ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / GHATKOPAR PARK VIEW CHS LIMITED

Completed No litigation declared Residential / Group Housing project

GHATKOPAR PARK VIEW CHS LIMITED

By EV AND SARAF REALTY

RG-MH-25645 · RERA P51800014255 · Last updated on MahaRERA portal: 26 Jul 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 61 months
  • 5 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jan 2025Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

GHATKOPAR PARK VIEW CHS LIMITED is a Residential / Group Housing project by EV AND SARAF REALTY in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800014255 on 16 Nov 2017. The registration is recorded completed; possession was promised by 31 Jan 2025. The completion date has moved by 61 months from the original filing.

At a glance

Project

  • NameGHATKOPAR PARK VIEW CHS LIMITED
  • TypeResidential / Group Housing
  • Location
    • KURLA
    • Mumbai Suburban
    • 400077
  • Pincode400077
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800014255
  • ReraGenie IDRG-MH-25645

Builder

  • NameEV AND SARAF REALTY
  • Entity typePartnership
  • PartnersABHIJEET SARAF, ABHIJEET SARAF, VIJAY KUMAR SARAF, VICKY THOMAS ELENJIKAMALIL, THOMAS VARKEY ELENJIKAMALIL

Key dates

this monthRegisteredNov 2017First promiseDec 2019Revised toJan 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 Nov 2017
  • Promised completion31 Jan 2025
  • Revised completionRevised to 31 Jan 2025 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed103 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ghatkopar Park ViewNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Ghatkopar Park View: 86% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 26 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area557 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
GHATKOPAR PARK VIEW CHSKurlaMumbai Suburban
EV & Saraf RealtyNavi Mumbai (M Corp.)Thane

Approvals and building plan

Permissible FSI1505.71
Proposed, not sanctioned501 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVASHI

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDeole Bros
EngineerM/s S V Patel & Associates
PartnerRole in project
EV AND SARAF REALTY-

Extensions applied for5

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800003790Dec 2019 → Dec 2020

Reason as filed by the promoterDue to shortage of sand and raw material the project was not able to get completed on time, we would request you to please grant us extension for a period of one year. We would like to further inform you that we have not sold any flats till date and accordingly processed for the extension.

EXT51800011194Dec 2019 → Dec 2022

Reason as filed by the promoterthe delay is due to the fact that additional top floor is to be constructed for which approval is in process and due to covid the approvals and permissions were delayed

EXT51800013240Dec 2019 → Jun 2023

Reason as filed by the promoterTHE SOCIETY HAS ENTERED INTO SUPPLEMENTARY DA FOR ADDITIONAL 1 FLOOR WITH THE SOCIETY

EXT51800017123Dec 2019 → Jun 2024

Reason as filed by the promoterThe construction of the building is already completed. NOC from collector is pending due to which the application for OC is pending. The same is expected within the next 2-3 months, due to which we are making this application for extension. No units in the project are sold till date.

EXT51800028397Dec 2019 → Jan 2025

Reason as filed by the promoterwe, M/s. Ev And Saraf Realty, hereby declare the following with respect to the project Ghatkopar Park View Chs Limited bearing registration number. P51800014255 registered under MahaRERA. The delay in the completion of the real estate project has been primarily caused by a delay in OC. The project is 100% completed, we received the Occupation Certificate (OC) on 31/01/2025 and we have initiated the process for the possession as well, hence we won't be required to upload consents. To provide assurance and facilitate a smooth completion process, we are closely monitoring the remaining activities

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Sep 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Sep 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Jun 2025

