Home / Browse projects / Bengaluru Urban, Karnataka / Evershine NORTHEAST Apartments
Evershine NORTHEAST Apartments
By Evershine Dwellings Pvt ltd
RG-KA-63041 · RERA PRM/KA/RERA/1251/308/PR/220210/004690 · Last updated on RERA Karnataka portal: 2 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Evershine NORTHEAST Apartments is a Residential/Group Housing project by Evershine Dwellings Pvt ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/220210/004690 on 10 Feb 2022. Possession is promised by 30 Sep 2026. 111 of the 168 units on this registration are recorded sold or booked, and 18 of 18 construction stages are filed complete.
At a glance
Project
- NameEvershine NORTHEAST Apartments
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/308/PR/220210/004690
- ReraGenie IDRG-KA-63041
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on10 Feb 2022
- Promised completion30 Sep 2026
- Revised completionNone
- Buildings2 building records
- Documents filed162 files
Current status
Figures as on 2 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Block A | - | - | - | 84 | 0 | 84 |
| Block B | - | - | - | 84 | 0 | 84 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 2 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 18 construction stages are filed complete.
Building: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Retaining wall (All types) | 100% |
| Plinth level Beam | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry construction: Bricks, Concrete blocks etc | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 100% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 100% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | 100% |
| Weather Proof work(tile,concrete) | 100% |
| Painting | 100% |
| Elevation work | 100% |
| Internal and External work including landscapes as per santioned drawings | 100% |
Progress on shared amenities41
As on 2 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Internal Roads & Footpaths | Yes | 100% |
| Sewage and Drainage System | Yes | 100% |
| Parks & Tree planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | 100% |
| Solid waste management and disposal | Yes | 100% |
| Water conservation | Yes | 100% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Education/Health/Other public amenities | No | Not applicable |
| Electricity supply transformer and substation | Yes | 100% |
| Emergency Evacuation services | Yes | 100% |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 100% |
| Electricity | Yes | 100% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 100% |
| Club House | Yes | 100% |
| Community Hall | Yes | 100% |
| Outdoor Sports facility | Yes | 100% |
| Indoor Sports facility | Yes | 100% |
| Swimming Pool | Yes | 100% |
| Gym | Yes | 100% |
| Parks | Yes | 100% |
| Power Backup | Yes | 100% |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | 100% |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | Yes | 100% |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | 100% |
| Fire escapes | Yes | 100% |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | 100% |
| Basement | Yes | 100% |
| Terrace | Yes | 100% |
| Outer Wall | Yes | 100% |
| Open parking areas and common storage spaces | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| G.Nisar | - | - |
| G.Ameer | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 35.28 cr | Rs 2.64 lakh |
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ramesh .D.B |
| Engineer | G.Praveen Kumar |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed162
As listed on the registration, under the names the promoter filed them with; the newest 80 of 162 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/220210/004690 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form - 4 Chartered Accountant- Q2 - 26 - 27.pdf | 2 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Architect's Certificate Q2 - 26 - 27.pdf | 2 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Engineer's Certificate Q2 - 26 - 27.pdf | 2 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 2 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 2 Oct 2026 |
| Q2 2026-27 Fire and Safety | 2 Oct 2026 |
| Q2 2026-27 Labour and Education Department | 2 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 2 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 2 Oct 2026 |
| Q2 2026-27 Registration documentFile: EVERSHINE NORTHEAST ASSOCIATION REGISTRATION CERTIFICATE.pdf | 2 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form - 4 Chartered Accountant - 26-27 - Q1.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Architect's Certificate Q1 - 26 - 27.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Engineer's Certificate Q1 - 26 - 27.pdf | 13 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 13 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 13 Jul 2026 |
| Q1 2026-27 Fire and Safety | 13 Jul 2026 |
| Q1 2026-27 Labour and Education Department | 13 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 13 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 13 Jul 2026 |
| Q1 2026-27 Registration documentFile: EVERSHINE NORTHEAST ASSOCIATION REGISTRATION CERTIFICATE.pdf | 13 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form - 4 Chartered Accountant - 24-25 - Q4.pdf | 25 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Architect's Certificate Q4 - 25 - 26.pdf | 25 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Engineer's Certificate Q4 - 25 - 26.pdf | 25 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 25 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 25 Apr 2026 |
| Q4 2025-26 Fire and Safety | 25 Apr 2026 |
| Q4 2025-26 Labour and Education Department | 25 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 25 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 25 Apr 2026 |
| Q4 2025-26 Registration documentFile: EVERSHINE NORTHEAST ASSOCIATION REGISTRATION CERTIFICATE.pdf | 25 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: FORM- 4 CA CERTIFICATE - Q3 -25 - 26.pdf | 2 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Architect's Certificate Q3 - 25 - 26.pdf | 2 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Engineer's Certificate Q3 - 25 - 26.pdf | 2 Feb 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 2 Feb 2026 |
| Q3 2025-26 KPTCL- BESCOM | 2 Feb 2026 |
| Q3 2025-26 Fire and Safety | 2 Feb 2026 |
| Q3 2025-26 Labour and Education Department | 2 Feb 2026 |
| Q3 2025-26 Airport Authority of India | 2 Feb 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 2 Feb 2026 |
| RERA Notified Agreement to SaleFile: Evershine NorthEast Draft ATS.pdf | 25 Jan 2022 |
| RERA Format Proforma Sale AgreementFile: RERA Format Sale Agreement - Evershine NorthEast.pdf | 31 Dec 2021 |
| Proforma Sale Agreement according to RERA notified by GOKFile: RERA Format Sale Agreement - Evershine NorthEast.pdf | 20 Dec 2021 |
| Proforma Construction AgreementFile: Construction Agreement- Evershine NorthEast.pdf | 20 Dec 2021 |
| Proforma Sale DeedFile: Draft Sale Deed - NorthEast.pdf | 20 Dec 2021 |
| Mortgage AffidivaitFile: Mortgage Affidavit.pdf | 20 Dec 2021 |
| Kathedar/Mother deedFile: Kathedhar Rashidkhan Survey no 31.pdf | 26 Nov 2021 |
| Sale deed No 1265- 09/3/1943File: sale deed True copy No 1265- 9-3-43.pdf | 26 Nov 2021 |
| Sale deed No 1285- 12 /3/1943File: Sale deed True copy 1285-12-3-43.pdf | 26 Nov 2021 |
| Family Partition Deed 1993File: Family Partition Deed 1993.pdf | 26 Nov 2021 |
| Sale deed 128-95-96 Venkateshappa to Dheeraj SethiyaFile: Sale deed 128-95-96 Venkateshappa to Dheeraj.pdf | 26 Nov 2021 |
| Sale deed 129-95-96 Anjanappa to Dheeraj SethiyaFile: Sale deed 129-95-96 Anjanappa to Sethiya.pdf | 26 Nov 2021 |
| Shantha bai Will to SwarnamalaFile: Will Shanta Bhai.pdf | 26 Nov 2021 |
| Shantha bai Will Probate OrderFile: Probhate Order Copy.pdf | 26 Nov 2021 |
| Shantha bai Will Probate CertificateFile: Probhate Certificate Will.pdf | 26 Nov 2021 |
| Sale deed No 3185 /2010/11 Swarnamala to Ameer & NisarFile: Sale deed -3185-2010-11 Swarnamala to Ameer & Nisar.pdf | 26 Nov 2021 |
| sale deed 4957/2011/12 Swarnamala to Ameer & NisarFile: sale deed 4957-2011-12 Swarnamala to Ameer & Nisar.pdf | 26 Nov 2021 |
| E-Khatha For 208/3File: E Katha 208-3 & Tax paid 2019.pdf | 26 Nov 2021 |
| E-Khatha For 208/4File: E katha 208-4 & Tax paid Recipet 2019.pdf | 26 Nov 2021 |
| GPA for Evershine Dwellings Pvt Ltd from Ameer & NisarFile: GPA EVERSHINE.pdf | 26 Nov 2021 |
| JDA Evershine Dwellings Pvt Ltd from Ameer & NisarFile: JDA EVERSHINE From Ameer & Nisar.pdf | 26 Nov 2021 |
| Sharing Agreement between Evershine Dwellings Pvt Ltd with Ameer & NisarFile: Sharing Agreement Evershine NorthEast.pdf | 26 Nov 2021 |
| E khatha Amalgamation of Survey no 208/3 & 208/4File: E-katha Amalgamation of 208-3 & 208-4 Ghathalli.pdf | 26 Nov 2021 |
| Tax paid 2021 of Survey no 208/3 & 208/4File: Sy No 208-3 & 208-4 Ghatthalli Tax paid 2021.pdf | 26 Nov 2021 |
| Confirmation Deed of Sy no 208/3 from Nagapa & family to Ameer & NisarFile: Confirmation Deed 208_3.pdf | 26 Nov 2021 |
| Confirmation Deed of Sy no 208/4 from Muniraju & family to Ameer & NisarFile: Confirmation Deed 208_4.pdf | 26 Nov 2021 |
| BANK ACCOUNT NAMEFile: Bank Statement with Declaration.pdf | 25 Oct 2021 |
| FEES PAYMENTFile: RERA Fees payment reciept .pdf | 8 Oct 2021 |
| BANK ACCOUNT NAMEFile: Rera Bank Account Name.pdf | 8 Oct 2021 |
| FINANCIAL STATEMENT FOR FY 20-21File: FY 20 - 21 Auditor's Report.pdf | 8 Oct 2021 |
| CA UDIN FOR FINANCIAL STATEMENT FOR FY 2018-19File: FY 18-19 Auditor's Report.pdf | 8 Oct 2021 |
| CA UDIN FOR FINANCIAL STATEMENT FOR FY 2019-20File: FY 19-20 Auditor's Report.pdf | 8 Oct 2021 |
| CONVERSION ORDER for SY NO : 208/4, 0.24 GUNTASFile: Conversion copy 208_4 24 guntas.pdf | 8 Oct 2021 |
| SALE DEED FOR SY.NO : 208/3File: SY NO 208_3 SALE DEED.pdf | 8 Oct 2021 |
| SALE DEED FOR SY.NO : 208/4File: SY NO 208_4 Sale deed.pdf | 8 Oct 2021 |
| FORM B AFFIDAVITFile: Form B Affidavit.pdf | 8 Oct 2021 |
| SITE PLANFile: Site Plan Blue .pdf | 8 Oct 2021 |
| CAR PARKING FLOORFile: Car parking Blue Plan.pdf | 8 Oct 2021 |
| FIRST FLOOR PLANFile: First Floor Plan Blue .pdf | 8 Oct 2021 |
| TYPICAL FLOOR PLANFile: Typical Floor Plan Blue .pdf | 8 Oct 2021 |
| ELEVATION AND SECTION DRAWINGSFile: Section Drawing Blue .pdf | 8 Oct 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Evershine Greenwood Apartments | - | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Evershine NORTHEAST Apartments on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 44 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Evershine Dwellings Pvt ltd
EVERSHINE DWELLINGS PVT LTD has 3 registrations on RERA Karnataka, including Evershine Greenwood and Evershine StonePark. Its filings declare 3 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Evershine NORTHEAST Apartments is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Evershine NORTHEAST Apartments?
The registered promoter entity is Evershine Dwellings Pvt ltd, a company as per the filing. Its CIN U45202KA2013PTC072430 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Evershine NORTHEAST Apartments?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Evershine NORTHEAST Apartments?
The professionals named in the filing: Architect: Ramesh .D.B; Engineer: G.Praveen Kumar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Evershine NORTHEAST Apartments?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback