Home / Browse projects / Thane, Maharashtra / GLOBE COMPASS

Registered No litigation declared Mixed project

GLOBE COMPASS

By GLOBE UNITED

RG-MH-06111 · RERA P51700051985 · Last updated on MahaRERA portal: 5 Mar 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 40%
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

GLOBE COMPASS is a Mixed project by GLOBE UNITED in Thane, Maharashtra, registered with MahaRERA as P51700051985 on 13 Jul 2023. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameGLOBE COMPASS
  • TypeMixed
  • Location
    • MIDC PHASE 1
    • DOMBIVALI INDUSTIAL AREA
    • Asade
    • Kalyan
    • Thane
    • 421203
  • Pincode421203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700051985
  • ReraGenie IDRG-MH-06111

Builder

  • NameGLOBE UNITED
  • Entity typePartnership
  • PartnersASHWIN MADHAVJI CHANDAN, Madhav Jagmohan Singh, Ashoke Rameshlal Mankani, Rameshlal Mankani HUF, SHAKTI BALKISHAN SINGH, AMAN MADHAV SINGH, GAUTAM GOVIND SINGH, GIRISH BABULAL HINGAD, Pritam Babulal Hingad, Rajesh Anantrao Thakare

Key dates

this monthRegisteredJul 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Jul 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GLOBE COMPASSNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 40%.

GLOBE COMPASS: 33% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes80%

Parking filed145

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots145
Closed/Covered75
Open Space70

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,000 sq m
Land owned byThe promoter
Named landownersNone
Declared on5 Sep 2024

Approvals and building plan

Sanctioning authorityMIDC - MAHARASHTRA INDUSTRIAL DEVELOPMENT AUTHORITY
Permissible FSI6000.0
Proposed, not sanctioned1,990 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 15 16 17 , SONAL BUSINESS PARK, NEAR GHARDA CIRCLE, MIDC, DOMBIVALI EAST - 421 203

