Registration lapsed No litigation declared Residential / Group Housing project

GARODIA NAGAR MAHAVIR DHAM CHS LTD

By GARODIA NAGAR MAHAVIR DHAM CHS LTD

RG-MH-05219 · RERA P51800052562 · Last updated on MahaRERA portal: 31 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
6 of 11Construction stages donefurthest along: Staircases, 90%
2Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

GARODIA NAGAR MAHAVIR DHAM CHS LTD is a Residential / Group Housing project by GARODIA NAGAR MAHAVIR DHAM CHS LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052562 on 11 Sep 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 2 complaints are on record with the regulator.

At a glance

Project

  • NameGARODIA NAGAR MAHAVIR DHAM CHS LTD
  • TypeResidential / Group Housing
  • Location
    • GARODIA NAGAR
    • GHATKOPAR EAST
    • Kirol
    • Kurla
    • Mumbai Suburban
    • 400077
  • Pincode400077
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800052562
  • ReraGenie IDRG-MH-05219

Builder

  • NameGARODIA NAGAR MAHAVIR DHAM CHS LTD
  • Entity typeSociety
  • ChairpersonSHARMISHTA JITENDRA PARIKH
  • SecretoryVINAYAK DINKAR KHOT

Key dates

10 months past promisethis monthRegisteredSep 2023PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on11 Sep 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAHAVIR DHAMNA1914000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

MAHAVIR DHAM: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.45%

Progress on shared amenities15

As on 31 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes60%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed107

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots107
Closed/Covered107

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,839 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 May 2026

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI4201.52
Proposed, not sanctioned4,202 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGARODIA NAGAR GHATKOPAR EAST MUMBAI 400077

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYASH RAJESH AGARWAL
EngineerNAVANATH AIWALE
EngineerHiren Shah
EngineerRAJENDRA P BHANKAR
Chartered AccountantHARSH DEDHIA
PartnerRole in project
GARODIA NAGAR MAHAVIR DHAM CHS LTD-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12400729yash Rajesh AgarwalGARODIA NAGAR MAHAVIR DHAM CHS LTD11/11/2024
CC12500763Yagnesh Nilesh ShahGARODIA NAGAR MAHAVIR DHAM CHS LTD06/03/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FROM 1 - 30-06-2025.pdf31 Jul 2025
Form 2File: FORM 2 - 30-06-2025.pdf31 Jul 2025
Form 3File: FORM 3 - 30-06-2025.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold inventory - 30-06-2025.pdf31 Jul 2025
Disclosure of sold/ booked inventoryFile: JUNE 2024.pdf28 Apr 2025
Disclosure of sold/ booked inventoryFile: SEPT 2024.pdf28 Apr 2025
Disclosure of sold/ booked inventoryFile: DEC 2024.pdf28 Apr 2025
Disclosure of sold/ booked inventoryFile: MARCH 2025.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Q4 2014-25.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Q4 2024-25.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Q4 2024-25.pdf21 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MARCH 2024.pdf20 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JUNE 2024.pdf20 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SEPTEMBER 2024.pdf20 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DECEMBER 2024.pdf20 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MARCH 2024.pdf20 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JUNE 2024.pdf20 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SEPTEMBER 2024.pdf20 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DECEMBER 2024.pdf20 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MARCH 2024.pdf20 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JUNE 2024.pdf20 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEPTEMBER 2024.pdf20 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DECEMBER 2024.pdf20 Mar 2025
Layout approvalFile: HIGH LIGHTED 1.pdf12 Mar 2024
Building plan approvalFile: Amended Plan Approval Letter.pdf12 Mar 2024
Building plan approvalFile: 2.pdf12 Mar 2024
Building plan approvalFile: 3.pdf12 Mar 2024
Building plan approvalFile: 4.pdf12 Mar 2024
Building plan approvalFile: 5.pdf12 Mar 2024
Building plan approvalFile: 6.pdf12 Mar 2024
Building plan approvalFile: 7.pdf12 Mar 2024
Building plan approvalFile: 8.pdf12 Mar 2024
Building plan approvalFile: 9.pdf12 Mar 2024
Copy of Layout Approval (in case of layout)File: HIGH LIGHTED 1.pdf12 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended Plan Approval Letter.pdf12 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf12 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf12 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf12 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf12 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf12 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf12 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf12 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf12 Mar 2024
Declaration about Commencement CertificateFile: CC Declaration.pdf12 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Certificate.pdf12 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: 2410503_FurtherCC_signed_Full till 14 fl.pdf11 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf11 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf11 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf11 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH.pdf8 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL CA-1-6_merged (1)_compressed.pdf6 Sep 2023
Building plan approvalFile: plan today_6-end.pdf12 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: plan today_6-end.pdf12 Aug 2023
Building plan approvalFile: plan today_2-3.pdf9 Aug 2023
Building plan approvalFile: plan today_4-5.pdf9 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: plan today_2-3.pdf9 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: plan today_4-5.pdf9 Aug 2023
Building plan approvalFile: 2288277_IOD_signed.pdf29 May 2023
Building Plan Approval / NA Order for plotted developmentFile: 2288277_IOD_signed.pdf29 May 2023
Copy of the legal title reportFile: Legal Title Report Mahavirdham (1).pdf22 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Interest In Other Real Estate Organizations .pdf22 May 2023
Proforma of Agreement for saleFile: RERA SALE AGREEMENT.pdf22 May 2023
CERSAI detailsFile: DocScanner 11 May 2023 1-14 pm.pdf11 May 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance Certificate Concerned To Legal.pdf28 Apr 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance Certificate Concerned to finance .pdf28 Apr 2023
Details of encumbrances concerned to LegalFile: No Encumbrance Certificate Concerned To Legal.pdf28 Apr 2023
Details of encumbrances concerned to LegalFile: No Encumbrance Certificate Concerned to finance .pdf28 Apr 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf28 Apr 2023
Declaration about Commencement CertificateFile: CC DECL.pdf24 Apr 2023
Layout approvalFile: plan today_1-1.pdf21 Apr 2023
PAN CardFile: Mahavir Dham PAN Card.pdf21 Apr 2023
Copy of Layout Approval (in case of layout)File: plan today_1-1.pdf21 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: FurtherCC_signed.pdf21 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK ACCOUNT DETAILS.pdf21 Apr 2023
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT ALLOTMENT.pdf21 Apr 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT AFS.pdf21 Apr 2023
Declaration in FORM BFile: Mahavirdham affidavit cum declaration .pdf10 Apr 2023
CERSAI detailsFile: Asset Based Search.pdf10 Apr 2023

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GARODIA NAGAR MAHAVIR DHAM CHS LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GHATKOPAR EAST6,700+ in Mumbai Suburban

2 kmGARODIA NAGAR MAHAVIR DHCompleted 132Lapsed / revoked 97Other 130Dot size: filed unitsN

Filed coordinates, straight-line distance. 359 registered projects within 2 km.

Builder: GARODIA NAGAR MAHAVIR DHAM CHS LTD

GARODIA NAGAR MAHAVIR DHAM CHS LTD has 1 registration on MahaRERA, including GARODIA NAGAR MAHAVIR DHAM CHS LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that GARODIA NAGAR MAHAVIR DHAM CHS LTD shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if GARODIA NAGAR MAHAVIR DHAM CHS LTD is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GARODIA NAGAR MAHAVIR DHAM CHS LTD?

The registered promoter entity is GARODIA NAGAR MAHAVIR DHAM CHS LTD, a society as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GARODIA NAGAR MAHAVIR DHAM CHS LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GARODIA NAGAR MAHAVIR DHAM CHS LTD?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GARODIA NAGAR MAHAVIR DHAM CHS LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GARODIA NAGAR MAHAVIR DHAM CHS LTD?

The professionals named in the filing: Architect: YASH RAJESH AGARWAL; Engineer: NAVANATH AIWALE; Engineer: Hiren Shah; Engineer: RAJENDRA P BHANKAR; Chartered Accountant: HARSH DEDHIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GARODIA NAGAR MAHAVIR DHAM CHS LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GARODIA NAGAR MAHAVIR DHAM CHS LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GARODIA NAGAR MAHAVIR DHAM CHS LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.