Gami Erica

By Lal Gebi Infra Co.

RG-MH-06021 · RERA P51700052930 · Last updated on MahaRERA portal: 20 Aug 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
8 of 11Construction stages donefurthest along: Installation of Lifts, 90%
41 of 76Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

Gami Erica is a Others project by Lal Gebi Infra Co. in Thane, Maharashtra, registered with MahaRERA as P51700052930 on 5 Oct 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 35 of the 76 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameGami Erica
  • TypeOthers
  • Location
    • CTS NO- 1003
    • Shahbaz- Belapur
    • Navi Mumbai (M Corp.)
    • Thane
    • 400614
  • Pincode400614
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700052930
  • ReraGenie IDRG-MH-06021

Builder

  • NameLal Gebi Infra Co.
  • Entity typePartnership
  • PartnersAshesh Savji Gami, Komal Balkrishna Bandre

Key dates

this monthRegisteredOct 2023First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed86 files

Current status

46%35 of 76 units booked
91.9%Work done, per cost certificate

Figures as on 20 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Gami EricaNA9870676

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.

Gami Erica: 85% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 20 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed92

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots92
Closed/Covered80
Open Space12

Land and ownership7

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,235 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Jul 2025
LandownerVillageDistrict
Madhuri Narayan MoneNavi Mumbai (M Corp.)Thane
Ramesh Narayan MoneNavi Mumbai (M Corp.)Thane
Bhargav Yashwant MoneNavi Mumbai (M Corp.)Thane
Varsha Yashwant MoneNavi Mumbai (M Corp.)Thane
Shantaram Anant MoneNavi Mumbai (M Corp.)Thane
Prabhakar Anant MoneNavi Mumbai (M Corp.)Thane
Madhav Kashinath MoneNavi Mumbai (M Corp.)Thane

Approvals and building plan

Sanctioning authorityNavi Mumbai Municipal Coproration
Permissible FSI3972.06
Proposed, not sanctioned3,972 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Heremes Center Sector 17, Palm Beach Road, Vashi- 400703
Estimated costRs 18.15 cr
Cost incurredRs 16.67 cr
Work done91.87%
BuildingWingEstimatedIncurred
Gami EricaNARs 17.79 crRs 16.67 cr
-NARs 36.30 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEdge Architects
EngineerSK Consultants & Engineers
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantNB Sayed & Associates
PartnerRole in project
Lal Gebi Infra Co.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA10022619783Dec 2025 → Dec 2026

Reason as filed by the promoterThe project has been delayed due to the non-receipt of the Occupancy Certificate (OC). The application for the Occupancy Certificate has already been duly submitted and approval is still pending owing to administrative delays at their end. As the flat in question has already been sold, its registration is required to be completed. However, in the absence of the Occupancy Certificate, the registration process cannot be carried out. In view of the above circumstances, which are beyond our control, we are constrained to seek an extension of time for registration of the said flat until the Occupan

Litigation declared1

CaseCourtStatus
52/2023Additional District Court BelapurSay Hearing on Exh Ready

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Gami Erica as on 30-06-2026.pdf20 Aug 2026
Withdrawal Update Form 2File: Gami_Erica_Form2_Q1_2026-27_20-07-2026_06-23.pdf20 Aug 2026
Withdrawal Update Form 3File: Gami_Erica_Form3_Q1_2026-27_19-07-2026_07-23_doc1.pdf20 Aug 2026
Withdrawal Update Form 1File: Form 1 Gami Erica as on 30-06-2026.pdf20 Jul 2026
Withdrawal Update Form 2File: Gami_Erica_Form2_Q1_2026-27_20-07-2026_06-23.pdf20 Jul 2026
Withdrawal Update Form 3File: Gami_Erica_Form3_Q1_2026-27_19-07-2026_07-23_doc1.pdf20 Jul 2026
Withdrawal Update Form 1File: Architect Certificate (Form No 1) Gami Erica.pdf15 Apr 2026
Withdrawal Update Form 2File: Form 2 of Gami Erica as on 31-03-2026.pdf15 Apr 2026
Withdrawal Update Form 3File: Form 3 of Gami Erica as on 31-03-2026.pdf15 Apr 2026
Form 5 (FY 2023-2024)File: Signed Form 5 Gami Erica-Lal Gebi Infra Co FY 2023-24.pdf9 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 Gami Erica-Lal Gebi Infra Co FY 2024-25.pdf9 Feb 2026
Form 1File: Form 1 - Gami Erica as on Dec 2025.pdf19 Jan 2026
Form 2File: Form 2 - Gami Erica as on Dec 2025.pdf19 Jan 2026
Form 3File: Form 3 - Gami Erica as on Dec 2025.pdf19 Jan 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Gami Erica as on Dec 2025.pdf19 Jan 2026
Form 1File: Form 1 - Gami Erica as on Sept 2025.pdf20 Oct 2025
Form 2File: Form 2 - Gami Erica as on Sept 2025.pdf20 Oct 2025
Form 3File: Form 3 - Gami Erica as on Sept 2025.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Gami Erica as on Sept 2025.pdf20 Oct 2025
Form 1File: Form 1-Gami Erica as on June 2025.pdf17 Jul 2025
Form 2File: Form 2 - Gami Erica as on June 2025.pdf17 Jul 2025
Form 3File: Form 3 - Gami Erica as on June 2025.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Gami Erica as on June 2025.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Gami Erica as on March 2025.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Gami Erica as on 31-03-2025.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gami Erica as on March 2025.pdf16 Apr 2025
Layout approvalFile: Plan 1.pdf15 Apr 2025
Building plan approvalFile: Plan 2.pdf15 Apr 2025
Building plan approvalFile: Plan 3.pdf15 Apr 2025
Copy of Layout Approval (in case of layout)File: Plan 1.pdf15 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf15 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf15 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf15 Apr 2025
Layout approvalFile: Plan 1.pdf25 Feb 2025
Building plan approvalFile: Plan 2.pdf25 Feb 2025
Building plan approvalFile: Plan 3.pdf25 Feb 2025
Copy of Layout Approval (in case of layout)File: Plan 1.pdf25 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf25 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf25 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Gami Erica as on Dec 2024.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Gami Erica as on 31-12-2024.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gami Erica as on December 2024.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 Gami Erica as on Sep 2024.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Gami Erica as on Sept 2024 Sign.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Gami Erica as on Sept 2024.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gami Erica as on Sept 2024.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Signed Form 5 Gami Erica-Lal Gebi Infra Co FY 2023-24 1 (2).pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Gami Erica-Lal Gebi Infra Co FY 2023-24 1.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gami Erica as on June 2024.pdf11 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Gami Erica as on June 2024.pdf11 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Gami Erica as on June 2024.pdf6 Jul 2024
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 Gami Erica as on March 2024.pdf15 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gami Erica as on March 2024.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Gami Erica as on March 2024.pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Gami Erica as on March 2024.pdf6 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gami Erica as on Dec 2023.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Gami Erica as on 31-12-2023.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Gami Erica as on Dec 2023.pdf16 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Verification- Gami Erica.pdf6 Sep 2023
Other - TechnicalFile: CC Verification- Gami Erica.pdf6 Sep 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER- Litigation (1) (1) (1)_organized.pdf27 Jul 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER- Litigation (1) (1) (1)_organized.pdf27 Jul 2023
Declaration in FORM BFile: FORM -B (Promoter).pdf7 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised First Form 3 of Gami Erica.pdf6 Jul 2023
Copy of the legal title reportFile: Short Title - Gami erica_11zon.pdf4 Jul 2023
Proforma of Agreement for saleFile: AFS.pdf4 Jul 2023
Proforma of Allotment letterFile: AL.pdf4 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Seperate Bank Account Details (1).pdf29 Jun 2023
Deviation Report with respect to Allotment letterFile: Deviation Report of Model AL.pdf28 Jun 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report of Model AFS.pdf28 Jun 2023
Details of encumbrances concerned to FinanceFile: No ENCUMBRANCE LETTER -Dues.pdf19 Jun 2023
Details of encumbrances concerned to LegalFile: No ENCUMBRANCE LETTER -Dues.pdf19 Jun 2023
Declaration about Commencement CertificateFile: FORMAT D - For Single Building.pdf19 Jun 2023
CERSAI detailsFile: DECLARATION of Cersai.pdf19 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: output.pdf19 Jun 2023
Layout approvalFile: CC- Plan- Page 1_11zon (1).pdf2 Jun 2023
Building plan approvalFile: CC- Plan- Page 1_11zon (1).pdf2 Jun 2023
Building plan approvalFile: 2,3plan (1)_11zon.pdf2 Jun 2023
Building plan approvalFile: 4_11zon_rotated.pdf2 Jun 2023

How this compares with Thane

46%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Gami Erica on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shahbaz- Belapur7,600+ in Thane

2 kmGami EricaCompleted 18Lapsed / revoked 7Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 58 registered projects within 2 km.

Builder: Lal Gebi Infra Co.

Lal Gebi Infra Co. has 1 registration on MahaRERA, including Gami Erica. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Gami Erica is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Gami Erica?

The registered promoter entity is Lal Gebi Infra Co., a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Gami Erica?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Gami Erica?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Gami Erica?

The professionals named in the filing: Architect: Edge Architects; Engineer: SK Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Gami Erica?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Gami Erica. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Gami Erica to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.