GANESH RESIDENCY

By SHREE VENKATESHWARA DEVELOPERS

RG-MH-03394 · RERA P51800021114 · Last updated on MahaRERA portal: 25 Apr 2025

Source: official MahaRERA filing

Red flags

  • Possession 3 months past the filed date
  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2026Possession promised3 months past this date
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 92%
35 of 38Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 123 documents Report an error

GANESH RESIDENCY is a Residential / Group Housing project by SHREE VENKATESHWARA DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800021114 on 31 May 2019. Possession was promised by 25 Jul 2026 and is now 3 months past that date. The completion date has moved by 36 months from the original filing. 3 of the 38 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameGANESH RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • KIROL OFF. TILAK ROAD
    • GHATKOPAR EAST
    • Kurla
    • Mumbai Suburban
    • 400077
  • Pincode400077
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800021114
  • ReraGenie IDRG-MH-03394

Builder

  • NameSHREE VENKATESHWARA DEVELOPERS
  • Entity typePartnership
  • PartnersCHITTOR KRISHNAIYER KALYANARAMAN, SHEETAL VENKATESH
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1

Key dates

3 months past promisethis monthRegisteredMay 2019First promiseJul 2023Revised toJul 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 May 2019
  • Promised completion25 Jul 2026
  • Revised completionRevised to 25 Jul 2026 (originally 25 Jul 2023)
  • Buildings1 building record
  • Documents filed123 files

Current status

8%3 of 38 units booked

Figures as on 25 Apr 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GANESH RESIDENCYNA161338038

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 92%.

GANESH RESIDENCY: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)60%
Plinth100%
Stilt Floor100%
Slabs of Super Structure92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises44%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed41

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots41
Open Space41

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area847 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Mar 2026

Approvals and building plan

Sanctioning authorityBRIHANMUMBAI MUNICIPAL CORPORATION
Permissible FSI835.3
Proposed, not sanctioned835 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSTATION ROAD, CHEMBUR BRANCH, MUMBAI - 400 071

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShri Raj Consultants
EngineerVishal Raghwani
Chartered AccountantSHASHANK R JAIN AND ASSOCIATES
Chartered AccountantParas Paras Thakkar
PartnerRole in project
SHREE VENKATESHWARA DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800017773Jul 2023 → Jul 2026

Reason as filed by the promoter. We were going through the tough phase as DHFL NBFC bank has stopped Financing and all our planning came to hold in 2021 and we were not having funds to complete the project. Then we somehow manage to Settle DHFL in June 2022 and Took the project ahead with alternate funding and Selling inventory. Now from last 6 months we have again Started the project with Contractor on Long Credit basis and now we think we will be able to complete the project in next 15 months if everything goes as per the plan.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 May 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed123

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Form 3 Final.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rera Form 2 - Shree Venkateshwara - 31032025 - With sign.pdf25 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold 31032025.pdf25 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold 25042025.pdf25 Apr 2025
Certificates of CA (Form 3)File: Form 3 31032025.pdf19 Apr 2025
Certificates of CA (Form 3)File: Form 3 31032025.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 18 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: 20 Disclosure of sold_ booked inventory.pdf19 Apr 2025
Other - TechnicalFile: CPM.pdf19 Apr 2025
Certificates of CA (Form 3)File: Form 3 31122024.pdf9 Apr 2025
Certificates of CA (Form 3)File: Form 3 31122024.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shree Venkateshwara -Dec 2024 sign.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shree Venkateshwara -Dec 2024 sign.pdf9 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Ganesh Residency 23 uploaded.pdf9 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Ganesh Residency 24 uploaded.pdf9 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Form 1 - Shree Venkateshwara - 31032025 Scan.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory 31122021.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory 27032025.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory 31122024.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory 30092024.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory 30062024.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory 31032024.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory 31122023.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory 30092023.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory 30062023.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory 31032023.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory 31122022.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory 30092022.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory 30062022.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory 31032022.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory 30092021.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory 30062021.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory 31032021.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory 31032020.pdf2 Apr 2025
Other - TechnicalFile: Pert.pdf2 Apr 2025
Declaration in FORM BFile: Form B.pdf1 Apr 2025
Certificates of CA (Form 3)File: Form 3 31122024.pdf1 Apr 2025
Certificates of CA (Form 3)File: Form 3 30092024.pdf1 Apr 2025
Certificates of CA (Form 3)File: Form 3 30062024.pdf1 Apr 2025
Certificates of CA (Form 3)File: Form 3 31032024.pdf1 Apr 2025
Certificates of CA (Form 3)File: Form 3 31122023.pdf1 Apr 2025
Certificates of CA (Form 3)File: Form 3 30092023.pdf1 Apr 2025
Certificates of CA (Form 3)File: Form 3 30062023.pdf1 Apr 2025
Certificates of CA (Form 3)File: Form 3 31032023.pdf1 Apr 2025
Certificates of CA (Form 3)File: Form 3 31122022.pdf1 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Form 1 - Shree Venkateshwara - 31032023 Scan.pdf29 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Form 1 - Shree Venkateshwara - 30062023 Scan.pdf29 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Form 1 - Shree Venkateshwara - 30092023 Scan.pdf29 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Form 1 - Shree Venkateshwara - 31122023 Scan.pdf29 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Form 1 - Shree Venkateshwara - 31122023 Scan.pdf29 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Form 1 - Shree Venkateshwara - 31032024 Scan.pdf29 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Form 1 - Shree Venkateshwara - 30062024 Scan.pdf29 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Form 1 - Shree Venkateshwara - 30092024 Scan.pdf29 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Form 1 - Shree Venkateshwara - 31122024 Scan.pdf29 Mar 2025
PAN CardFile: Pancard.pdf28 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shree Venkateshwara - Jun 2023 Sign.pdf28 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shree Venkateshwara -Dec 2024 sign.pdf28 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shree Venkateshwara -Sep 2024 sign.pdf28 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shree Venkateshwara - Jun 2024 sign.pdf28 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shree Venkateshwara -March 2024 sign.pdf28 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shree Venkateshwara - Dec 2023 Sign.pdf28 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shree Venkateshwara - Sep 2023 Sign.pdf28 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shree Venkateshwara - Jun 2023 Sign.pdf28 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shree Venkateshwara - March 2023 Sign.pdf28 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shree Venkateshwara - Dec 2022 Sign.pdf28 Mar 2025
CERSAI detailsFile: Cersai Declaration-merged.pdf28 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other project- Venkatesh.pdf28 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other project- SHEETAL.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Ganesh Residency March23.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Ganesh Residency March24.pdf28 Mar 2025
Building plan approvalFile: Drawing-1-2.pdf12 Sep 2023
Building plan approvalFile: Drawing-3.pdf12 Sep 2023
Building Plan Approval (IOD)File: Drawing-1-2.pdf12 Sep 2023
Building Plan Approval (IOD)File: Drawing-3.pdf12 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FY 2019-20 - Form 5.pdf8 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FY 2020-21 - Form 5.pdf8 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FY 2021-22 - Form-5 Signed Copy_compressed.pdf8 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 30112022 Signed Copy.pdf7 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 30112022 Signed Copy.pdf7 Dec 2022
Certificates of CA (Form 3)File: Form-3 30112022 Signed Copy_Compressed.pdf7 Dec 2022

How this compares with Mumbai Suburban

8%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 36 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GANESH RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GHATKOPAR EAST6,700+ in Mumbai Suburban

2 kmGANESH RESIDENCYCompleted 43Lapsed / revoked 14Other 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 73 registered projects within 2 km.

Builder: SHREE VENKATESHWARA DEVELOPERS

SHREE VENKATESHWARA DEVELOPERS has 2 registrations on MahaRERA, including GANESH RESIDENCY and VENKATESHWARA HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if GANESH RESIDENCY is delayed beyond 25 Jul 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GANESH RESIDENCY?

The registered promoter entity is SHREE VENKATESHWARA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GANESH RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GANESH RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GANESH RESIDENCY?

The professionals named in the filing: Architect: Shri Raj Consultants; Engineer: Vishal Raghwani; Chartered Accountant: SHASHANK R JAIN AND ASSOCIATES; Chartered Accountant: Paras Paras Thakkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GANESH RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GANESH RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GANESH RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.