Home / Browse projects / Thane, Maharashtra / Globe Estate - Next
Globe Estate - Next
RG-MH-70226 · RERA P51700046696 · Last updated on MahaRERA portal: 27 Mar 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Globe Estate - Next is a Mixed project by Vijay Paper Product in Thane, Maharashtra, registered with MahaRERA as P51700046696 on 30 Aug 2022. Possession is promised by 31 Dec 2026. 55 of the 112 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameGlobe Estate - Next
- TypeMixed
- Location
- Dombivli Industrial Area
- Phase - 1
- DOMBIVLI
- Kalyan
- Thane
- 421203
- Pincode421203
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700046696
- ReraGenie IDRG-MH-70226
Builder
- NameVijay Paper Product
- Entity typePartnership
- PartnersRajkumar Arjundas Gurwada, Karan Madhav Singh, Gautam Govind Singh, Shakti Balkishan Singh, Rajesh Anantrao Thakare, Ashwin Madhavji Chandan, Madhav Jagmohan Singh, Ashoke Rameshlal Mankani, Ramesh Parmanand Mankani, Aman Madhav Singh, Vijay Arundas Gurwada
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on30 Aug 2022
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed76 files
Current status
Figures as on 27 Mar 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Globe Estate - Next | NA | 4 | 4 | 0 | 112 | 112 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.
Globe Estate - Next: 71% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 27 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 80% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 90% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed35
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rajesh Thakare |
| Engineer | Rajesh Thakare |
| Chartered Accountant | Ankur Sangoi |
| Chartered Accountant | Nikita Vishal Lapasia |
| Partner | Role in project |
|---|---|
| Vijay Paper Product | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Aug 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed76
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: 31 March 2023 Architect Certificate.pdf | 27 Mar 2026 |
| Form 2File: 31 March 2023 Engineer Certificate.pdf | 27 Mar 2026 |
| Form 3File: VPP Form 3 FOR 31 MARCH 2023 signed.pdf | 27 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 31 March 23 sold.pdf | 27 Mar 2026 |
| Form 1File: Architect Certificate VPP 31 dec 2024.pdf | 27 Mar 2026 |
| Form 2File: Engineer Certificate VPP 31 Dec 2024.pdf | 27 Mar 2026 |
| Form 3File: vpp Form 3 December 2024.pdf | 27 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Vijay Paper Product Sold list 31 Dec 2024.pdf | 27 Mar 2026 |
| Form 5 (FY 2022-2023)File: vpp form 5 FY 2023 -24.pdf | 13 Feb 2026 |
| Form 1File: Form1 30-09-2024.pdf | 12 Feb 2026 |
| Form 2File: Form2 30-09-2024.pdf | 12 Feb 2026 |
| Form 3File: Form3 30-09-2024.pdf | 12 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: 30-09-24 sold Booked.pdf | 12 Feb 2026 |
| Form 5 (FY 2024-2025)File: Form 5 - Vijay Paper Product _Signed.pdf | 5 Jan 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-03-2025 vijay paper product architect certificate.pdf | 23 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31-03-2025 vijay paper product engineers certificate.pdf | 23 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vijay Paper Product Form 3 FOR 31 MARCH 2023.pdf | 20 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: vp form 5 FY 2022-23.pdf | 20 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: vpp form 5 FY 2023 -24.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VPP 30 JUNE24.pdf | 19 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VPP 31 DEC 24.pdf | 19 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VPP 30 SEP 2023.pdf | 19 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VPP FORM 1 31mARCH 2024.pdf | 19 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VPP FORM 1 31 DEC 23.pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 2024.pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VPP FORM 3 Final SEPT 24.pdf | 19 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VPP 31 DEC 24.pdf | 19 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: vpp fORM 2 31MARCH 24.pdf | 19 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: VPP FORM 2 DEC 2023.pdf | 19 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: VPP FORM 2 30 SEPT 2023.pdf | 19 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 vPP 30 JUNE24.pdf | 19 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: VPP SOLD INVENTORY 30JUNE24.pdf | 19 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Vijay Paper Product inventory 30 SEPT 2024.pdf | 19 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: VPP INVENTORY SOLD CERTIFICATE 31 DEC24.pdf | 19 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Vijay Paper Product - Form 2A - 31 MARCH 23.pdf | 19 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Vijay Paper Product - Form 2A - 31 MARCH 24.pdf | 19 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Vijay Paper Product 30-09-2024.pdf | 6 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Vijay Paper Product 30-09-2024.pdf | 6 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: VPP INVENTORY SOLD AS ON 31ST MARCH23.pdf | 28 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Vpp discloser of Units 31DEC22.pdf | 12 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 DATED 31DEC 2022.pdf | 4 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 CERTIFICATE 31DEC2022.pdf | 4 Apr 2023 |
