Registration approved Residential/Group Housing project

GM NORTH ENCLAVE

By M/s. Allam Infinite India Private Limited

RG-KA-25940 · RERA PRM/KA/RERA/1251/309/PR/190410/002520

Source: official RERA Karnataka filing

Red flags

  • 23 complaints at RERA Karnataka
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • Separate project account declared
Apr 2024Possession promisedmoved 6 months from the original
23Complaints at RERA Karnatakaon this registration
Jump to the 51 documents Report an error

GM NORTH ENCLAVE is a Residential/Group Housing project by M/s. Allam Infinite India Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/190410/002520 on 10 Apr 2019. Possession is promised by 30 Apr 2024. The completion date has moved by 6 months from the original filing. 23 complaints are on record with the regulator.

At a glance

Project

  • NameGM NORTH ENCLAVE
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/309/PR/190410/002520
  • ReraGenie IDRG-KA-25940

Builder

  • NameM/s. Allam Infinite India Private Limited
  • Entity typeCompany
  • CINU70101KA2016PTC095043
  • Authorized SignatorySrinivasa Duggi Venkata Rao
  • Other registrations1 more →

Key dates

this monthRegisteredApr 2019First promiseOct 2023Revised toApr 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on10 Apr 2019
  • Promised completion30 Apr 2024
  • Revised completionRevised to 30 Apr 2024 (originally 31 Oct 2023)
  • Buildings1 building record
  • Documents filed51 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 1---6700670

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etcNot applicable
Plastering inside , outside & CeilingNot applicable
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area15,553 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 203.19 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr.Jayaprakash Narayan
EngineerMr.B.E.Pruthviraja

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionOct 2023 → Apr 2024

No reason recorded in the filing

Complaints filed with RERA Karnataka23

Case no.ComplainantRespondentFiled
CMP/220225/0009053-M/s. Allam Infinite India Private Limited25/02/2022
CMP/220516/0009463-M/s. Allam Infinite India Private Limited16/05/2022
CMP/220525/0009522-M/s. Allam Infinite India Private Limited25/05/2022
CMP/220623/0009662-M/s. Allam Infinite India Private Limited23/06/2022
CMP/220902/0009969-M/s. Allam Infinite India Private Limited02/09/2022
CMP/221230/0010587-M/s. Allam Infinite India Private Limited30/12/2022
00251/2023-M/s. Allam Infinite India Private Limited27/02/2023
00600/2023-M/s. Allam Infinite India Private Limited28/04/2023
00835/2023-M/s. Allam Infinite India Private Limited29/05/2023
00908/2023-M/s. Allam Infinite India Private Limited06/06/2023
00969/2023-M/s. Allam Infinite India Private Limited27/06/2023
01335/2023-M/s. Allam Infinite India Private Limited04/09/2023
01397/2023-M/s. Allam Infinite India Private Limited12/09/2023
01462/2023-M/s. Allam Infinite India Private Limited20/09/2023
01491/2023-M/s. Allam Infinite India Private Limited25/09/2023
01734/2023-M/s. Allam Infinite India Private Limited20/11/2023
00101/2024-M/s. Allam Infinite India Private Limited20/01/2024
00264/2024-M/s. Allam Infinite India Private Limited13/03/2024
00414/2024-M/s. Allam Infinite India Private Limited25/04/2024
00487/2024-M/s. Allam Infinite India Private Limited24/05/2024
00718/2024-M/s. Allam Infinite India Private Limited13/08/2024
01005/2025-M/s. Allam Infinite India Private Limited08/08/2025
00457/2026-M/s. Allam Infinite India Private Limited02/05/2026

Documents filed51

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/190410/002520 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Incorporation Certificate Allam.PDF-
Commencement Certificate-
Combined building plan -
Layout Plan-
Proforma of Sale Deed -GM NORTH ENCLAVE-
Proforma of Sale & Construction Agreement-
Sale deed & RTC-
Section-
Site Plan-
Proforma of Allottment Letter-GM North Enclave-
Brochure-
All NOC's-
Specification-
EC of North Enclave-
Affidavit Sec-3-1-
Affidavit -Declaration-
Katha-
Sale deed & RTC-
Converson order-
Relinquishment Deed-6492-2018-19-
Fire Noc-
AAI-NOC-
BESCOM - NOC-
BWSSB - Acknowldegement-
KSPCB CFE - Acknowldgement-
SEIAA-
Combined entaire plan-
Layout Plans-
07 - Building Plan-ELEVATION & SECTION-
CLU- Change of Land Use-
Balance Sheet 2017 - 2018File: balance sheet.pdf-
Balance Sheet 2016 - 2017File: balance sheet.pdf-
Balance Sheet 2015 - 2016File: balance sheet.pdf-
Audited Profit and Loss Statement 2017 - 2018File: profit & loss.pdf-
Audited Profit and Loss Statement 2016 - 2017File: profit & loss.pdf-
Audited Profit and Loss Statement 2015 - 2016File: profit & loss.pdf-
Director's Report 2017 - 2018File: Director report.pdf-
Director's Report 2016 - 2017File: Director report.pdf-
Director's Report 2015 - 2016File: Director report.pdf-
Cash Flow Statement 2017 - 2018File: cash flow.pdf-
Cash Flow Statement 2016 - 2017File: cash flow.pdf-
Auditor's Report 2017 - 2018File: auditor report.pdf-
Auditor's Report 2016 - 2017File: auditor report.pdf-
Auditor's Report 2015 - 2016File: auditor report.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: IT Retuns.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: IT Retuns.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: IT Retuns.pdf-
Affidavit Form-B-
Prospectus/BrochureFile: 8.GM North Enclave - Brocher Final.pdf-
Advertisement Copy 1File: 9.GM North Enclave _Advertisement.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_309_PR_190410_002520.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 6 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep GM NORTH ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: M/s. Allam Infinite India Private Limited

M/s. Allam Infinite India Private Limited has 2 registrations on RERA Karnataka, including GM AMBITIOUS ENCLAVE and GM NORTH ENCLAVE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if GM NORTH ENCLAVE is delayed beyond 30 Apr 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of GM NORTH ENCLAVE?

The registered promoter entity is M/s. Allam Infinite India Private Limited, a company as per the filing. Its CIN U70101KA2016PTC095043 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in GM NORTH ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GM NORTH ENCLAVE?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at GM NORTH ENCLAVE?

The professionals named in the filing: Architect: Mr.Jayaprakash Narayan; Engineer: Mr.B.E.Pruthviraja. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GM NORTH ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GM NORTH ENCLAVE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GM NORTH ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.