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: 1 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion for26 Jul 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Ghatkopar Park View (2).pdf12 Jun 2025
Certificates of CA (Form 3)File: Form 3dEC 23.pdf5 Jun 2025
Certificates of CA (Form 3)File: Form 3M 24.pdf5 Jun 2025
Certificates of CA (Form 3)File: Form 3J 24.pdf5 Jun 2025
Certificates of CA (Form 3)File: Form 3S 24.pdf5 Jun 2025
Certificates of CA (Form 3)File: Form 3D 24.pdf5 Jun 2025
Certificates of CA (Form 3)File: Form 3M 25.pdf5 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 dec 23.pdf5 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: M 24.pdf5 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: J 24.pdf5 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: S 24.pdf5 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: D 24.pdf5 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: J 25.pdf5 Jun 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Park View.pdf5 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- 22-23.pdf5 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5- 23-24.pdf5 Jun 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (3).pdf6 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 3 Certificates of CA (Form 5) (1).pdf5 May 2025
Declaration in FORM BFile: Park View Form B (Affidavit cum Declaration)_organized.pdf3 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Park View Form 2A March 2020.pdf3 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Park View Form 5 FY 18-19.pdf3 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Park View Form 5 FY 19-20.pdf3 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Park View Form 5 FY 20-21.pdf3 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Park View Form 2A March 2021.pdf3 May 2025
Declaration about Commencement CertificateFile: Park View Format D.pdf3 May 2025
CERSAI detailsFile: Park View Declaration of CERSAI.pdf3 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Park View Format A.pdf3 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Park View Form 5 FY 21-22.pdf3 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Park View Form 2A March 2022.pdf3 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Park View Form 2A March 2023.pdf3 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Park View Form 2A March 2024.pdf3 May 2025
Declaration in FORM BFile: Form B With Notary.pdf11 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf11 Dec 2023
Disclosure of sold/ booked inventoryFile: Format B.pdf11 Dec 2023
Declaration in FORM BFile: Form B.pdf9 Dec 2023
Declaration in FORM BFile: Format - B.pdf2 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SKMBT_C280 23100709451.pdf2 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SKMBT_C280 23100709460.pdf2 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA CERTIFICATE 30092023.pdf2 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA CERTIFICATE 31032023.pdf2 Dec 2023
Certificates of CA (Form 3)File: march 23_compressed.pdf2 Dec 2023
Certificates of CA (Form 3)File: june 23_compressed.pdf2 Dec 2023
Certificates of CA (Form 3)File: sept 2023_compressed.pdf2 Dec 2023
Certificates of CA (Form 5)File: Annexure F - Form 5 Rera.pdf2 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA CERTIFICATE 30092023.pdf1 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA CERTIFICATE 31032023.pdf1 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA CERTIFICATE 30062023.pdf1 Dec 2023
Declaration in FORM BFile: Form B.pdf6 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf6 Feb 2023
Disclosure of sold/ booked inventoryFile: Sales booked inv.pdf6 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf4 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2022.pdf3 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: From 2 June 2022.pdf3 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sept 2022.pdf3 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SKMBT_March 2022 form 1.pdf30 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SKMBT_June 2022 form 1.pdf30 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SKMBT_Sept 2022 form 1.pdf30 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: march 2020 2A.pdf8 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: March 2021 2A_compressed.pdf8 Feb 2022
Declaration about Commencement CertificateFile: Format D.pdf7 Feb 2022
CERSAI detailsFile: CERSAI.pdf7 Feb 2022
Disclosure of sold/ booked inventoryFile: Sold inventory details.pdf7 Feb 2022
Declaration about Commencement CertificateFile: 2274609_FurtherCC_signed.pdf5 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 MArch 2020.pdf5 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 March 2021.pdf5 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf1 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf1 Sep 2021
Certificates of CA (Form 3)File: FROM 3 SCAN_compressed (1).pdf20 Nov 2020
Certificates of CA (Form 3)File: ev saraf form 3 31-3-2020_compressed.pdf19 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: fORM 1 16102020_opt.pdf16 Oct 2020
Layout approvalFile: Complete CC.pdf9 Sep 2020
Layout approvalFile: CC1.pdf9 Sep 2020
Layout approvalFile: CC2.pdf9 Sep 2020
Layout approvalFile: CC4.pdf9 Sep 2020
Copy of Layout Approval (in case of layout)File: Complete CC.pdf9 Sep 2020
Copy of Layout Approval (in case of layout)File: CC1.pdf9 Sep 2020
Copy of Layout Approval (in case of layout)File: CC2.pdf9 Sep 2020
Copy of Layout Approval (in case of layout)File: CC4.pdf9 Sep 2020
Commencement Certificates / NA Order for plotted developmentFile: New-CC-11th-Floor.pdf17 Feb 2020

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 61 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GHATKOPAR PARK VIEW CHS LIMITED on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KURLA6,700+ in Mumbai Suburban

2 kmGHATKOPAR PARK VIEW CHS Completed 133Lapsed / revoked 105Other 142Dot size: filed unitsN

Filed coordinates, straight-line distance. 380 registered projects within 2 km.

Builder: EV AND SARAF REALTY

EV AND SARAF REALTY has 1 registration on MahaRERA, including GHATKOPAR PARK VIEW CHS LIMITED. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if GHATKOPAR PARK VIEW CHS LIMITED is delayed beyond 31 Jan 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GHATKOPAR PARK VIEW CHS LIMITED?

The registered promoter entity is EV AND SARAF REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GHATKOPAR PARK VIEW CHS LIMITED?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GHATKOPAR PARK VIEW CHS LIMITED?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GHATKOPAR PARK VIEW CHS LIMITED?

The professionals named in the filing: Architect: Deole Bros; Engineer: M/s S V Patel & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GHATKOPAR PARK VIEW CHS LIMITED?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GHATKOPAR PARK VIEW CHS LIMITED. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GHATKOPAR PARK VIEW CHS LIMITED to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.