Home / Browse projects / Bengaluru Urban, Karnataka / Godrej Athena
Godrej Athena
By Godrej Projects Development Limited
RG-KA-40614 · RERA PRM/KA/RERA/1251/446/PR/090123/005605 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Godrej Athena is a Residential/Group Housing project by Godrej Projects Development Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/090123/005605 on 9 Jan 2023. Possession is promised by 14 Jan 2028. 265 of the 330 units on this registration are recorded sold or booked, and 2 of 18 construction stages are filed complete.
At a glance
Project
- NameGodrej Athena
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560093
- Pincode560093
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/090123/005605
- ReraGenie IDRG-KA-40614
Builder
- NameGodrej Projects Development Limited
- Entity typeCompany
- CINU70102MH2010PLC210227
- GSTIN29AAECG0366L1ZC
- Authorized SignatoryPramod Bisht
- Chief Executive OfficerPramod Bisht
- DirectorPramod Bisht
- Project HeadSupreet Chowdhary
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on9 Jan 2023
- Promised completion14 Jan 2028
- Revised completionNone
- Buildings3 building records
- Documents filed112 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 1 | - | - | - | 150 | 0 | 150 |
| Tower 2 | - | - | - | 40 | 0 | 40 |
| Tower 3 | - | - | - | 140 | 0 | 140 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 18 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 97%.
Building: 50% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 80% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 80% |
| Retaining wall (All types) | 85% |
| RCC or MS Framed structure | 97% |
| Masonry Construction | 70% |
| Plastering inside , outside & Ceiling | 61% |
| Joinery: Doors, Windows, Ventilators etc | 53% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 52% |
| Railing and Grill fixing | 57% |
| Electrification, Water supply and Sanitary Finishing | 15% |
| Painting | 25% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 17% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | 0% |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per sanctioned drawings | 5% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 30% |
| Sewage and Drainage System | Yes | 30% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 30% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | 50% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 30% |
| Electricity supply transformer and substation | Yes | 50% |
| Storm water drains | Yes | 20% |
| Use of renewable energy | Yes | 20% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | 20% |
| Gym | No | Not applicable |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 60% |
| Lifts | Yes | 45% |
| Corridor/Lobbies | Yes | 47% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 20% |
| Basement | Yes | 35% |
| Terrace | Yes | 48% |
| Outer Wall | Yes | 50% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | Yes | 0% |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | Yes | 0% |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Godrej Projects Development limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 253.22 cr | Rs 142.73 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 18.90 cr | Rs 10.88 cr |
| Administrative Cost | Rs 13.42 cr | - |
| On-site expenditure-Consultants Fees | Rs 9.01 cr | Rs 48.26 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SHREYAS MADHURANATH |
| Engineer | Yogesh HP |
| Chartered Accountant | BHAVESH D. SHAH |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed112
As listed on the registration, under the names the promoter filed them with; the newest 80 of 112 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/090123/005605 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Godrej Athena Rera Form-4 30-Sep-2026.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect - Godrej Athena - 30-Sep-26.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer - Godrej Athena- 30-Sep-26.pdf | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Godrej Athena RERA Form June-2026.pdf | 10 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect - Godrej Athena - 30-Jun-26.pdf | 10 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer - Godrej Athena- 30-Jun-26.pdf | 10 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 10 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 10 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Godrej Athena RERA Form 4 March-2026.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect - Godrej Athena - 31-Mar-26.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer - Godrej Athena- 31-Mar-26.pdf | 13 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 CA - Godrej Athena - 31-Dec-25.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect - Godrej Athena - 31-Dec-25.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer - Godrej Athena -31-Dec-25.pdf | 12 Jan 2026 |
| P & L 2019-20File: P & L 2019-20.pdf | 4 Jan 2023 |
| P & L 2020-21File: P & L 2020-21.pdf | 4 Jan 2023 |
| P & L 2021-22File: P & L 2021-22.pdf | 4 Jan 2023 |
| CF 2019-20File: CF 2019-20.pdf | 4 Jan 2023 |
| CF 2020-21File: CF 2020-21.pdf | 4 Jan 2023 |