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJESH THAKARE & ASSOCIATES
EngineerRAJESH A THAKARE
EngineerRAJESH THAKARE & ASSOCIATES
Chartered AccountantANKUR SANGOI & ASSOCIATES
Chartered AccountantNIKITA VISHAL LAPSHIA
PartnerRole in project
GLOBE UNITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Globe United Form 5_Globe Compass_Sign Stamp.pdf5 Mar 2026
Disclosure of sold/ booked inventoryFile: Globe United SOLD inventory MARCH 25.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-03-2025 Globe United architect certificate.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31-03-2025 Globe United Engineers Certificate Form 2.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GLOBE UNITED DEC 24 FORM 3 SIGNED_Final.pdf31 Mar 2025
Disclosure of sold/ booked inventoryFile: Globe United Sold Inventory DEC 24.pdf31 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Globe United Self declaration form 3 30 september 2023.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed Globe United.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 globe united signed sept 2024_compressed.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Globe United - Inventory 30-09-2024.pdf24 Jan 2025
Other - FinanceFile: Globe United Self declaration form 3 31 december 23.pdf24 Jan 2025
Other - FinanceFile: Globe United Slef Declaration Form 3 31 march 2024.pdf24 Jan 2025
Other - FinanceFile: Globe United Self declaration form 3 30 june 2024.pdf24 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Globe United Form 5 FY23-24.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Globe United 30 SEPT 2024.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Globe United 30 SEPT 2024.pdf19 Oct 2024
Form 1File: 30 june 2024 FORM 1.pdf24 Sep 2024
Form 2File: 30june 2024 FORM 2.pdf24 Sep 2024
Disclosure of Sold and Booked InventoryFile: Globe united inventory 30 june 2024.pdf24 Sep 2024
Form 3File: Globe United Form 3 period ending 31May 2024.pdf24 Sep 2024
Form 5 (FY 2023-2024)File: Globe United Form 5 FY23-24.pdf11 Sep 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: globe United Engineer's certificate 31dEC 2023.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GLOBE UNITED Form 1 30 09 2023.pdf4 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: globe United Form 1 for Dec 2023.pdf4 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 for 31st march 2024.pdf4 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: globe United Form 2 30 92023.pdf4 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 for 31 march 2024.pdf4 Aug 2024
Building plan approvalFile: MIDC REVISED APRROVED PLANS.pdf3 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: MIDC REVISED APRROVED PLANS.pdf3 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: MIDC REVISED CC LETTER.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Engineer's Architect Certificate Globe United.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Globe United.pdf3 Aug 2024
Disclosure of sold/ booked inventoryFile: GLOBE UNITED INVENTORY SOLD 31ST MARCH 2024.pdf26 Jul 2024
Disclosure of sold/ booked inventoryFile: GLOBE UNITED INVENTORY SOLD 30TH JUNE2024.pdf26 Jul 2024
Declaration in FORM BFile: form b globe united final.pdf26 Jun 2023
Details of encumbrances concerned to FinanceFile: Globe Compass legal EC.pdf23 Jun 2023
Details of encumbrances concerned to LegalFile: Globe Compass legal EC.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GLOBE COMPASS Arch certificate_compressed.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GLOBE COMPASS Engineer certificate_compressed (1).pdf23 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Globe United Format A_1.pdf21 Jun 2023
Declaration about Commencement CertificateFile: Form D.pdf19 Jun 2023
Building plan approvalFile: GLOBE UNITD PLAN COPY.pdf16 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: GLOBE UNITD PLAN COPY.pdf16 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Globe United Form 3 final signed.pdf16 Jun 2023
Proforma of Agreement for saleFile: GLOBE UNITED DRAFT SALE AGREEMENT.pdf15 Jun 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation Report on model Agreement.pdf15 Jun 2023
Layout approvalFile: GLOBE UNITD PLAN COPY.pdf13 Jun 2023
PAN CardFile: GLOBE UNITED PAN CARD.pdf13 Jun 2023
Copy of the legal title reportFile: Globe United Title Report.pdf13 Jun 2023
Details of encumbrances concerned to FinanceFile: Globe United Encumbrances_1.pdf13 Jun 2023
Details of encumbrances concerned to LegalFile: Globe United Encumbrances_1.pdf13 Jun 2023
Copy of Layout Approval (in case of layout)File: GLOBE UNITD PLAN COPY.pdf13 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: MIDC CC CERTIFICATE.pdf13 Jun 2023
CERSAI detailsFile: CERSAI_Search_Report_200270797146_For_Asset_Based_Search.pdf13 Jun 2023
CERSAI detailsFile: Cresai Undertaking done.pdf13 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Aman Singh.pdf13 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A ASHOKE MANKANI.pdf13 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A ASHWIN CHANDAN.pdf13 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Gautam Singh.pdf13 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Girish Hingad.pdf13 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Karan singh.pdf13 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Rajesh Thakare.pdf13 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Shakti singh.pdf13 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure Madhav singh.pdf13 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure Pritam Hingad.pdf13 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure Ramesh mankani HUF.pdf13 Jun 2023
Proforma of Allotment letterFile: GLOBE UNITED ALLOTMENT LETTER.pdf13 Jun 2023
Deviation Report with respect to Allotment letterFile: No deviation report as per allotment letter.pdf13 Jun 2023

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GLOBE COMPASS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DOMBIVALI INDUSTIAL AREA7,600+ in Thane

2 kmGLOBE COMPASSCompleted 68Lapsed / revoked 47Other 90Dot size: filed unitsN

Filed coordinates, straight-line distance. 205 registered projects within 2 km.

Builder: GLOBE UNITED

GLOBE UNITED has 1 registration on MahaRERA, including GLOBE COMPASS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if GLOBE COMPASS is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GLOBE COMPASS?

The registered promoter entity is GLOBE UNITED, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GLOBE COMPASS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GLOBE COMPASS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GLOBE COMPASS?

The professionals named in the filing: Architect: RAJESH THAKARE & ASSOCIATES; Engineer: RAJESH A THAKARE; Engineer: RAJESH THAKARE & ASSOCIATES; Chartered Accountant: ANKUR SANGOI & ASSOCIATES; Chartered Accountant: NIKITA VISHAL LAPSHIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GLOBE COMPASS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GLOBE COMPASS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GLOBE COMPASS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.