Registration approved No litigation declared Residential/Group Housing project

GODREJ FLORENNE PHASE III

By Godrej Properties Limited

RG-KA-49952 · RERA PRM/KA/RERA/1250/304/PR/121026/009010 · Last updated on RERA Karnataka portal: 15 Sep 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Sep 2031Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 367 documents Report an error

GODREJ FLORENNE PHASE III is a Residential/Group Housing project by Godrej Properties Limited in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/121026/009010 on 12 Oct 2026. Possession is promised by 30 Sep 2031.

At a glance

Project

  • NameGODREJ FLORENNE PHASE III
  • TypeResidential/Group Housing
  • Location
    • Hosakote
    • Bengaluru Rural
    • 560117
  • Pincode560117
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1250/304/PR/121026/009010
  • ReraGenie IDRG-KA-49952

Builder

  • NameGodrej Properties Limited
  • Entity typeCompany
  • CINL74120MH1985PLC035308
  • GSTIN29AAACG3995M1ZX
  • Authorized SignatoryAbishek Kalro
  • Md & CeoGAURAV PANDEY
  • DirectorsGAURAV PANDEY, PIROJSHA ADI GODREJ, NADIR B GODREJ, SUTAPA BANERJEE, DR INDU BHUSHAN, JAYASHREE VAIDHYANATHAN, SUMEET NARANG
  • Project HeadAbishek Kalro
  • Other registrations16 more →
  • Declared earlier projects8 →

Key dates

this monthRegisteredOct 2026PromisedSep 2031

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on12 Oct 2026
  • Promised completion30 Sep 2031
  • Revised completionNone
  • Buildings1 building record
  • Documents filed367 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
9---24024

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 15 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyYes-
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningYes-
StaircasesYes-
LiftsNoNot applicable
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable

Land and ownership44

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area80,987 sq m
Named landowners44
LandownerVillageDistrict
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--
Godrej Properties Limited--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 40.70 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 32.24 cr-
On-site expenditure-Consultants FeesRs 6.75 cr-
On-site expenditure-Site OverheadRs 1.71 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShreyas M
EngineerDinesha Shetty
Chartered AccountantBhavesh D Shah

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed367

As listed on the registration, under the names the promoter filed them with; the newest 80 of 367 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/121026/009010 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Queries ResponseFile: Queries Reply Phase III.pdf15 Sep 2026
Floorwise StatementFile: FLOOR WISE DETAILS.pdf15 Sep 2026
Phasewise Demarcation signed by Architect.File: OWF RERA PHASE DEMARCATION-Signed 100926.pdf15 Sep 2026
Phasewise Unit area statementFile: Phaswise unit wise details phase-3 11-9-2026.pdf15 Sep 2026
Phasewise DecarationFile: phase wise declaartion phase 3 .pdf15 Sep 2026
Project SpecificationFile: project specification new .pdf15 Sep 2026
Final AFSFile: Final AFS-11-09-2026-Phase III.pdf15 Sep 2026
RTC, survey 116/4-
Mutation, survey 116/4-
Encumbrance Certificate, survey 116/4-
Conversion/Alienation Order, survey 116/4-
Sale/Title/Gift Deed, survey 116/4-
Khatha, survey 116/4-
RTC, survey 116/5-
Mutation, survey 116/5-
Encumbrance Certificate, survey 116/5-
Conversion/Alienation Order, survey 116/5-
Sale/Title/Gift Deed, survey 116/5-
Khatha, survey 116/5-
RTC, survey 116/6-
Mutation, survey 116/6-
Encumbrance Certificate, survey 116/6-
Conversion/Alienation Order, survey 116/6-
Sale/Title/Gift Deed, survey 116/6-
Khatha, survey 116/6-
RTC, survey 116/7-
Mutation, survey 116/7-
Encumbrance Certificate, survey 116/7-
Conversion/Alienation Order, survey 116/7-
Sale/Title/Gift Deed, survey 116/7-
Khatha, survey 116/7-
RTC, survey 117/7-
Mutation, survey 117/7-
Encumbrance Certificate, survey 117/7-
Conversion/Alienation Order, survey 117/7-
Sale/Title/Gift Deed, survey 117/7-
Khatha, survey 117/7-
RTC, survey 117/8-
Mutation, survey 117/8-
Encumbrance Certificate, survey 117/8-
Conversion/Alienation Order, survey 117/8-
Sale/Title/Gift Deed, survey 117/8-
Khatha, survey 117/8-
RTC, survey 117/9-
Mutation, survey 117/9-
Encumbrance Certificate, survey 117/9-
Conversion/Alienation Order, survey 117/9-
Sale/Title/Gift Deed, survey 117/9-
Khatha, survey 117/9-
RTC, survey 117/10-
Mutation, survey 117/10-
Encumbrance Certificate, survey 117/10-
Conversion/Alienation Order, survey 117/10-
Sale/Title/Gift Deed, survey 117/10-
Khatha, survey 117/10-
RTC, survey 118-
Mutation, survey 118-
Encumbrance Certificate, survey 118-
Conversion/Alienation Order, survey 118-
Sale/Title/Gift Deed, survey 118-
Khatha, survey 118-
RTC, survey 120/1-
Mutation, survey 120/1-
Encumbrance Certificate, survey 120/1-
Conversion/Alienation Order, survey 120/1-
Sale/Title/Gift Deed, survey 120/1-
Khatha, survey 120/1-
RTC, survey 120/2-
Mutation, survey 120/2-
Encumbrance Certificate, survey 120/2-
Conversion/Alienation Order, survey 120/2-
Sale/Title/Gift Deed, survey 120/2-
Khatha, survey 120/2-
RTC, survey 120/3-
Mutation, survey 120/3-
Encumbrance Certificate, survey 120/3-
Conversion/Alienation Order, survey 120/3-
Sale/Title/Gift Deed, survey 120/3-
Khatha, survey 120/3-
RTC, survey 120/4-

How this compares with Bengaluru Rural

20%of Bengaluru Rural projects moved their completion datethis one has not
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep GODREJ FLORENNE PHASE III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

2 kmGODREJ FLORENNE PHASE IIOther 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 9 registered projects within 2 km.

Builder: Godrej Properties Limited

Godrej Properties Limited has 17 registrations on RERA Karnataka, including Godrej Woodland Phase 2 and GODREJ PARKSHIRE. Its filings declare 8 earlier projects, none of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if GODREJ FLORENNE PHASE III is delayed beyond 30 Sep 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of GODREJ FLORENNE PHASE III?

The registered promoter entity is Godrej Properties Limited, a company as per the filing. Its CIN L74120MH1985PLC035308 and GSTIN 29AAACG3995M1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in GODREJ FLORENNE PHASE III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at GODREJ FLORENNE PHASE III?

The professionals named in the filing: Architect: Shreyas M; Engineer: Dinesha Shetty; Chartered Accountant: Bhavesh D Shah. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GODREJ FLORENNE PHASE III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GODREJ FLORENNE PHASE III. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GODREJ FLORENNE PHASE III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.