ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / FAIA of Kessaku

Registration approved Residential/Group Housing project

FAIA of Kessaku

By Palladium Constructions Pvt Ltd

RG-KA-60769 · RERA PRM/KA/RERA/1251/309/PR/171015/000454 · Last updated on RERA Karnataka portal: 11 Feb 2022

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 18 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Dec 2021Possession promisedmoved 18 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 123 documents Report an error

FAIA of Kessaku is a Residential/Group Housing project by Palladium Constructions Pvt Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/171015/000454 on 15 Oct 2017. Possession is promised by 30 Dec 2021. The completion date has moved by 18 months from the original filing.

At a glance

Project

  • NameFAIA of Kessaku
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/309/PR/171015/000454
  • ReraGenie IDRG-KA-60769

Builder

  • NamePalladium Constructions Pvt Ltd
  • Entity typeCompany
  • CINU45400MH2008PTC178115
  • Authorized SignatoryRaghav Bajoria
  • Board MembersSwapnil Kotari, Amit Kumar Dabriwala
  • DirectorsKumar Diwesh, Rajesh Kulkarni, Arshia Ladak, Varun Parwal
  • Other registrations5 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2017First promiseJun 2020Revised toDec 2021

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Oct 2017
  • Promised completion30 Dec 2021
  • Revised completionRevised to 30 Dec 2021 (originally 30 Jun 2020)
  • Buildings1 building record
  • Documents filed123 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
FAIA of KESSAKU---58058

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 11 Feb 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 11 Feb 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationYes-
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionYes-
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area67,488 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 127.60 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVivek Uthaiah
EngineerPrasad Consultants

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJun 2020 → Dec 2020

No reason recorded in the filing

EX/PRM/KA/RERA/1251/309/PR/220810/000454Dec 2020 → Dec 2021

Reason as filed by the promoterothers

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed123

As listed on the registration, under the names the promoter filed them with; the newest 80 of 123 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/171015/000454 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Modification OrderFile: PRM-000454 (1).pdf11 Feb 2022
Help desk screen shotFile: FAIA Help desk.pdf11 Feb 2022
SITE PLAN DEMARCATED FOR FAIAFile: 1 Site Plan FAIA.pdf6 Mar 2021
Basement 1 Floor Plan 94File: 2 Basement 1 Floor Plan 94.pdf6 Mar 2021
Basement 2 Floor Plan 90File: 3 Basement 2 Floor Plan 90.pdf6 Mar 2021
Basement 3 Floor Plan 86File: 4 Basement 3 Floor Plan 86.pdf6 Mar 2021
Ground Floor PlanFile: 5 Ground Floor Plan.pdf6 Mar 2021
First Floor PlanFile: 6 First Floor Plan.pdf6 Mar 2021
Typical Floor Plan 2 18 26File: 7 Typical Floor Plan 2 18 26.pdf6 Mar 2021
Typical Floor Plan 3 9 19 21 25 27File: 8 Typical Floor Plan 3 9 19 21 25 27.pdf6 Mar 2021
Typical Floor Plan 4 12 16 28File: 9 Typical Floor Plan 4 12 16 28.pdf6 Mar 2021
Typical Floor Plan 5 7 11 13 15 17 23File: 10 Typical Floor Plan 5 7 11 13 15 17 23.pdf6 Mar 2021
Typical Floor Plan 6 10 14 22File: 11 Typical Floor Plan 6 10 14 22.pdf6 Mar 2021
Typical Level Floor Plan 8 20 24File: 12 Typical Level Floor Plan 8 20 24.pdf6 Mar 2021
29th Level Floor PlanFile: 13 29th Level Floor Plan.pdf6 Mar 2021
30th Level Floor PlanFile: 14 30th Level Floor Plan.pdf6 Mar 2021
Elevation A PlanFile: 15 Elevation A Plan.pdf6 Mar 2021
Terrace Level Floor PlanFile: 16 Terrace Level Floor Plan.pdf6 Mar 2021
Section B PlanFile: 17 Section B Plan.pdf6 Mar 2021
FAIA SOLD & UNSOLDFile: FAIA SOLD UNSOLD.xlsx6 Mar 2021
SECTION PLANFile: Site Plan 01 02 2020.pdf6 Mar 2021
EXTENSION AFFIDAVITFile: FAIA - Extension affidavit.pdf19 Feb 2021
COMMENCEMENT CERTIFICATEFile: COMMENCEMENT CERTIFICATE.pdf19 Feb 2021
MODIFICATION LETTERFile: FAIA - Modification letter 17.02.2021.pdf19 Feb 2021
AFFIDAVIT FOR NO SALESFile: AFFIDAVIT FOR NO SALES.PDF19 Feb 2021
FAIA QUERY REPLYFile: FAIA - QUERY REPLY.pdf19 Feb 2021
AREA STATEMENTFile: 1 AREA STATEMENT FAIA.xlsx7 Jan 2021
LICENSEFile: 2 Licence and Condition-2020.pdf7 Jan 2021
LATITUDE & LONGITUDEFile: LATITUDE & LONGITUDE.pdf7 Jan 2021
REPLY TO NOTICEFile: REPLY TO NOTICE.pdf7 Jan 2021
FAIA MODIFIED PLANFile: 3 Faia-2020.pdf7 Jan 2021
OLD PLANFile: 4 OLD Faia 2014.pdf7 Jan 2021
CertificateFile: Incorpn Certificate.pdf-
Already registered project ongoing detailsFile: 11 FAIA of Kessaku - Architect Certificate.pdf-
Modified plan details site plan, floor plans, Plan Licence LetterFile: 06 Licence and Condition-2020.pdf-
Elevation, Sections, Specifications ( If changes are there )File: 11.pdf-
List Of AllotteesFile: 04 NIL - No Sales.pdf-
List Of ComplaintsFile: 04 NIL - No Sales.pdf-
Consent LetterFile: 04 NIL - No Sales.pdf-
List Of Pending LitigationsFile: NIL Litigation.pdf-
Chartered Accountant CertificateFile: 10 FAIA of Kessaku - CA's Certification.pdf-
Notarized AffidavitFile: Affidavit FAIA.PDF-
Engineer CertificateFile: 12 FAIA of Kessaku - Engineer's Certificate.pdf-
Architect CertificateFile: 11 FAIA of Kessaku - Architect Certificate.pdf-
Structural Engineer Certificate for stability of structureFile: 13 Structural Stability Certificate - Block 2.pdf-
Modification of Plan DetailsFile: ABP 01.pdf-
Modification of Plan DetailsFile: 02 B - BBMP Site plan 01022020.PDF-
Modification of Plan DetailsFile: 03 CC for Block 1 & Kessaku.pdf-
Modification of Plan DetailsFile: 03 CC for Block 1 & Kessaku.pdf-
Modification of Plan DetailsFile: 04 NIL - No Sales.pdf-
Modification of Plan DetailsFile: 04 NIL - No Sales.pdf-
Document 1File: BWSSB 31102019.pdf-
Document 2File: AAI NOC 12032020.pdf-
Document 3File: FIRE 18122019.pdf-
Document 4File: KSPCB 21102019.pdf-
Document 5File: BSNL 22122020.pdf-
Document 6File: BESCOM 25042019.pdf-
Fire NOCFile: FIRE.pdf-
Architect Certificate for Work Completion Schedule till DateFile: FAIA - Arch CERTIFICATE FOR WORK COMPLETED.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: 07 FAIA Eng Certi - work Completed.pdf-
CA Certificate for Funds UtilizationFile: FAIA CA CERTF FUND UTILIZED.pdf-
Architect Certificate for Pending Work Completion Schedule.File: FAIA - Arch CERTIFICATE FOR PENDING WORK.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: 08 FAIA Eng Certi - Pending Work.pdf-
CA Certificate for Funds required for Project CompletionFile: FAIA CA CERTIF FUND REQURIED.pdf-
AffidavitFile: FAIA - Affidavit cum Declaration- FINAL.pdf-
Latest Encumbrance CertificateFile: 06 EC from 01042004 to 10082020.pdf-
Details Of Sold/ Un-sold UnitsFile: NA - NO SALES.pdf-
NOC DetailsFile: BWSSB 31102019.pdf-
NOC DetailsFile: AAI NOC 12.03.2020.pdf-
NOC DetailsFile: BESCOM 25.04.2019.pdf-
NOC DetailsFile: KSPCB 8.05.2013.pdf-
NOC DetailsFile: New BSNL NOC.pdf-
Document 1File: 02 FAIA Covid Certificate PRMKARERA1251309PR171015000454.pdf-
Document 2File: FAIA - Form Ex - 7-FINAL.pdf-
Document 3File: FAIA RERA Bank Account 13102017 TO 28102020.pdf-
Commencement Certificate-
ABP 01-
Sale Deed 9-
ATS 00-
Land Documents 00-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
One Bangalore West Tower 1 to 5-Completed-No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 18 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep FAIA of Kessaku on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Palladium Constructions Pvt Ltd

Palladium Constructions Pvt Ltd has 6 registrations on RERA Karnataka, including NIWA of Kessaku and FAIA of Kessaku. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if FAIA of Kessaku is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of FAIA of Kessaku?

The registered promoter entity is Palladium Constructions Pvt Ltd, a company as per the filing. Its CIN U45400MH2008PTC178115 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in FAIA of Kessaku?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at FAIA of Kessaku?

The professionals named in the filing: Architect: Vivek Uthaiah; Engineer: Prasad Consultants. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FAIA of Kessaku?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FAIA of Kessaku. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FAIA of Kessaku to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.