Home / Browse projects / Bengaluru Urban, Karnataka / Five Rings

Registration approved Residential/Group Housing project

Five Rings

By ORAVIA PROJECTS PRIVATE LIMITED

RG-KA-72852 · RERA PRM/KA/RERA/1251/308/PR/171102/002143

Source: official RERA Karnataka filing

Red flags

  • 26 complaints at RERA Karnataka
  • Completion date moved by 21 months
  • 2 extensions taken

Clear

  • Separate project account declared
Sep 2023Possession promisedmoved 21 months from the original
26Complaints at RERA Karnatakaon this registration
Jump to the 39 documents Report an error

Five Rings is a Residential/Group Housing project by ORAVIA PROJECTS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/171102/002143 on 2 Nov 2017. Possession is promised by 30 Sep 2023. The completion date has moved by 21 months from the original filing. 26 complaints are on record with the regulator.

At a glance

Project

  • NameFive Rings
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/171102/002143
  • ReraGenie IDRG-KA-72852

Builder

  • NameORAVIA PROJECTS PRIVATE LIMITED
  • Entity typeCompany
  • Authorized SignatoryVivekananda Revaiah

Key dates

this monthRegisteredNov 2017First promiseDec 2021Revised toSep 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on2 Nov 2017
  • Promised completion30 Sep 2023
  • Revised completionRevised to 30 Sep 2023 (originally 31 Dec 2021)
  • Buildings7 building records
  • Documents filed39 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower A---2070207
Tower B---2070207
Tower C---54054
Tower D---54054
Tower E---36036
Tower F---36036
Tower G---36036

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolNoNot applicable
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area20,133 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 75.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLife Inside Architects
EngineerNeman Sharif M M

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2021 → Sep 2022

No reason recorded in the filing

EX/PRM/KA/RERA/1251/308/PR/241018/002143Sep 2022 → Sep 2023

Reason as filed by the promoterShortage of Labour

Complaints filed with RERA Karnataka26

Case no.ComplainantRespondentFiled
CMP/201123/0007089-Exd Projects Private Limited23/11/2020
CMP/201130/0007165-Exd Projects Private Limited30/11/2020
CMP/210326/0007840-Exd Projects Private Limited26/03/2021
CMP/210403/0007861-Exd Projects Private Limited03/04/2021
CMP/210403/0007862-Exd Projects Private Limited03/04/2021
CMP/210412/0007884-Exd Projects Private Limited12/04/2021
CMP/210417/0007900-Exd Projects Private Limited17/04/2021
CMP/210417/0007901-Exd Projects Private Limited17/04/2021
CMP/210417/0007902-Exd Projects Private Limited17/04/2021
CMP/210417/0007903-Exd Projects Private Limited17/04/2021
CMP/210417/0007904-Exd Projects Private Limited17/04/2021
CMP/210417/0007905-Exd Projects Private Limited17/04/2021
CMP/210417/0007906-Exd Projects Private Limited17/04/2021
CMP/210424/0007923-Exd Projects Private Limited24/04/2021
CMP/210428/0007934-Exd Projects Private Limited28/04/2021
CMP/211201/0008660-Exd Projects Private Limited01/12/2021
CMP/220618/0009648-Exd Projects Private Limited18/06/2022
CMP/220817/0009907-Exd Projects Private Limited17/08/2022
CMP/220901/0009966-Exd Projects Private Limited01/09/2022
00322/2023-Exd Projects Private Limited14/03/2023
00552/2023-Exd Projects Private Limited25/04/2023
01228/2023-ORAVIA PROJECTS PRIVATE LIMITED08/08/2023
01321/2023-ORAVIA PROJECTS PRIVATE LIMITED01/09/2023
01398/2023-ORAVIA PROJECTS PRIVATE LIMITED12/09/2023
00491/2024-ORAVIA PROJECTS PRIVATE LIMITED27/05/2024
00979/2024-ORAVIA PROJECTS PRIVATE LIMITED05/10/2024

Documents filed39

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/171102/002143 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Certificate of Incorporation-050815.pdf-
Architect Certificate for Work Completion Schedule till DateFile: FORM 1 Architect Work Completed.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Eng Work Completed.pdf-
CA Certificate for Funds UtilizationFile: CA FUNDS UTILISED EXD.pdf-
Architect Certificate for Pending Work Completion Schedule.File: FORM 2 Arch Work Pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Eng Work Pending.pdf-
CA Certificate for Funds required for Project CompletionFile: CA FUND REQ EXD.pdf-
Latest Encumbrance CertificateFile: EC.pdf-
STRR-Commencement certificate-
site plan with area statement-
Site Plan-
Sale Deed Performa-
Sale Agreement-proforma final-
Land documents-
Development Plan-
Allotment Letter Format-
brochure-
specifications-final-
EC-Doc 2017-07-29-
eKhata-
Land documents-
Fire NOC Approval-split-merge-
Airports Authority of India- NOC-
BESCOM -
NOCs-
BSNL-
Development Plan-
specifications-final-
Conversion Order-
Balance Sheet 2015 - 2016File: Balance sheet.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Profit & Loss.pdf-
Director's Report 2015 - 2016File: Boards' Report.pdf-
Cash Flow Statement 2015 - 2016File: cashflow.pdf-
Auditor's Report 2015 - 2016File: Auditors report.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR acknowledgment.pdf-
Form-B-
Prospectus/BrochureFile: ebrochure Rera.pdf-
Advertisement Copy 1File: The Times Of India - Bangalore _ 09_06_2018 _ AA3.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_308_PR_171102_002143.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 21 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Five Rings on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmFive RingsOther 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 12 registered projects within 2 km.

Builder: ORAVIA PROJECTS PRIVATE LIMITED

ORAVIA PROJECTS PRIVATE LIMITED has 1 registration on RERA Karnataka, including Five Rings. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Five Rings is delayed beyond 30 Sep 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Five Rings?

The registered promoter entity is ORAVIA PROJECTS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Five Rings?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Five Rings?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Five Rings?

The professionals named in the filing: Architect: Life Inside Architects; Engineer: Neman Sharif M M. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Five Rings?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Five Rings. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Five Rings to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.