| Building plan approvalFile: Building Plan Approval_compressed-1-4.pdf | 3 Aug 2022 |
| Building plan approvalFile: Building Plan Approval_compressed-5.pdf | 3 Aug 2022 |
| Building plan approvalFile: Building Plan Approval_compressed-6-10.pdf | 3 Aug 2022 |
| Details of encumbrances concerned to FinanceFile: Details of non Encumbrance Finance.pdf | 3 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval_compressed-1-4.pdf | 3 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval_compressed-5.pdf | 3 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval_compressed-6-10.pdf | 3 Aug 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200244018576_For_Asset_Based_Search_04_08_2022_19_06_21_534.pdf | 3 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 new merged_final signed_compressed.pdf | 3 Aug 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate Bank Account.pdf | 3 Aug 2022 |
| Deviation Report with respect to Allotment letterFile: Declaration regarding No deviation with respect to allotment letter.pdf | 3 Aug 2022 |
| Deviation Report with respect to model copy of AgreementFile: Declaration regarding No deviation with respect to Model copy of agreement.pdf | 3 Aug 2022 |
| Layout approvalFile: VIJAY PAPER PRODUCT PLAN APPOVED (1)-1.pdf | 2 Aug 2022 |
| Layout approvalFile: VIJAY PAPER PRODUCT PLAN APPOVED (1)-2-3_compressed.pdf | 2 Aug 2022 |
| Layout approvalFile: VIJAY PAPER PRODUCT PLAN APPOVED (1)-4.pdf | 2 Aug 2022 |
| Layout approvalFile: VIJAY PAPER PRODUCT PLAN APPOVED (1)-5 BW_compressed.pdf | 2 Aug 2022 |
| Layout approvalFile: ilovepdf_merged 6-8.pdf | 2 Aug 2022 |
| PAN CardFile: VIJAY PAPER PRODUCTS PAN CARD.pdf | 2 Aug 2022 |
| Copy of the legal title reportFile: Legal title report_compressed.pdf | 2 Aug 2022 |
| Details of encumbrances concerned to LegalFile: Non encumbrance of Legal Final.pdf | 2 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: VIJAY PAPER PRODUCT PLAN APPOVED (1)-1.pdf | 2 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: VIJAY PAPER PRODUCT PLAN APPOVED (1)-2-3_compressed.pdf | 2 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: VIJAY PAPER PRODUCT PLAN APPOVED (1)-4.pdf | 2 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: VIJAY PAPER PRODUCT PLAN APPOVED (1)-5 BW_compressed.pdf | 2 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: ilovepdf_merged 6-8.pdf | 2 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: MIDC DOCUMENTS Commencement Certificate - VIJAY PAPER PRODUCTS_compressed-1-4.pdf | 2 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: MIDC DOCUMENTS Commencement Certificate - VIJAY PAPER PRODUCTS_compressed-5-8.pdf | 2 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: MIDC DOCUMENTS Commencement Certificate - VIJAY PAPER PRODUCTS_compressed-9-10.pdf | 2 Aug 2022 |
| Declaration about Commencement CertificateFile: VIJAY PAPER PRODUCTS FORM D Declaration of CC.pdf | 2 Aug 2022 |
| Declaration in FORM BFile: FORM B_compressed dated.pdf | 2 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT - ENGINEERS CERTIFICATE FOR RERA_compressed.pdf | 2 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE FOR RERA_compressed.pdf | 2 Aug 2022 |
| Proforma of Allotment letterFile: ALLOTTMENT LETTER.pdf | 2 Aug 2022 |
| Proforma of Allotment letterFile: Vijay Paper Product Agreement to Assignment (1).pdf | 2 Aug 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 76 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Globe Estate - Next on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Phase - 17,600+ in Thane
Filed coordinates, straight-line distance. 248 registered projects within 2 km.
REGENCY ANANTAM NXT PHASE I
REGENCY NIRMAN LTD
Crown Dombivli 2
LODHA DEVELOPERS LIMITED
Crown Dombivli 1
LODHA DEVELOPERS LIMITED
Casa Belvedere
LODHA DEVELOPERS LIMITED
Fiora G and H
LODHA DEVELOPERS LIMITED
Regency Luxuria Phase III
REGENCY NIRMAN LTD
See every Thane project, with the district possession charts
Builder: Vijay Paper Product
Vijay Paper Product has 1 registration on MahaRERA, including Globe Estate - Next. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Globe Estate - Next is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Globe Estate - Next?
The registered promoter entity is Vijay Paper Product, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Globe Estate - Next?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Globe Estate - Next?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Globe Estate - Next?
The professionals named in the filing: Architect: Rajesh Thakare; Engineer: Rajesh Thakare; Chartered Accountant: Ankur Sangoi; Chartered Accountant: Nikita Vishal Lapasia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Globe Estate - Next?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback