Registration approved Residential/Group Housing project

EXCELSIOR

By KATARIA INFFRA

RG-KA-75083 · RERA PRM/KA/RERA/1251/310/PR/180524/001814

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 3 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Jun 2019Possession promisedmoved 3 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 64 documents Report an error

EXCELSIOR is a Residential/Group Housing project by KATARIA INFFRA in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/180524/001814 on 24 May 2018. Possession is promised by 30 Jun 2019. The completion date has moved by 3 months from the original filing.

At a glance

Project

  • NameEXCELSIOR
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/180524/001814
  • ReraGenie IDRG-KA-75083

Builder

  • NameKATARIA INFFRA
  • Entity typePartnership Firm
  • Authorized SignatoryVIMAL JAIN

Key dates

this monthRegisteredMay 2018First promiseMar 2019Revised toJun 2019

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on24 May 2018
  • Promised completion30 Jun 2019
  • Revised completionRevised to 30 Jun 2019 (originally 26 Mar 2019)
  • Buildings3 building records
  • Documents filed64 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---16016
B---16016
C---16016

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,844 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 4.11 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/310/PR/200526/001814Mar 2019 → Jun 2019

Reason as filed by the promoterShortage of Labour

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed64

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/180524/001814 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: GST Reg Cert.jpg-
Architect Certificate for Work Completion Schedule till DateFile: Architect work done.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer work done-edited.pdf-
CA Certificate for Funds UtilizationFile: CA Funds utilized.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architects certificate- Pending certificate.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer work pending-edited.pdf-
CA Certificate for Funds required for Project CompletionFile: CA funds required.pdf-
AffidavitFile: Rera form B.PDF-
Latest Encumbrance CertificateFile: EC.PDF-
Consent letter from 2/3rd of AllotteesFile: Consent letter.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: ACC 1 4 2019 TO 30 6 2019.pdf-
Document 2File: JUNE 26 9400 AC.pdf-
Document 3File: RERA ACC 1 4 2019 TO 30 6 2019.pdf-
Document 4File: JUNE 26 AC 2920.pdf-
Document 5File: notarised affidavit for extension.pdf-
Document 6File: Plan Layout.jpg-
Document 7File: NOC for consstruction.pdf-
Document 8File: CC.pdf-
Document 9File: Consent letter.pdf-
Document 10File: OC.PDF-
Document 11File: MERGED AFFIDAVIT.pdf-
Document 12File: RECEIPT.jpg-
Document 13File: extension letter of kataria inffra.pdf-
Document 14File: AFFIDAVIT US 18.pdf-
Certificate-
Project Plan Sanction-
Legible approved plan with signature and seal-
AGTS RERA Sy No-
AGTS RERA Sy No-
52 1 xerox scan saledeed vimalja-
Project Plan Sanction-
Project Plan Sanction-
AGTS RERA Sy No-
Brochure-
1 BLOCK BOQ FOR APARTMENT @ KUMBALGUD-
EC AND KHATA-
52 1 conversion order-
Plan Layout-
Plan Layout-
Balance Sheet 2016 - 2017File: it vimal jain 2016-17.PDF-
Balance Sheet 2015 - 2016File: it vimal jain 2015-16.PDF-
Balance Sheet 2014 - 2015File: it vimal jain 2014-15.PDF-
Audited Profit and Loss Statement 2016 - 2017File: it vimal jain 2016-17.PDF-
Audited Profit and Loss Statement 2015 - 2016File: it vimal jain 2015-16.PDF-
Audited Profit and Loss Statement 2014 - 2015File: it vimal jain 2014-15.PDF-
Director's Report 2016 - 2017File: it vimal jain 2016-17.PDF-
Director's Report 2015 - 2016File: it vimal jain 2016-17.PDF-
Director's Report 2014 - 2015File: it vimal jain 2016-17.PDF-
Cash Flow Statement 2016 - 2017File: it vimal jain 2016-17.PDF-
Cash Flow Statement 2015 - 2016File: it vimal jain 2016-17.PDF-
Auditor's Report 2016 - 2017File: it vimal jain 2016-17.PDF-
Auditor's Report 2015 - 2016File: it vimal jain 2016-17.PDF-
Auditor's Report 2014 - 2015File: it vimal jain 2016-17.PDF-
Income Tax Return Acknowledgement 2016 - 2017File: it vimal jain 2016-17.PDF-
Income Tax Return Acknowledgement 2015 - 2016File: it vimal jain 2015-16.PDF-
Income Tax Return Acknowledgement 2014 - 2015File: it vimal jain 2014-15.PDF-
Form B Annx-
Prospectus/BrochureFile: Brochure.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_180524_001814.xlsx-
Occupancy CertificateFile: OC.PDF-
Completion certificateFile: completion certificate.PDF-
Registered Agreement of SaleFile: Sale agreement (2).pdf-
Registered conveyance deed for an individual unitFile: sale deed (2).pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 3 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep EXCELSIOR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmEXCELSIOROther 7Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: KATARIA INFFRA

KATARIA INFFRA has 1 registration on RERA Karnataka, including EXCELSIOR. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if EXCELSIOR is delayed beyond 30 Jun 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of EXCELSIOR?

The registered promoter entity is KATARIA INFFRA, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in EXCELSIOR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in EXCELSIOR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EXCELSIOR. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EXCELSIOR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.