| CF 2021-22File: CF 2021-22.pdf | 4 Jan 2023 |
| BS 2019-20File: BS 2019-20.pdf | 4 Jan 2023 |
| BS 2020-21File: BS FY 2020-21.pdf | 4 Jan 2023 |
| BS 2021-22File: BS FY 2021-22.pdf | 4 Jan 2023 |
| ACK AY 2020-21File: Ack AY 20-21.pdf | 4 Jan 2023 |
| ACK AY 2021-22File: Ack AY 21-22.pdf | 4 Jan 2023 |
| ACK AY 2022-23File: Ack AY 22-23.pdf | 4 Jan 2023 |
| Auditors Report FY 31 March 2020File: Auditors Report FY 31 March 2020.pdf | 4 Jan 2023 |
| Audiotors Report FY March 31 2021File: Audiotors Report FY March 31 2021.pdf | 4 Jan 2023 |
| Auditors Report FY 31 March 2022File: Auditors Report FY 31 March 2022.pdf | 4 Jan 2023 |
| FORM 1File: CA certificate GODREJ ATHENA.PDF | 4 Jan 2023 |
| Cert of IncorporationFile: Cert of Incorp .pdf | 4 Jan 2023 |
| Cert. of Incorporation (Convert to LIMITED) NewFile: Cert of Incorp New.pdf | 4 Jan 2023 |
| Godrej Projects Development Limited - Standalone FS YE 31 Mar 20 | 4 Jan 2023 |
| Godrej Projects Development Pvt Ltd Audit Report and FS 31 March 2022File: Godrej Projects Development Pvt Ltd Audit Report and FS 31 March 2022.pdf | 4 Jan 2023 |
| GPDL signed BS as on March 31 2021File: GPDL signed BS as on March 31 2021.pdf | 4 Jan 2023 |
| PAN - Godrej Projects Development LimitedFile: PAN - Godrej Projects Development Limited.pdf | 4 Jan 2023 |
| RTC 1File: rtc-1988-89 to 1998-99.pdf | 4 Jan 2023 |
| RTC 2File: rtc-2015-2019.pdf | 4 Jan 2023 |
| SALE DEED REGISTEREDFile: SALEDEED-REGISTERED-GPL-Final.pdf | 4 Jan 2023 |
| EC 01042004 to 24022020 - Vibhuthipura - Courtyard(1)File: EC 01042004 to 24022020 - Vibhuthipura - Courtyard(1).pdf | 4 Jan 2023 |
| EC_SA No 6964_18-19_01-04-2014 to 12-08-2018(1)File: EC_SA No 6964_18-19_01-04-2014 to 12-08-2018(1).pdf | 4 Jan 2023 |
| EC_SA No 11537_19-20_13-08-2018 to 12-11-2019(1)File: EC_SA No 11537_19-20_13-08-2018 to 12-11-2019(1).pdf | 4 Jan 2023 |
| Sale CertificateFile: Sale Certificate.pdf | 4 Jan 2023 |
| Sale DeedFile: Sale Deed.pdf | 4 Jan 2023 |
| Sec 3 AffidavitFile: Sec 3 Affidavit.pdf | 4 Jan 2023 |
| Form BFile: Form B.pdf | 4 Jan 2023 |
| Non Litigation AffiidavitFile: Non Litigation Affiidavit.pdf | 4 Jan 2023 |
| Khata Transfer ApplicationFile: Khata Transfer Application.jpeg | 4 Jan 2023 |
| Khata Transfer Application 1File: Khata Transfer Application 2.jpeg | 4 Jan 2023 |
| Khata Transfer Application AcknowledgementFile: Khata Transfer Application_ack.jpeg | 4 Jan 2023 |
| KSPCB /SEIAA NOC ClarificationFile: KSPCB SEIAA CLARIFICATION.jpeg | 4 Jan 2023 |
| KSPCB NOCFile: KSPCB-Vibhuthipura.pdf | 4 Jan 2023 |
| DPFile: VIBHUTIPURA DP.pdf | 4 Jan 2023 |
| Architects certificateFile: Form - 2 Architect's (R1).pdf | 4 Jan 2023 |
| CDP mapFile: CDP.pdf | 4 Jan 2023 |
| Village mapFile: Village Map.pdf | 4 Jan 2023 |
| Site planFile: 01 Site plan.pdf | 4 Jan 2023 |
| Basement planFile: 02 Basement plan.pdf | 4 Jan 2023 |
| Ground floorFile: 03 Ground floor.pdf | 4 Jan 2023 |
| First floorFile: 04 First floor.pdf | 4 Jan 2023 |
| Section ElevationFile: 05 Section Elevation.pdf | 4 Jan 2023 |
| Typical floorFile: 06 Typical floor.pdf | 4 Jan 2023 |
| Terrace floorFile: 07 Terrace floor.pdf | 4 Jan 2023 |
| VIBHUTIPURA - BUILDING LICENSEFile: VIBHUTIPURA - BUILDING LICENSE.pdf | 4 Jan 2023 |
| KSPCB-VibhuthipuraFile: KSPCB-Vibhuthipura.pdf | 4 Jan 2023 |
| Athena - ML & Units R3File: Athena - ML & Units R3.pdf | 4 Jan 2023 |
| Work Order_08-08-2018File: Work Order_08-08-2018.pdf | 4 Jan 2023 |
| VIBHUTIPURA - Building Plan - ApprovalFile: VIBHUTIPURA - Building Plan - Approval copy.pdf | 4 Jan 2023 |
| VIBHUTIPURA - Building Section - ApprovalFile: VIBHUTIPURA - Building Section - Approval copy.pdf | 4 Jan 2023 |
| Relinquishment deed Park Open SpaceFile: Relinquishment deed Park Open Space.pdf | 4 Jan 2023 |
| Engineer CertificateFile: Form - 3 Engineer certificate-Athena.pdf | 4 Jan 2023 |
| Project SpecificationFile: Specifications - Athena.pdf | 4 Jan 2023 |
| AOS AthenaFile: ATHENA_AOS.pdf | 4 Jan 2023 |
| Allotment letterFile: Godrej Athena- Allotment_Letter_Rera.pdf | 4 Jan 2023 |
| RTC, survey Sy.No 124 | - |
| Mutation, survey Sy.No 124 | - |
| Encumbrance Certificate, survey Sy.No 124 | - |
| Conversion/Alienation Order, survey Sy.No 124 | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Godrej Athena on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 3 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Godrej Projects Development Limited
Godrej Projects Development Limited has 1 registration on RERA Karnataka, including Godrej Athena. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Godrej Athena is delayed beyond 14 Jan 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Godrej Athena?
The registered promoter entity is Godrej Projects Development Limited, a company as per the filing. Its CIN U70102MH2010PLC210227 and GSTIN 29AAECG0366L1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Godrej Athena?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Godrej Athena?
The professionals named in the filing: Architect: SHREYAS MADHURANATH; Engineer: Yogesh HP; Chartered Accountant: BHAVESH D. SHAH. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Godrej Athena?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.