Home / Browse projects / Thane, Maharashtra / GLENMARK

Completed No litigation declared Others project

GLENMARK

By MANDAR CONSTRUCTION (MUKUND BALU KENI HUF)

RG-MH-30158 · RERA P51700030587 · Last updated on MahaRERA portal: 5 Apr 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2022Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 21 documents Report an error

GLENMARK is a Others project by MANDAR CONSTRUCTION (MUKUND BALU KENI HUF) in Thane, Maharashtra, registered with MahaRERA as P51700030587 on 1 Sep 2021. The registration is recorded completed; possession was promised by 31 Mar 2022. 1 complaint is on record with the regulator.

At a glance

Project

  • NameGLENMARK
  • TypeOthers
  • Location
    • CHAHU BHIVA MARG
    • KHAREGAON
    • Thane (M Corp.)
    • Thane
    • 401604
  • Pincode401604
  • RERA no.P51700030587
  • ReraGenie IDRG-MH-30158

Builder

  • NameMANDAR CONSTRUCTION (MUKUND BALU KENI HUF)
  • Entity typeOthers
  • Named personMANDAR MUKUND KENI

Key dates

this monthRegisteredSep 2021PromisedMar 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Sep 2021
  • Promised completion31 Mar 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed21 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GLENMARKNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

GLENMARK: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership8

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area432 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
LandownerVillageDistrict
RAMESH PATILThane (M Corp.)Thane
VISHWAS BHIVA PATILThane (M Corp.)Thane
BHAGIRATI CHAHU PATILThane (M Corp.)Thane
SAINATH CHAHU PATILThane (M Corp.)Thane
BHUSHAN CHAHU PATILThane (M Corp.)Thane
PRATIBHA VISHAL TAREThane (M Corp.)Thane
DHANUBAI BUBERAThane (M Corp.)Thane
SUNITA BHALCHANDRA MHATREThane (M Corp.)Thane

Approvals and building plan

Permissible FSI1012.24
Proposed, not sanctioned1,012 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKISHOR PLAZA SAI BABA NAGAR MUMBAI PUNE ROAD, KALWA WEST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMayuresh keni
EngineerBAHUBALI DHAMNE
Chartered AccountantADITI ATUL JOSHI
PartnerRole in project
MANDAR CONSTRUCTION (MUKUND BALU KENI HUF)-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12400722Dattatraya Shridhar ManjrekarMANDAR CONSTRUCTION (MUKUND BALU KENI HUF)10/11/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jun 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Jul 2022

Documents filed21

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Glenmark Form 4 updated 22 Feb 2023 (1).pdf5 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC - Glenmark.pdf16 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1 31 Dec 2021.pdf27 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate From 1 31 March 2022.pdf27 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate 31 Dec 2021_11zon.pdf27 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate 31 March 2022.pdf27 May 2022
Copy of the legal title reportFile: Title.pdf26 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Certificate.pdf26 Aug 2021
Building plan approvalFile: Building Plan.pdf30 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf30 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: Permission CC.pdf30 Jul 2021
Proforma of Allotment letterFile: Allotment letter.pdf30 Jul 2021
PAN CardFile: pancard.pdf20 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: Plinth Certificate.pdf20 Jul 2021
Declaration about Commencement CertificateFile: FORM-D.pdf19 Jul 2021
Proforma of Allotment letterFile: Draft Agreement.pdf19 Jul 2021
Layout approvalFile: MUINICiple blue plan.pdf24 Jun 2021
Details of encumbrancesFile: ENCUMBRANCE.pdf24 Jun 2021
Copy of Layout Approval (in case of layout)File: MUINICiple blue plan.pdf24 Jun 2021
Declaration in FORM BFile: form b affidavit1.pdf24 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- (FORM-311).pdf24 Jun 2021

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GLENMARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHAREGAON7,600+ in Thane

Builder: MANDAR CONSTRUCTION (MUKUND BALU KENI HUF)

MANDAR CONSTRUCTION (MUKUND BALU KENI HUF) has 1 registration on MahaRERA, including GLENMARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if GLENMARK is delayed beyond 31 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GLENMARK?

The registered promoter entity is MANDAR CONSTRUCTION (MUKUND BALU KENI HUF), an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GLENMARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GLENMARK?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GLENMARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GLENMARK?

The professionals named in the filing: Architect: Mayuresh keni; Engineer: BAHUBALI DHAMNE; Chartered Accountant: ADITI ATUL JOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GLENMARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GLENMARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GLENMARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.