Home / Browse projects / Thane, Maharashtra / Foresta & Fiora
Foresta & Fiora
By Palava Dwellers Private Limited
RG-MH-90618 · RERA P51700017506 · Last updated on MahaRERA portal: 18 Oct 2024
Source: official MahaRERA filing
Red flags
- De-registered
- Possession 38 months past the filed date
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Foresta & Fiora is a Residential / Group Housing project by Palava Dwellers Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700017506 on 23 Aug 2018. Possession was promised by 28 Aug 2023 and is now 38 months past that date. 1 complaint is on record with the regulator.
At a glance
Project
- NameForesta & Fiora
- TypeResidential / Group Housing
- Location
- Kalyan-Shilphata Road
- Dombivali
- Mangaon
- Kalyan
- Thane
- 421203
- Pincode421203
- RERA no.P51700017506
- ReraGenie IDRG-MH-90618
Builder
- NamePalava Dwellers Private Limited
- Entity typeCompany
- CINL45200MH1995PLC093041
- GSTIN27AAACL1490J1ZG
- ChairpersonsPIYUSH VORA, PIYUSH VORA, PIYUSH VORA
- WtdsRaunika Malhotra, Rajendra Narpatmal Lodha
- Other registrations54 more →
- Completed51 of 55
- No longer live3 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusDe-registered
- Registered on23 Aug 2018
- Promised completion28 Aug 2023
- Revised completionNone
- Buildings7 building records
- Documents filed131 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Foresta A | NA | 0 | 0 | 0 | 0 | 0 |
| Foresta H | NA | 0 | 0 | 0 | 0 | 0 |
| Foresta C | NA | 0 | 0 | 0 | 0 | 0 |
| Foresta G | NA | 0 | 0 | 0 | 0 | 0 |
| Fiora A | NA | 0 | 0 | 0 | 0 | 0 |
| Fiora B | NA | 0 | 0 | 0 | 0 | 0 |
| Foresta B | NA | 0 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 18 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Excavation, at 0%.
Foresta A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Foresta H0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Foresta C0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Foresta G0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Fiora A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Fiora B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Foresta B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities19
As on 18 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| ClubHouse | No | Not applicable |
| GURUDWARA | No | Not applicable |
| Lakeside Park | No | Not applicable |
| Sports Complex | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VILAS DESAI & ASSOCIATES |
| Engineer | K C SHAH CONSULTANTS |
| Chartered Accountant | B B JAIN & ASSOCIATES |
| Chartered Accountant | MSKA & ASSOCIATES |
| Chartered Accountant | Chirag Sarvaiya & Co |
| Partner | Role in project |
|---|---|
| Lodha Developers Limited | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 586/2016/2016 | Civil Court JD Kalyan | Hearing of order seven rule eleven application |
| 284/15/2015 | Civil Judge SD Kalyan | We have filed say ws alomh with Ehob gay |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000397988 | Vijay Ramachandran Bhaskara | Lodha Group | 15/11/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Nov 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Aug 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Nov 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed131
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 131 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P51700017506 - Foresta Fiora.pdf | 18 Oct 2024 |
| Other - LegalFile: 1 Other - Legal (7).pdf | 30 Jul 2024 |
| Other - LegalFile: 2 Other - Legal (4).pdf | 30 Jul 2024 |
| Other - LegalFile: 3 Other - Legal (1).pdf | 30 Jul 2024 |
| Other - TechnicalFile: Authorized Signatory 13102023.pdf | 26 Jul 2024 |
| Other - TechnicalFile: Revised Delegation of Authority for RERA.pdf | 24 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1 Annual Audit Report of Statutory CA (Form 5) (1).pdf | 9 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 14 Foresta N Fiora.pdf | 9 May 2024 |
| Other - TechnicalFile: MDL-PDPL merger INC-28.pdf | 9 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Foresta Fiora 18-19.pdf | 5 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Foresta Fiora 19-20.pdf | 5 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Foresta Fiora 20-21.pdf | 5 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Foresta Fiora 20-21.pdf | 5 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Foresta Fiora 21-22.pdf | 5 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Foresta Fiora 22-23.pdf | 5 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Foresta Fiora 23-24.pdf | 5 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Foresta Fiora 18-19.pdf | 5 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Foresta Fiora 19-20.pdf | 5 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Foresta Fiora 20-21.pdf | 5 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Foresta Fiora 21-22.pdf | 5 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Foresta Fiora 22-23.pdf | 5 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Foresta Fiora 23-24.pdf | 5 Apr 2024 |
| Certificates of CA (Form 3)File: Foresta Fiora 18-19.pdf | 5 Apr 2024 |
| Certificates of CA (Form 3)File: Foresta Fiora 19-20.pdf | 5 Apr 2024 |
| Certificates of CA (Form 3)File: Foresta Fiora 20-21.pdf | 5 Apr 2024 |
| Certificates of CA (Form 3)File: Foresta Fiora 21-22.pdf | 5 Apr 2024 |
| Certificates of CA (Form 3)File: Foresta Fiora 22-23.pdf | 5 Apr 2024 |
| Certificates of CA (Form 3)File: Foresta Fiora 23-24.pdf | 5 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Foresta And Fiora.pdf | 21 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Foresta And Fiora.pdf | 21 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Foresta And Fiora.pdf | 21 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Foresta Fiora - March23.pdf | 20 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Foresta Fiora - June23.pdf | 20 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Foresta Fiora - Sep23.pdf | 20 Dec 2023 |
| Certificates of CA (Form 3)File: Foresta - Fiora - March23.pdf | 20 Dec 2023 |
| Certificates of CA (Form 3)File: Foresta - Fiora - June23.pdf | 20 Dec 2023 |
| Certificates of CA (Form 3)File: Foresta - Fiora - Sep23.pdf | 20 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Foresta Fiora - P51700017506 - Form1 - March23.pdf | 13 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Foresta Fiora - P51700017506 - Form1 - June23.pdf | 13 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Foresta Fiora - P51700017506 - Form1 - Sep23.pdf | 13 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Foresta - Fiora - March23 - P51700017506.pdf | 11 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Foresta - Fiora - June23 - P51700017506.pdf | 11 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Foresta - Fiora - Sep23 - P51700017506.pdf | 11 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Foresta Fiora -P51700017506.pdf | 5 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Foresta Fiora.pdf | 16 Oct 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 46 foresta fiora.pdf | 27 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: FLORENCIA - A TO D.pdf | 31 Mar 2023 |
| Copy of the legal title reportFile: HEDUTANE-1-converted-Title Report_compressed.pdf | 26 Nov 2021 |
| Form 2AFile: 48 PALAVA FLORENCIA - A TO D.pdf | 18 Nov 2021 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 2 Nov 2021 |
| Details of encumbrancesFile: Palava Florencia - A to D.pdf | 27 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 23_FLORENCIA - A TO D.pdf | 15 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 46 Palava Florencia - A To D.pdf | 15 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 24 PALAVA FLORENCIA - A TO D.pdf | 14 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: P51700017506.pdf | 14 Oct 2021 |
| Certificates of CA (Form 3)File: 14 PALAVA FLORENCIA - A TO D.pdf | 9 Oct 2021 |
| Details of encumbrancesFile: Florencia A to D.pdf | 28 Sep 2021 |
| Form 2AFile: P51700017506.pdf | 13 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 47 Plava Florencia A to D.pdf | 27 Oct 2020 |
| Form 2AFile: Palava Florecia A to D.pdf | 27 Aug 2020 |
| Annual Audit Report of Statutory CA (Form 5)File: Palava Florencia A to D.pdf | 9 Oct 2019 |
| Form 2AFile: FLORENCIA A TO D.pdf | 17 Jun 2019 |
| Details of encumbrancesFile: PALAVA FLORENCIA A TO D.pdf | 25 Feb 2019 |
| Building plan approvalFile: D9.pdf | 19 Nov 2018 |
| Building plan approvalFile: D10.pdf | 19 Nov 2018 |
| Building plan approvalFile: D11.pdf | 19 Nov 2018 |
| Building plan approvalFile: D12.pdf | 19 Nov 2018 |
| Building plan approvalFile: D13.pdf | 19 Nov 2018 |
| Building plan approvalFile: D14.pdf | 19 Nov 2018 |
| Building plan approvalFile: D27.pdf | 19 Nov 2018 |
| Building plan approvalFile: D28.pdf | 19 Nov 2018 |
| Building plan approvalFile: D29.pdf | 19 Nov 2018 |
| Building plan approvalFile: D30.pdf | 19 Nov 2018 |
| Building plan approvalFile: D31.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: D9.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: D10.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: D11.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: D12.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: D13.pdf | 19 Nov 2018 |
| Building Plan Approval (IOD)File: D14.pdf | 19 Nov 2018 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Liana BP51700033964 | Dombivali, Thane | 140 | Mar 2022 | Completed | Feb 2026 | Jun 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 54 other registrations, which the RERA portal never shows together
- All 131 filed documents as one ZIP, foldered, with a manifest
Keep Foresta & Fiora on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dombivali7,600+ in Thane
REGENCY ANANTAM NXT PHASE I
REGENCY NIRMAN LTD
Crown Dombivli 2
LODHA DEVELOPERS LIMITED
Crown Dombivli 1
LODHA DEVELOPERS LIMITED
Casa Belvedere
LODHA DEVELOPERS LIMITED
Fiora G and H
LODHA DEVELOPERS LIMITED
Regency Luxuria Phase III
REGENCY NIRMAN LTD
See every Thane project, with the district possession charts
Builder: Palava Dwellers Private Limited
Palava Dwellers Private Limited has 55 registrations on MahaRERA, including PALAVA VISTA A to D and Palava Cielo A - F. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that Foresta & Fiora shows as de-registered on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Foresta & Fiora is delayed beyond 28 Aug 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Foresta & Fiora?
The registered promoter entity is Palava Dwellers Private Limited, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Foresta & Fiora?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Foresta & Fiora?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Foresta & Fiora?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Foresta & Fiora?
The professionals named in the filing: Architect: VILAS DESAI & ASSOCIATES; Engineer: K C SHAH CONSULTANTS; Chartered Accountant: B B JAIN & ASSOCIATES; Chartered Accountant: MSKA & ASSOCIATES; Chartered Accountant: Chirag Sarvaiya & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Foresta & Fiora?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback