HOUSE 16 to 26NA2211011
ROW HOUSE 27 to 37NA2211011
ROW HOUSE 38 to 41NA22404
ROW HOUSE 42 to 51NA2210010

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Staircases, at 50%.

ROW HOUSE 1 to 1139%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE 12 to 1545%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE 16 to 2639%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE 27 to 3739%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE 38 to 4139%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE 42 to 5145%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,230 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 May 2025
LandownerVillageDistrict
Ajinkya Baburao ShiraleBid (M Cl)Beed

Approvals and building plan

Sanctioning authorityBeed Municpal corporation
Permissible FSI5310.14
Proposed, not sanctioned5,310 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHN 02 10 749 and 750 Wad no 2 Masrat Nagar Mondha Road Beed
Estimated costRs 4.84 cr
Cost incurredRs 5.70 cr
Work done117.71%
BuildingWingEstimatedIncurred
ROW HOUSE 1 to 11NARs 1.09 crRs 1.28 cr
ROW HOUSE 16 to 26NARs 1.05 crRs 1.23 cr
ROW HOUSE 27 to 37NARs 1.05 crRs 1.23 cr
ROW HOUSE 42 to 51NARs 91.93 lakhRs 1.08 cr
ROW HOUSE 38 to 41NARs 37.64 lakhRs 44.31 lakh
ROW HOUSE 12 to 15NARs 36.70 lakhRs 43.21 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANIRUDDHA DESHMUKH
EngineerDatta Raghunath Kharsade
Chartered AccountantSANTOSH P AMTE
Chartered AccountantJyoti Waghmode
PartnerRole in project
AJINKYA BABURAO SHIRALE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA03042620541Jun 2026 → Sep 2027

Reason as filed by the promoterIt is submitted that the project has faced delays due to a sustained slowdown in sales, affecting overall execution momentum. The supply of key raw materials was irregular and impacted by market fluctuations, leading to interruptions in construction activities. Additionally, internal works such as plastering and plumbing could not be completed within the planned timelines due to coordination and resource challenges. These factors collectively slowed down the progress of the project. Further, there has been a delay in obtaining the Occupancy Certificate (OC) due to procedural requirements and p

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2027

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1.pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2 Q1.pdf24 Apr 2026
Withdrawal Update Form 3File: Form 3 signed.pdf24 Apr 2026
Withdrawal Update Form 1File: Form1.pdf18 Jan 2026
Withdrawal Update Form 2File: Form 2 Q1.pdf18 Jan 2026
Withdrawal Update Form 3File: Form3.pdf18 Jan 2026
Withdrawal Update Form 1File: Form1.pdf22 Dec 2025
Withdrawal Update Form 2File: Form 2 Q1.pdf22 Dec 2025
Withdrawal Update Form 3File: Form3.pdf22 Dec 2025
Form 5 (FY 2024-2025)File: Form 5.pdf30 Sep 2025
Form 1File: Form 1 Q1.pdf23 May 2025
Form 1File: Form 1 Q2.pdf23 May 2025
Form 2File: Form 2 Q2.pdf23 May 2025
Form 3File: Form 3 as on Q2.pdf23 May 2025
Disclosure of Sold and Booked InventoryFile: 30 Sep 24 Inventory.pdf23 May 2025
Form 1File: Form 1 Q3.pdf23 May 2025
Form 2File: Form 2 Q3.pdf23 May 2025
Form 3File: Form 3 as on Q3.pdf23 May 2025
Disclosure of Sold and Booked InventoryFile: 31 Dec 24 Inventory.pdf23 May 2025
Form 1File: Form1 Q4.pdf23 May 2025
Form 2File: Form 2 Q4.pdf23 May 2025
Form 3File: Form 3 as on Q4.pdf23 May 2025
Disclosure of Sold and Booked InventoryFile: 31 March 25 Inventory.pdf23 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Q4.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on 30-06-2024 signed.pdf29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on 30-09-2024 signed.pdf29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on 31-12-2024 signed.pdf29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on 31-03-2025 signed.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 30 June 24 Inventory.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 30 Sep 24 Inventory.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 31 Dec 24 Inventory.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 31 March 25 Inventory.pdf29 Apr 2025
Details of encumbrances concerned to FinanceFile: Encumbrance Finance - Legal.pdf9 May 2024
Details of encumbrances concerned to LegalFile: Encumbrance Finance - Legal.pdf9 May 2024
Other - TechnicalFile: Annexure A old.pdf24 Apr 2024
Layout approvalFile: Layout 1-2.pdf13 Apr 2024
Layout approvalFile: Layout 3-4.pdf13 Apr 2024
Building plan approvalFile: Layout 5-6.pdf13 Apr 2024
Building plan approvalFile: Layout 7.pdf13 Apr 2024
Details of encumbrances concerned to FinanceFile: Self Declaration Regarding Encumbrance.pdf13 Apr 2024
Details of encumbrances concerned to LegalFile: Self Declaration Regarding Encumbrance.pdf13 Apr 2024
Copy of Layout Approval (in case of layout)File: Layout 1-2.pdf13 Apr 2024
Copy of Layout Approval (in case of layout)File: Layout 3-4.pdf13 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout 5-6.pdf13 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout 7.pdf13 Apr 2024
Declaration in FORM BFile: Ajinkya Shirale Bond.pdf13 Apr 2024
Declaration about Commencement CertificateFile: Declaration Commencement.pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Wthout Fact Signed.pdf1 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Diclosure promoter.pdf1 Apr 2024
Proforma of Agreement for saleFile: Draft Agreement.pdf1 Apr 2024
Proforma of Allotment letterFile: Allotment Letter.pdf1 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account for real estate proiects.pdf1 Apr 2024
Deviation Report with respect to Allotment letterFile: Deviation report allotmentt.pdf1 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report agreement.pdf1 Apr 2024
PAN CardFile: 1 PAN Card.pdf16 Mar 2024
Copy of the legal title reportFile: Legal Title Report compressed.pdf16 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf16 Mar 2024
CERSAI detailsFile: Cersai Details.pdf16 Mar 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
RAJLAXMI PARKP52300045241BEED, BeedMay 2022Certificate SignedJan 2024Apr 2023

How this compares with Beed

37%of this project is bookeddistrict median 0%
5%of Beed projects moved their completion datethis one moved by 15 months
73%of Beed registrations have lapsed or been cancelledthis one is on the register

Computed across the 95 Beed projects on ReraGenie, from their own filings.

Keep Gopal Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Gopal Nagari Ankush Nagar Beed95 in Beed

Builder: AJINKYA BABURAO SHIRALE

AJINKYA BABURAO SHIRALE has 3 registrations on MahaRERA, including RAJLAXMI PARK and Gopal Residency. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Beed district page.

Frequently asked questions

What are my rights if Gopal Residency is delayed beyond 30 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Gopal Residency?

The registered promoter entity is AJINKYA BABURAO SHIRALE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Gopal Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Gopal Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Gopal Residency?

The professionals named in the filing: Architect: ANIRUDDHA DESHMUKH; Engineer: Datta Raghunath Kharsade; Chartered Accountant: SANTOSH P AMTE; Chartered Accountant: Jyoti Waghmode. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Gopal Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Gopal Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Gopal Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.