Registration lapsed No litigation declared Others project

GAJANAN MARVEL

By SAICHHATRA

RG-MH-45369 · RERA P52300030445 · Last updated on MahaRERA portal: 4 Aug 2021

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 29 months past the filed date
  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Beed registration emailed to you, free during the pilot beta.
May 2024Possession promised29 months past this date
8 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 40%
1Complaints at MahaRERAon this registration
Jump to the 13 documents Report an error

GAJANAN MARVEL is a Others project by SAICHHATRA in Beed, Maharashtra, registered with MahaRERA as P52300030445 on 25 Aug 2021. Possession was promised by 23 May 2024 and is now 29 months past that date. 1 complaint is on record with the regulator.

At a glance

Project

  • NameGAJANAN MARVEL
  • TypeOthers
  • Location
    • BEED ROAD
    • TARAF GIRAM
    • Bid (M Cl)
    • Beed
    • 431122
  • Pincode431122
  • RERA no.P52300030445
  • ReraGenie IDRG-MH-45369

Builder

  • NameSAICHHATRA
  • Entity typePartnership
  • PartnersEKNATH ASARAM ZATE, AMOL PRATAPRAO KADAM, MAHENDRA RAMNATH GADHE

Key dates

29 months past promisethis monthRegisteredAug 2021PromisedMay 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on25 Aug 2021
  • Promised completion23 May 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed13 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA40000
BUILDING BNA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 4 Aug 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 40%.

BUILDING A44%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B44%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Aug 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,326 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
PRINA SHARAD BAGMARBid (M Cl)Beed
PRATIBHA ABHNANDAN KANKARIYABid (M Cl)Beed
PRITESH MANIKCHAND KHIWANSARABid (M Cl)Beed
GIRIDHARILAL RAMCHANDRA CHANDAKMurud Bk.Latur
SURESH BANSILAL KOTECHABid (M Cl)Beed
MILAN MANSUKHLAL LALWANIBid (M Cl)Beed

Approvals and building plan

Permissible FSI1318.58
Proposed, not sanctioned1,319 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNAGAR ROAD BEED

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLONKAR & ASSOCIATES
EngineerSAI NIRMAAN CONSTRUCTION
Chartered AccountantKAPVALT & CO
PartnerRole in project
SAICHHATRA-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12500039Mrinal KatkarSAICHHATRA28/02/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Jun 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jun 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed13

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement Certificates / NA Order for plotted developmentFile: Commenment Certificate.pdf4 Aug 2021
Copy of the legal title reportFile: Format A.pdf31 Jul 2021
Declaration about Commencement CertificateFile: Format D _ Declaration.PDF23 Jun 2021
Layout approvalFile: Approved Layout_compressed.pdf3 Jun 2021
Building plan approvalFile: Building Plan.pdf3 Jun 2021
PAN CardFile: All PANs_compressed.pdf3 Jun 2021
Details of encumbrancesFile: Encumbrance Certificate.PDF3 Jun 2021
Copy of Layout Approval (in case of layout)File: Approved Layout_compressed.pdf3 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf3 Jun 2021
Declaration in FORM BFile: Developer Affitavit (Form B)_compressed.pdf3 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certiicate (Form 3).PDF3 Jun 2021
Proforma of Allotment letterFile: Format of ATS_compressed.pdf3 Jun 2021
Proforma of Allotment letterFile: Allotment Letter.pdf3 Jun 2021

How this compares with Beed

5%of Beed projects moved their completion datethis one has not
73%of Beed registrations have lapsed or been cancelledthis one is among them

Computed across the 95 Beed projects on ReraGenie, from their own filings.

Keep GAJANAN MARVEL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TARAF GIRAM95 in Beed

Builder: SAICHHATRA

SAICHHATRA has 1 registration on MahaRERA, including GAJANAN MARVEL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Beed district page.

Frequently asked questions

What does it mean that GAJANAN MARVEL shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if GAJANAN MARVEL is delayed beyond 23 May 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GAJANAN MARVEL?

The registered promoter entity is SAICHHATRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GAJANAN MARVEL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GAJANAN MARVEL?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GAJANAN MARVEL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GAJANAN MARVEL?

The professionals named in the filing: Architect: LONKAR & ASSOCIATES; Engineer: SAI NIRMAAN CONSTRUCTION; Chartered Accountant: KAPVALT & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GAJANAN MARVEL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GAJANAN MARVEL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GAJANAN MARVEL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.