Home / Browse projects / Bengaluru Urban, Karnataka / Excel Golden Enclave

Registration approved No litigation declared Residential/Group Housing project

Excel Golden Enclave

By GOLDEN PROPERTIES

RG-KA-81466 · RERA PRM/KA/RERA/1251/309/PR/290423/005897 · Last updated on RERA Karnataka portal: 25 Apr 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jun 2024Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 97 documents Report an error

Excel Golden Enclave is a Residential/Group Housing project by GOLDEN PROPERTIES in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/290423/005897 on 29 Apr 2023. Possession is promised by 30 Jun 2024.

At a glance

Project

  • NameExcel Golden Enclave
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/309/PR/290423/005897
  • ReraGenie IDRG-KA-81466

Builder

  • NameGOLDEN PROPERTIES
  • Entity typePartnership Firm
  • GSTIN29AAXFG6236H1ZR
  • Authorized SignatoryKumar H

Key dates

this monthRegisteredApr 2023PromisedJun 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on29 Apr 2023
  • Promised completion30 Jun 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed97 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Excel Golden Enclave---22022

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 25 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 25 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolNoNot applicable
GymYes-
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-
Common storage spacesYes-

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
Excel Realty Associates--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 7.93 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 6.07 cr-
Payment of taxesRs 1.03 cr-
On-site expenditure-Site OverheadRs 25.99 lakh-
Principal sum and interest payable to financial institutions-Scheduled BanksRs 23.25 lakh-
On-site expenditure-Salaries of workersRs 15.00 lakh-
On-site expenditure-Consultants FeesRs 11.00 lakh-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 7.59 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectE Roshini
EngineerKumar C G
Chartered AccountantNirmala Sreenivasulu

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed97

As listed on the registration, under the names the promoter filed them with; the newest 80 of 97 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/290423/005897 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
estimated cost of construction certified by the EngineerFile: Summary of civil works.pdf25 Apr 2023
upload the NOC issued by BWSSBFile: BWSSB NOC Letter.pdf25 Apr 2023
BWSSB Payment ChallanFile: BWSSB Receipt.pdf25 Apr 2023
Bank account name should be as per bank account direction circularFile: RERA Designated Account.jpeg8 Apr 2023
all the sources of funds to complete the projectFile: Sources of funds to Complete the project.pdf8 Apr 2023
updated area detailsFile: Area Details Of The Project.pdf8 Apr 2023
Summary of civil worksFile: Summary of civil works.pdf8 Apr 2023
Certificate from Registered Engineer indicating the structural safetyFile: Structural Stability Certificate.pdf8 Apr 2023
NOC issued by BWSSBFile: BWSSB Demand Note.pdf8 Apr 2023
NOC issued by BWSSBFile: BWSSB Demand.pdf8 Apr 2023
NOC issued by BESCOMFile: BESCOM NOC.pdf8 Apr 2023
BESCOM Fee paid ReceiptFile: BECOM Fees Receipt.pdf8 Apr 2023
KSPCB NOCFile: KSPCB NOC.pdf8 Apr 2023
STP design drawing and STP demarcation drawing as per the guidelines of KSPCBFile: STP Design and Demarcation Drawing.pdf8 Apr 2023
proforma of Allotment letterFile: Proforma of Allotment Letter.pdf8 Apr 2023
proforma of Agreement of SaleFile: Proforma for Agreement of Sale.pdf8 Apr 2023
Bank account name should be as per bank account direction circularFile: Will be Uploaded Soon.pdf16 Mar 2023
Cash flow statementFile: Cash Flow Statement.pdf16 Mar 2023
sources of funds to complete the projectFile: SOURCES OF FUNDS TO COMPLETE THE PROJECT.pdf16 Mar 2023
advocate search reportFile: Advocate Search Report.pdf16 Mar 2023
No of ParkingsFile: pARKINGS.pdf16 Mar 2023
sale deed from dhanjaya srinivas , dhanjaya madhuri to excel realty associations for 75/2 ext 0.10File: Sale Deed Dhanraj Srinivas,Madhuri.pdf16 Mar 2023
CDP map showing the proposed siteFile: CDP Map showing proposed site.pdf16 Mar 2023
KSPCB Fee Paid ReceiptFile: KSPCB Payment Receipt.pdf16 Mar 2023
KSPCB NOCFile: Will be Uploaded Soon.pdf16 Mar 2023
brief estimated cost of construction certified by the Engineer(Summary of civil works)File: Will be Uploaded Soon.pdf16 Mar 2023
Certificate from Registered Engineer indicating the structural safety adopted for the proposed buildFile: Will be Uploaded Soon.pdf16 Mar 2023
NOC issued by BWSSB and BESCOM along with the copy of fee receipt paid towards NOCFile: Will be Uploaded Soon.pdf16 Mar 2023
STP design drawing and STP demarcation drawing as per the guidelines of KSPCB.File: Will be Uploaded Soon.pdf16 Mar 2023
proforma of Allotment letterFile: Proforma of Allottment Letter.pdf16 Mar 2023
proforma of Agreement for Sale as notified by GOK.File: Proforma for Agreement of Sale.pdf16 Mar 2023
Village Map showing proposed siteFile: chokkanahalli village map.pdf16 Mar 2023
Bescom fee paid receiptFile: BESCOM Payment Receipt.jpeg16 Mar 2023
profit and loss account and balance sheet, 2019-20 ,2020-21 & 2021-22 with CA UDIN along with schedFile: P&L and BS for 19-20, 20-21 and 21-22.pdf11 Feb 2023
Bank account name should be as per bank account direction circularFile: Will be Uploaded Soon.pdf11 Feb 2023
Cash flow statement, Directors report and Auditor report for 2019-20 ,2020-21 & 2021-22File: Cash Flow, Directors Report and Auditors Report for 19-20, 20-2.pdf11 Feb 2023
all the sources of funds to complete the projectFile: SOURCE OF FUNDS TO COMPLETE THE PROJECT.pdf11 Feb 2023
sale deed from RTC land owners to anaru venkata subbaiah for 75/2 ext 0.10 1/2 guntasFile: Sale Deed Avvaru Venkatasubbaiah.pdf11 Feb 2023
confirmation deed from nurunnisa begam ,nissar ahamad , nusarat muvahid begaum , shetter ahmed and oFile: confirmation deed.pdf11 Feb 2023
sale deed from dhanjaya srinivas , dhanjaya madhuri to excel realty associations for 75/2 ext 0.10File: Sale Deed Dhanraj Srinivas,Madhuri.pdf11 Feb 2023
form bFile: Form B.pdf11 Feb 2023
upload the certified copy obtained by the concerned Sub-registrar regarding value of the propertyFile: Sub Registrar Copy regarding value of property.pdf11 Feb 2023
upload the certified copy obtained by the concerned Sub-registrar regarding value of the propertyFile: FAR FOR THE PROJECT.pdf11 Feb 2023
CDP map showing the proposed siteFile: Will be Uploaded Soon.pdf11 Feb 2023
village map showing the proposed siteFile: chokkanahalli village map.pdf11 Feb 2023
Architects certificate with valid COAFile: Architect Certificate.pdf11 Feb 2023
KSPCB CFEFile: Will be Uploaded Soon.pdf11 Feb 2023
brief estimated cost of construction certified by the Engineer(Summary of civil works)File: Will be Uploaded Soon.pdf11 Feb 2023
signed copy of the project specificationFile: Project Specification details.pdf11 Feb 2023
upload the section 3(1) notarized affidavitFile: Affidavit 3-1.pdf11 Feb 2023
proforma of allotment letterFile: Proforma of allotment letter.pdf11 Feb 2023
Proforma of Agreement of SaleFile: Proforma for Agreement of Sale.pdf11 Feb 2023
Certificate from Registered Engineer indicating the structural safety adopted for the proposed builFile: Will be Uploaded Soon.pdf11 Feb 2023
NOC issued by BWSSB and BESCOM along with the copy of fee receipt paid towards NOCFile: Will be Uploaded Soon.pdf11 Feb 2023
STP design drawing and STP demarcation drawing as per the guidelines of KSPCBFile: Will be Uploaded Soon.pdf11 Feb 2023
RTC, survey 75/2-
Mutation, survey 75/2-
Encumbrance Certificate, survey 75/2-
Conversion/Alienation Order, survey 75/2-
JDA, survey 75/2-
Khatha, survey 75/2-
Registration CertificateFile: Acknowledgement Of Registration Of Firm.pdf-
Partnership DeedFile: Partnership Deed Golden Properties.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form 1_compressed.pdf-
Certificate issued by Architect Form 2File: Form-2 Architect certificates.pdf-
Certificate issued by Engineer Form 3File: Form-3 Engineer certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: non litigation affidavit.pdf-
Certificate from Chartered AccountFile: Form 1_compressed.pdf-
Commencement Certificate-
Will be Uploaded Soon-
Will be Uploaded Soon-
Plan Approval Golden Enclave 2-
Plan Approval Golden Enclave 2-
Plan Approval-
Plan Approval-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Excel Golden Enclave on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: GOLDEN PROPERTIES

GOLDEN PROPERTIES has 1 registration on RERA Karnataka, including Excel Golden Enclave. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Excel Golden Enclave is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Excel Golden Enclave?

The registered promoter entity is GOLDEN PROPERTIES, a partnership firm as per the filing. Its GSTIN 29AAXFG6236H1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Excel Golden Enclave?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Excel Golden Enclave?

The professionals named in the filing: Architect: E Roshini; Engineer: Kumar C G; Chartered Accountant: Nirmala Sreenivasulu. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Excel Golden Enclave?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Excel Golden Enclave. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Excel Golden Enclave to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.