Red flags
- 2 complaints at RERA Karnataka
- Completion date moved by 9 months
- 1 extension taken
Clear
- Separate project account declared
Saved.
Gallium at Brigade El Dorado is a Residential/Group Housing project by Brigade Tetrarch Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/472/PR/190427/002540 on 27 Apr 2019. Possession is promised by 30 Sep 2024. The completion date has moved by 9 months from the original filing. 2 complaints are on record with the regulator.
At a glance
Project
- NameGallium at Brigade El Dorado
- TypeResidential/Group Housing
- Location
- Yelahanka
- Bengaluru Urban
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/472/PR/190427/002540
- ReraGenie IDRG-KA-86557
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on27 Apr 2019
- Promised completion30 Sep 2024
- Revised completionRevised to 30 Sep 2024 (originally 31 Dec 2023)
- Buildings1 building record
- Documents filed97 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Gallium at Brigade El Dorado | - | - | - | 499 | 0 | 499 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | Not applicable |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | Not applicable |
| Plastering inside , outside & Ceiling | Not applicable |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Painting | - |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | No | Not applicable |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | - |
| Solid waste management and disposal | Yes | - |
| Water conservation | No | Not applicable |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Storm water drains | Yes | - |
| Use of renewable energy | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Gas | Yes | - |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | Yes | - |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | No | Not applicable |
| Open parking areas and common storage spaces | Yes | - |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | - |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Complaints filed with RERA Karnataka2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CMP/191111/0004685 | - | Brigade Tetrarch Private Limited | 11/11/2019 |
| CMP/220209/0008995 | - | Brigade Tetrarch Private Limited | 09/02/2022 |
Documents filed97
As listed on the registration, under the names the promoter filed them with; the newest 80 of 97 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/472/PR/190427/002540 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CertificateFile: 2 Certificate of Incorporation BTPL pdf_compressed.pdf | - |
| Already registered project ongoing detailsFile: List of Ongoing Registered Projects.xlsx | - |
| Modified plan details site plan, floor plans, Plan Licence LetterFile: Brigade El Dorado - Revision Certificate.pdf | - |
| Elevation, Sections, Specifications ( If changes are there )File: Tower G - Section & Elevation.pdf | - |
| List Of AllotteesFile: List of Allottess - Gallium.pdf | - |
| Consent LetterFile: BG-EGA-G-X-0011-XX-CN.pdf | - |
| Chartered Accountant CertificateFile: Gallium - Form 4_compressed.pdf | - |
| Notarized AffidavitFile: Gallium - Affidavit.pdf | - |
| Engineer CertificateFile: Gallium - Form 6.pdf | - |
| Architect CertificateFile: Gallium - Form 5.PDF | - |
| Structural Engineer Certificate for stability of structureFile: Stability Certificate - Gallium.jpg | - |
| Modification of Plan DetailsFile: Gallium at El Dorado - Site plan.pdf | - |
| Modification of Plan DetailsFile: Site Plan.pdf | - |
| Modification of Plan DetailsFile: Commencement Certificat.pdf | - |
| Modification of Plan DetailsFile: Commencement Certificat.pdf | - |
| Modification of Plan DetailsFile: Gallium - Sold & Unsold Details - Old.pdf | - |
| Modification of Plan DetailsFile: Gallium - Sold & Unsold Details - New_compressed.pdf | - |
| Document 1File: AAI NOC.pdf | - |
| Site PlanFile: Site Plan.pdf | - |
| Area StatementFile: Area Statement.pdf | - |
| Basement Floor PlanFile: Tower G Basement Floor Plan.pdf | - |
| Ground Floor PlanFile: Tower G Ground Floor Plan.pdf | - |
| 1st Floor PlanFile: Tower G First Floor Plan.pdf | - |
| 2nd Floor PlanFile: Tower G Second Floor Plan.pdf | - |
| 3rd & 4th Floor PlanFile: Tower G Third and Fourth Floor Plan.pdf | - |
| 5th Floor PlanFile: Tower G Fifth Floor Plan.pdf | - |
| 6th to 11th Floor PlanFile: Tower G 6th to 11th Typical Floor Plan.pdf | - |
| 12th & 13th Floor PlanFile: Tower G 12th & 13th Typical Floor Plan.pdf | - |
| 14th to 19th & 21st Floor PlanFile: Tower G 14th to 19th Typical and 21st Floor Plan.pdf | - |
| 20th Floor PlanFile: Tower G 20th Floor Plan (Refuge area Plan).pdf | - |
| ElevationFile: Tower G Elevation.pdf | - |
| SectionFile: Tower G Section.pdf | - |
| Terrace Floor PlanFile: Tower G Terrace Floor Plan.pdf | - |
| Consent Letter - Part 1File: Consent Letters - Part 1.pdf | - |
| Consent Letter - Part 2File: Consent Letters - Part 2.pdf | - |
| Consent Letter - Part 3File: Consent Letters - Part 3.pdf | - |
| Consent Letter - Part 4File: Consent Letters - Part 4.pdf | - |
| Consent Letter - Part 5File: Consent Letters - Part 5.pdf | - |
| Reason for Modification of PlanFile: Gallium - Reason for Modification.pdf | - |
| Gallium at Brigade El Dorado - Plan Sanction | - |
| Gallium at El Dorado - Site plan | - |
| Awaiting Sale Deed Draft | - |
| Pro forma Sale Agreement - Gallium at El Dorado | - |
| Original Lease cum Sale Agreement dt 02-03-2019 | - |
| Gallium at Brigade El Dorado - Section and Elevation plan | - |
| Gallium at El Dorado - Site plan | - |
| Gallium at Brigade El Dorado | - |
| Gallium at Brigade El Dorado Brochure | - |
| El Dorado Gallium Specifications | - |
| EC from 01-04-2004 to 26-03-2019 | - |
| Affidavit for Sec 3(1) Gallium at El Dorado | - |
| JD cum declaration- El Dorado | - |
| Combined PC - R5 & R8 | - |
| Original Lease cum Sale Agreement dt 02-03-2019 | - |
| Fire NOC - Brigade Tetrarch | - |
| AAI Clearance for R8 | - |
| SEIAA - EL Dorado | - |
| Gallium at El Dorado - Site plan | - |
| Gallium at Brigade El Dorado - Section Elevation and Specifications | - |
| Combined PC - R5 & R8 | - |
| Balance Sheet 2017 - 2018File: Balance Sheet 2017-18.pdf | - |
| Balance Sheet 2016 - 2017File: Balance Sheet 2016-17.pdf | - |
| Balance Sheet 2015 - 2016File: Balance Sheet 2015-16.pdf | - |
| Audited Profit and Loss Statement 2017 - 2018File: P & L 2017-18.pdf | - |
| Audited Profit and Loss Statement 2016 - 2017File: P & L 2016-17.pdf | - |
| Audited Profit and Loss Statement 2015 - 2016File: P & L 2015-16.pdf | - |
| Director's Report 2017 - 2018File: Directors Report 2017-18.pdf | - |
| Director's Report 2016 - 2017File: Directors Report 2016-17.pdf | - |
| Director's Report 2015 - 2016File: Directors Report 2015-16.pdf | - |
| Cash Flow Statement 2017 - 2018File: Cash Flow 2017-18.pdf | - |
| Cash Flow Statement 2016 - 2017File: Cash Flow 2016-17.pdf | - |
| Auditor's Report 2017 - 2018File: Auditors Report 2017-18.pdf | - |
| Auditor's Report 2016 - 2017File: Auditors Report 2016-17.pdf | - |
| Auditor's Report 2015 - 2016File: Auditors Report 2015-16.pdf | - |
| Income Tax Return Acknowledgement 2017 - 2018File: ITR 17-18.pdf | - |
| Income Tax Return Acknowledgement 2016 - 2017File: ITR 16-17.pdf | - |
| Income Tax Return Acknowledgement 2015 - 2016File: ITR 15-16.pdf | - |
| Affidavit Form B Gallium at Brigade El Dorado | - |
| Prospectus/BrochureFile: Gallium At Brigade El-Dorado Brochure_15Apr19.pdf | - |
| Tower Excel SheetFile: PRMKARERA1251472PR190427002540 (2) 1.xlsx | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Gallium at Brigade El Dorado on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 23 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Brigade Tetrarch Private Limited
Brigade Tetrarch Private Limited has 10 registrations on RERA Karnataka, including Jasper and Iridium at Brigade El Dorado and Aurum at Brigade El Dorado. Its filings declare 4 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Gallium at Brigade El Dorado is delayed beyond 30 Sep 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Gallium at Brigade El Dorado?
The registered promoter entity is Brigade Tetrarch Private Limited, a company as per the filing. Its CIN U92412KA1995PTC018247 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Gallium at Brigade El Dorado?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Gallium at Brigade El Dorado?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
What should I check before booking in Gallium at Brigade El Dorado?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback