Home / Browse projects / Raigarh, Maharashtra / GALAXY PRIME MURUD

Completed No litigation declared Others project

GALAXY PRIME MURUD

By KHALID KHALIL AHMED SHAIKH

RG-MH-51472 · RERA P52000017624 · Last updated on MahaRERA portal: 5 Jun 2024

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jan 2021Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

GALAXY PRIME MURUD is a Others project by KHALID KHALIL AHMED SHAIKH in Raigarh, Maharashtra, registered with MahaRERA as P52000017624 on 29 Aug 2018. The registration is recorded completed; possession was promised by 2 Jan 2021.

At a glance

Project

  • NameGALAXY PRIME MURUD
  • TypeOthers
  • Location
    • BHOGESHWAR L N
    • MURUD
    • Murud Janjira (M Cl)
    • Raigarh
    • 402401
  • Pincode402401
  • RERA no.P52000017624
  • ReraGenie IDRG-MH-51472

Builder

  • NameKHALID KHALIL AHMED SHAIKH
  • Entity typeIndividual

Key dates

this monthRegisteredAug 2018PromisedJan 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Aug 2018
  • Promised completion2 Jan 2021
  • Revised completionNone
  • Buildings1 building record
  • Documents filed72 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GALAXY PRIME MURUDNA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

GALAXY PRIME MURUD: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area248 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI431.81
Proposed, not sanctioned432 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 1 2 3 4 , GROUND FLOOR SWAPNA SHILP MUMBAI PUNE ROAD KALWA THANE -400605

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVILAS AGHARKAR
EngineerVILAS AGHARKAR
Chartered AccountantUmang Dedia & Co
PartnerRole in project
KHALID KHALIL AHMED SHAIKH-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000022928Jan 2021 → Dec 2024

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 100% allottees for purpose of extension of RERA registration period of the said project

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Aug 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Aug 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Aug 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Jun 2024

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Form B.pdf5 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 2019.pdf5 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 2020.pdf5 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 2021.pdf5 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 December 2021.pdf5 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 2022.pdf5 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 2022.pdf5 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 September 2022.pdf5 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 December 2022.pdf5 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 2023.pdf5 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 2023.pdf5 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 September 2023.pdf5 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 December 2023.pdf5 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 2024.pdf5 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2019.pdf5 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2020.pdf5 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Macrh 2021.pdf5 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 December 2021.pdf5 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2022.pdf5 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 2022.pdf5 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 September 2022.pdf5 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 December 2022.pdf5 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2023.pdf5 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 2023.pdf5 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 September 2023.pdf5 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 December 2023.pdf5 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Macrh 2024.pdf5 Jun 2024
Certificates of CA (Form 3)File: Form 3 March 2019_7_11zon.pdf5 Jun 2024
Certificates of CA (Form 3)File: Form 3 Macrh 2020_6_11zon.pdf5 Jun 2024
Certificates of CA (Form 3)File: Form 3 March 2021_8_11zon.pdf5 Jun 2024
Certificates of CA (Form 3)File: Form 3 December 2021_1_11zon.pdf5 Jun 2024
Certificates of CA (Form 3)File: Form 3 March 2022_9_11zon.pdf5 Jun 2024
Certificates of CA (Form 3)File: Form 3 June 2022_4_11zon.pdf5 Jun 2024
Certificates of CA (Form 3)File: Form 3 September 2022_12_11zon.pdf5 Jun 2024
Certificates of CA (Form 3)File: Form 3 December 2022_2_11zon.pdf5 Jun 2024
Certificates of CA (Form 3)File: Form 3 March 2023_10_11zon.pdf5 Jun 2024
Certificates of CA (Form 3)File: Form 3 June 2023_5_11zon.pdf5 Jun 2024
Certificates of CA (Form 3)File: Form 3 September 2023_13_11zon.pdf5 Jun 2024
Certificates of CA (Form 3)File: Form 3 December 2023_3_11zon.pdf5 Jun 2024
Certificates of CA (Form 3)File: Form 3 March 2024_11_11zon.pdf5 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DIN Khalid.pdf5 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY 2018-2019.pdf5 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 2019-2020.pdf5 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2020-2021.pdf5 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-2022.pdf5 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-2023.pdf5 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2022-2023.pdf5 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf5 Jun 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf5 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf5 Jun 2024
Declaration about Commencement CertificateFile: Format D.pdf4 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A FY 2019-20.pdf4 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A FY 2020-21.pdf4 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A FY 2021-22.pdf4 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 2022-23.pdf4 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 2023-24.pdf4 Jun 2024
Disclosure of sold/ booked inventoryFile: Circular 29.pdf4 Jun 2024
CERSAI detailsFile: CERSAI.pdf4 Jun 2024
Building plan approvalFile: BUILDING PLAN AND LAYOUT PLAN.pdf25 Aug 2018
Layout approvalFile: BUILDING PLAN AND LAYOUT PLAN.pdf25 Aug 2018
PAN CardFile: PAN CARD.pdf25 Aug 2018
Copy of the legal title reportFile: TITLE SEARCH REPORT.pdf25 Aug 2018
Details of encumbrancesFile: TITLE SEARCH REPORT.pdf25 Aug 2018
Copy of Layout Approval (in case of layout)File: BUILDING PLAN AND LAYOUT PLAN.pdf25 Aug 2018
Building Plan Approval (IOD)File: BUILDING PLAN AND LAYOUT PLAN.pdf25 Aug 2018
Commencement Certificates / NA Order for plotted developmentFile: construction permission.pdf25 Aug 2018
Declaration in FORM BFile: FORM B.pdf25 Aug 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTF.pdf25 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf25 Aug 2018
Certificates of CA (Form 3)File: FORM3.pdf25 Aug 2018
Proforma of Allotment letterFile: PROFORMA OF AGREMMENT FOR SALE.pdf25 Aug 2018
OtherFile: FINANCIALS OF LAST 3 YEARS.pdf25 Aug 2018

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GALAXY PRIME MURUD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MURUD5,900+ in Raigarh

Builder: KHALID KHALIL AHMED SHAIKH

KHALID KHALIL AHMED SHAIKH has 1 registration on MahaRERA, including GALAXY PRIME MURUD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if GALAXY PRIME MURUD is delayed beyond 2 Jan 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GALAXY PRIME MURUD?

The registered promoter entity is KHALID KHALIL AHMED SHAIKH, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GALAXY PRIME MURUD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GALAXY PRIME MURUD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GALAXY PRIME MURUD?

The professionals named in the filing: Architect: VILAS AGHARKAR; Engineer: VILAS AGHARKAR; Chartered Accountant: Umang Dedia & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GALAXY PRIME MURUD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GALAXY PRIME MURUD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GALAXY PRIME MURUD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.