Home / Browse projects / Thane, Maharashtra / GIRIRAJ DARSHAN

Registration lapsed No litigation declared Commercial project

GIRIRAJ DARSHAN

By GIRIRAJ DARSHAN

RG-MH-68313 · RERA P51700050971 · Last updated on MahaRERA portal: 3 Oct 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
6 of 6Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

GIRIRAJ DARSHAN is a Commercial project by GIRIRAJ DARSHAN in Thane, Maharashtra, registered with MahaRERA as P51700050971 on 16 May 2023. Possession was promised by 30 Dec 2024 and is now 22 months past that date. The completion date has moved by 12 months from the original filing. 0 of the 6 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameGIRIRAJ DARSHAN
  • TypeCommercial
  • Location
    • Golivali
    • Dombivali
    • PISAVALI
    • Kalyan
    • Thane
    • 421203
  • Pincode421203
  • RERA no.P51700050971
  • ReraGenie IDRG-MH-68313

Builder

  • NameGIRIRAJ DARSHAN
  • Entity typePartnership
  • GSTIN27AAWFG8603R1ZC
  • PartnersNAYAN CHANDRAKANT SHAH, GAURANG CHANDRAKANT SHAH

Key dates

22 months past promisethis monthRegisteredMay 2023First promiseDec 2023Revised toDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on16 May 2023
  • Promised completion30 Dec 2024
  • Revised completionRevised to 30 Dec 2024 (originally 31 Dec 2023)
  • Buildings1 building record
  • Documents filed62 files

Current status

0%0 of 6 units booked
80.0%Work done, per cost certificate

Figures as on 3 Oct 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1NA60066

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

1: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Closed/Covered4
Open Space52

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area610 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Oct 2024

Approvals and building plan

Permissible FSI1251.18
Proposed, not sanctioned1,251 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchApurva Apartment , Manpada Road , Dombivali East
Estimated costRs 5.50 cr
Cost incurredRs 4.40 cr
Work done80.0%
BuildingWingEstimatedIncurred
1NARs 4.70 crRs 3.76 cr
-NARs 80.00 lakhRs 64.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectG N GANDHE
EngineerRajesh Thakare
Chartered AccountantVijay Prajapati
Chartered AccountantRikta Karia
PartnerRole in project
GIRIRAJ DARSHAN-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700019701Dec 2023 → Dec 2024

Reason as filed by the promoterIt has become difficult for us as builders and developers to complete the project in the declared selling price, as the cost of construction has been increasing day by day. We are going to slow down the pace of the construction work for some time to avoid incurring costs by procurement of raw material with inflated prices as it would be uneconomical. It is understood that a period of 3-6 months will be reasonable enough to settle down the raw material prices and to restore the post war effects.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2023-2024)File: Form 5 Scan.pdf3 Oct 2024
Declaration in FORM BFile: Form B_compressed.pdf6 Jun 2024
Building plan approvalFile: Plan Copy Part 2_compressed.pdf1 Jun 2024
Layout approvalFile: Plan Copy-compressed.pdf1 Jun 2024
Copy of Layout Approval (in case of layout)File: Plan Copy-compressed.pdf1 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan Copy Part 2_compressed.pdf1 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Sanction Letter.pdf1 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A Declaration.pdf1 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Declaration.pdf1 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A Declaration.pdf1 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A Declaration.pdf1 Jun 2024
Disclosure of sold/ booked inventoryFile: Giriraj Darshan_Sold Details.pdf1 Jun 2024
Disclosure of sold/ booked inventoryFile: SOLD Details.pdf1 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 Declaration.pdf1 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Declaration.pdf1 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Declaration.pdf1 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Declaration.pdf1 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Declaration.pdf1 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Declaration.pdf1 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Declaration.pdf1 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form Regulation Architect Certificate.pdf20 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf20 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-Annecxure C.pdf20 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Signed.pdf20 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-06-23 ARCHITECT CERTIFICATE.pdf3 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-09-23 ARCHITECT CERTIFICATE.pdf3 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-23 ARCHITECT CERTIFICATE.pdf3 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 -30-06-2023.pdf3 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -30-09-2023.pdf3 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -31-12-2023.pdf3 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3-30-06-2023 compressed.pdf3 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From-3-30-09-2023_compressed.pdf3 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-31-12-23_compressed.pdf3 Apr 2024
Other - TechnicalFile: form 1giriraj darshan_compressed.pdf3 May 2023
Other - TechnicalFile: Giriraj Darshan Form 2 _compressed.pdf3 May 2023
Other - TechnicalFile: form 3 giriraj darshan_compressed.pdf3 May 2023
Details of encumbrances concerned to FinanceFile: No encumbarnce related to finance.pdf27 Mar 2023
Details of encumbrances concerned to LegalFile: No encumbarnce related to finance.pdf27 Mar 2023
CERSAI detailsFile: Cersai Certificate.pdf27 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed_compressed.pdf27 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Address_compressed.pdf27 Mar 2023
Copy of the legal title reportFile: Legal title Report.pdf21 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Gaurang Shah.pdf21 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Nayan Shah.pdf21 Mar 2023
Proforma of Agreement for saleFile: Sales Agreement_Final.pdf11 Mar 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER RERA.pdf11 Mar 2023
Deviation Report with respect to Allotment letterFile: Deviation Allottment.pdf11 Mar 2023
Deviation Report with respect to model copy of AgreementFile: Devition Report.pdf11 Mar 2023
Building plan approvalFile: scan0106_compressed.pdf18 Feb 2023
Layout approvalFile: Plan Area_compressed.pdf18 Feb 2023
Copy of Layout Approval (in case of layout)File: Plan Area_compressed.pdf18 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: scan0106_compressed.pdf18 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's certificate(1).pdf18 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's certificate form 2.pdf18 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA Account Bank Certificate.pdf14 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate_compressed.pdf11 Feb 2023
Declaration in FORM BFile: Form B.pdf10 Feb 2023
PAN CardFile: PanCard.pdf8 Feb 2023
Details of encumbrances concerned to FinanceFile: No encumbarnce related to finance.pdf8 Feb 2023
Details of encumbrances concerned to LegalFile: No encumbarnce related to finance.pdf8 Feb 2023
Declaration about Commencement CertificateFile: Format D-Declaration about commencemnt certificate.pdf8 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Foramt A- Declaration about separate bank account.pdf8 Feb 2023

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GIRIRAJ DARSHAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dombivali7,600+ in Thane

Builder: GIRIRAJ DARSHAN

GIRIRAJ DARSHAN has 1 registration on MahaRERA, including GIRIRAJ DARSHAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that GIRIRAJ DARSHAN shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if GIRIRAJ DARSHAN is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GIRIRAJ DARSHAN?

The registered promoter entity is GIRIRAJ DARSHAN, a partnership as per the filing. Its GSTIN 27AAWFG8603R1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GIRIRAJ DARSHAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GIRIRAJ DARSHAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GIRIRAJ DARSHAN?

The professionals named in the filing: Architect: G N GANDHE; Engineer: Rajesh Thakare; Chartered Accountant: Vijay Prajapati; Chartered Accountant: Rikta Karia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GIRIRAJ DARSHAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GIRIRAJ DARSHAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GIRIRAJ DARSHAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.