Gami Erica
RG-MH-06021 · RERA P51700052930 · Last updated on MahaRERA portal: 20 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 1 case
- Completion date moved by 12 months
- 1 extension taken
Clear
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Gami Erica is a Others project by Lal Gebi Infra Co. in Thane, Maharashtra, registered with MahaRERA as P51700052930 on 5 Oct 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 35 of the 76 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameGami Erica
- TypeOthers
- Location
- CTS NO- 1003
- Shahbaz- Belapur
- Navi Mumbai (M Corp.)
- Thane
- 400614
- Pincode400614
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700052930
- ReraGenie IDRG-MH-06021
Builder
- NameLal Gebi Infra Co.
- Entity typePartnership
- PartnersAshesh Savji Gami, Komal Balkrishna Bandre
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Oct 2023
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed86 files
Current status
Figures as on 20 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Gami Erica | NA | 9 | 8 | 70 | 6 | 76 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.
Gami Erica: 85% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 20 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed92
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership7
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Madhuri Narayan Mone | Navi Mumbai (M Corp.) | Thane |
| Ramesh Narayan Mone | Navi Mumbai (M Corp.) | Thane |
| Bhargav Yashwant Mone | Navi Mumbai (M Corp.) | Thane |
| Varsha Yashwant Mone | Navi Mumbai (M Corp.) | Thane |
| Shantaram Anant Mone | Navi Mumbai (M Corp.) | Thane |
| Prabhakar Anant Mone | Navi Mumbai (M Corp.) | Thane |
| Madhav Kashinath Mone | Navi Mumbai (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Gami Erica | NA | Rs 17.79 cr | Rs 16.67 cr |
| - | NA | Rs 36.30 lakh | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Edge Architects |
| Engineer | SK Consultants & Engineers |
| Chartered Accountant | Rutuja Narsingh & Associates |
| Chartered Accountant | NB Sayed & Associates |
| Partner | Role in project |
|---|---|
| Lal Gebi Infra Co. | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project has been delayed due to the non-receipt of the Occupancy Certificate (OC). The application for the Occupancy Certificate has already been duly submitted and approval is still pending owing to administrative delays at their end. As the flat in question has already been sold, its registration is required to be completed. However, in the absence of the Occupancy Certificate, the registration process cannot be carried out. In view of the above circumstances, which are beyond our control, we are constrained to seek an extension of time for registration of the said flat until the Occupan
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 52/2023 | Additional District Court Belapur | Say Hearing on Exh Ready |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Apr 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed86
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Gami Erica as on 30-06-2026.pdf | 20 Aug 2026 |
| Withdrawal Update Form 2File: Gami_Erica_Form2_Q1_2026-27_20-07-2026_06-23.pdf | 20 Aug 2026 |
| Withdrawal Update Form 3File: Gami_Erica_Form3_Q1_2026-27_19-07-2026_07-23_doc1.pdf | 20 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 Gami Erica as on 30-06-2026.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: Gami_Erica_Form2_Q1_2026-27_20-07-2026_06-23.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: Gami_Erica_Form3_Q1_2026-27_19-07-2026_07-23_doc1.pdf | 20 Jul 2026 |
| Withdrawal Update Form 1File: Architect Certificate (Form No 1) Gami Erica.pdf | 15 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 of Gami Erica as on 31-03-2026.pdf | 15 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 of Gami Erica as on 31-03-2026.pdf | 15 Apr 2026 |
| Form 5 (FY 2023-2024)File: Signed Form 5 Gami Erica-Lal Gebi Infra Co FY 2023-24.pdf | 9 Feb 2026 |
| Form 5 (FY 2024-2025)File: Form 5 Gami Erica-Lal Gebi Infra Co FY 2024-25.pdf | 9 Feb 2026 |
| Form 1File: Form 1 - Gami Erica as on Dec 2025.pdf | 19 Jan 2026 |
| Form 2File: Form 2 - Gami Erica as on Dec 2025.pdf | 19 Jan 2026 |
| Form 3File: Form 3 - Gami Erica as on Dec 2025.pdf | 19 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Gami Erica as on Dec 2025.pdf | 19 Jan 2026 |
| Form 1File: Form 1 - Gami Erica as on Sept 2025.pdf | 20 Oct 2025 |
| Form 2File: Form 2 - Gami Erica as on Sept 2025.pdf | 20 Oct 2025 |
| Form 3File: Form 3 - Gami Erica as on Sept 2025.pdf | 20 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Gami Erica as on Sept 2025.pdf | 20 Oct 2025 |
| Form 1File: Form 1-Gami Erica as on June 2025.pdf | 17 Jul 2025 |
| Form 2File: Form 2 - Gami Erica as on June 2025.pdf | 17 Jul 2025 |
| Form 3File: Form 3 - Gami Erica as on June 2025.pdf | 17 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Gami Erica as on June 2025.pdf | 17 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Gami Erica as on March 2025.pdf | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Gami Erica as on 31-03-2025.pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gami Erica as on March 2025.pdf | 16 Apr 2025 |
| Layout approvalFile: Plan 1.pdf | 15 Apr 2025 |
| Building plan approvalFile: Plan 2.pdf | 15 Apr 2025 |
| Building plan approvalFile: Plan 3.pdf | 15 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Plan 1.pdf | 15 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf | 15 Apr 2025 |
| Layout approvalFile: Plan 1.pdf | 25 Feb 2025 |
| Building plan approvalFile: Plan 2.pdf | 25 Feb 2025 |
| Building plan approvalFile: Plan 3.pdf | 25 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: Plan 1.pdf | 25 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 25 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf | 25 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf | 25 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Gami Erica as on Dec 2024.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Gami Erica as on 31-12-2024.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gami Erica as on December 2024.pdf | 13 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: CIRCULAR 29 Gami Erica as on Sep 2024.pdf | 2 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Gami Erica as on Sept 2024 Sign.pdf | 26 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Gami Erica as on Sept 2024.pdf | 17 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gami Erica as on Sept 2024.pdf | 17 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Signed Form 5 Gami Erica-Lal Gebi Infra Co FY 2023-24 1 (2).pdf | 14 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Gami Erica-Lal Gebi Infra Co FY 2023-24 1.pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gami Erica as on June 2024.pdf | 11 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Gami Erica as on June 2024.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Gami Erica as on June 2024.pdf | 6 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: CIRCULAR 29 Gami Erica as on March 2024.pdf | 15 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gami Erica as on March 2024.pdf | 12 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Gami Erica as on March 2024.pdf | 12 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Gami Erica as on March 2024.pdf | 6 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gami Erica as on Dec 2023.pdf | 17 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Gami Erica as on 31-12-2023.pdf | 17 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Gami Erica as on Dec 2023.pdf | 16 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Verification- Gami Erica.pdf | 6 Sep 2023 |
| Other - TechnicalFile: CC Verification- Gami Erica.pdf | 6 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER- Litigation (1) (1) (1)_organized.pdf | 27 Jul 2023 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER- Litigation (1) (1) (1)_organized.pdf | 27 Jul 2023 |
| Declaration in FORM BFile: FORM -B (Promoter).pdf | 7 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised First Form 3 of Gami Erica.pdf | 6 Jul 2023 |
| Copy of the legal title reportFile: Short Title - Gami erica_11zon.pdf | 4 Jul 2023 |
| Proforma of Agreement for saleFile: AFS.pdf | 4 Jul 2023 |
| Proforma of Allotment letterFile: AL.pdf | 4 Jul 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Seperate Bank Account Details (1).pdf | 29 Jun 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report of Model AL.pdf | 28 Jun 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report of Model AFS.pdf | 28 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: No ENCUMBRANCE LETTER -Dues.pdf | 19 Jun 2023 |
| Details of encumbrances concerned to LegalFile: No ENCUMBRANCE LETTER -Dues.pdf | 19 Jun 2023 |
| Declaration about Commencement CertificateFile: FORMAT D - For Single Building.pdf | 19 Jun 2023 |
| CERSAI detailsFile: DECLARATION of Cersai.pdf | 19 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: output.pdf | 19 Jun 2023 |
| Layout approvalFile: CC- Plan- Page 1_11zon (1).pdf | 2 Jun 2023 |
| Building plan approvalFile: CC- Plan- Page 1_11zon (1).pdf | 2 Jun 2023 |
| Building plan approvalFile: 2,3plan (1)_11zon.pdf | 2 Jun 2023 |
| Building plan approvalFile: 4_11zon_rotated.pdf | 2 Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 86 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Gami Erica on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Shahbaz- Belapur7,600+ in Thane
Filed coordinates, straight-line distance. 58 registered projects within 2 km.
REGENCY SQUARE
REGENCY INFRABUILD LLP
NMS MIDAS
DHARTI DHAN REALTY
AAKAR CELESTIAL
Aakar Infratech
PRIYANKA AVENUE
PRIYANKA REGENCY LLP
AAKAR 88
Aakar Signature Co.
VIVA COMPLEX
PURAB ESTATES PVT. LTD.
See every Thane project, with the district possession charts
Builder: Lal Gebi Infra Co.
Lal Gebi Infra Co. has 1 registration on MahaRERA, including Gami Erica. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Gami Erica is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Gami Erica?
The registered promoter entity is Lal Gebi Infra Co., a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Gami Erica?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Gami Erica?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Gami Erica?
The professionals named in the filing: Architect: Edge Architects; Engineer: SK Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Gami Erica?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback