ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / EV 23 MALIBU WEST

Registered No litigation declared Residential / Group Housing project

EV 23 MALIBU WEST

By EV HOMES CONSTRUCTIONS PVT LTD

RG-MH-19061 · RERA P51700078094 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 115.00 crore secured on the land, in favour of INFINA Finance Private Limited

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
5 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 10%
150 of 166Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

EV 23 MALIBU WEST is a Residential / Group Housing project by EV HOMES CONSTRUCTIONS PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700078094 on 25 Nov 2024. Possession is promised by 31 Dec 2029. 16 of the 166 units on this registration are recorded sold or booked, and 5 of 22 construction stages are filed complete.

At a glance

Project

  • NameEV 23 MALIBU WEST
  • TypeResidential / Group Housing
  • Location
    • Building C1 to C5 PLOT NO. 6
    • SECTOR-23
    • Koparkhairane
    • Navi Mumbai
    • Navi Mumbai (M Corp.)
    • Thane
    • 400709
  • Pincode400709
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700078094
  • ReraGenie IDRG-MH-19061

Builder

  • NameEV HOMES CONSTRUCTIONS PVT LTD
  • Entity typeCompany
  • CINU45200MH2005PTC155637
  • GSTIN27AABCE5013H1Z0
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorELENJIKAMALIL VARKEY THOMAS
  • DirectorsJOISE THOMAS, VICKY THOMAS, RICKI THOMAS
  • Other registrations5 more →
  • Completed2 of 6
  • Declared earlier projects6 →

Key dates

this monthRegisteredNov 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Nov 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed60 files

Current status

10%16 of 166 units booked
31.5%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 1NA302472072
Building 2NA211694094

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 10%.

Building 137%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building 29%
ActivityProgress
Excavation100%
Basement (if any)3%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed334

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots334
Closed/Covered164
Open Space170
BuildingClosed/CoveredOpen SpaceTotal
Building 18285167
Building 28285167

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,457 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofINFINA Finance Private Limited
Secured amountRs 115.00 crore
CERSAI search filedYes
Declared on20 May 2026
LandownerVillageDistrict
SHREE VASUNDHARA CO-OP. HSG. SOC. LTDNavi Mumbai (M Corp.)Thane

Approvals and building plan

Sanctioning authorityNavi Mumbai Municipal Corporation
Permissible FSI14065.72
Proposed, not sanctioned12,066 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shop No 14,15 16, Shri Ganesh Chs, Sector 1, Opp.Apna Bazar, Vashi, Navi Mumbai Dist.400703
Estimated costRs 72.00 cr
Cost incurredRs 22.68 cr
Work done31.5%
BuildingWingEstimatedIncurred
Building 1NARs 35.28 crRs 11.34 cr
Building 2NARs 35.28 crRs 11.34 cr
-NARs 1.44 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUrban Analysis & Solutions Consultancy Services
EngineerSK Consultants & Engineers
Chartered AccountantN B Sayed & Associates
Chartered AccountantJayesh Sanghrajka & Co. LLP
PartnerRole in project
EV HOMES CONSTRUCTIONS PVT. LTD.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - EV 23 Malibu West as on Dec 2025.pdf21 May 2026
Withdrawal Update Form 2File: Form 2 - EV 23 Malibu West as on Dec 2025.pdf21 May 2026
Withdrawal Update Form 3File: Form 3 Dec 2025 -23 Malibu West.pdf21 May 2026
Form 5 (FY 2024-2025)File: Form 5 23 Malibu West FY 24-25.pdf29 Dec 2025
Withdrawal Update Form 1File: Form 1 - EV 23 Malibu West as on Sep 2025.pdf19 Nov 2025
Withdrawal Update Form 2File: Form 2 - EV 23 Malibu West as on Sep 2025.pdf19 Nov 2025
Withdrawal Update Form 3File: Form 3 - EV 23 Malibu West as on Sep 2025.pdf19 Nov 2025
Form 1File: Form 1 - EV 23 Malibu West as on June 2025.pdf20 Jul 2025
Form 2File: Form 2 - EV 23 Malibu West as on June 2025.pdf20 Jul 2025
Form 3File: Form 3 - EV 23 Malibu West as on June 2025.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - EV 23 Malibu West as on June 2025.pdf20 Jul 2025
Details of encumbrances concerned to FinanceFile: EV 23 Malibu West - Encumbrance Certificate.pdf27 May 2025
Details of encumbrances concerned to LegalFile: EV 23 Malibu West - Encumbrance Certificate.pdf27 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dec 2024_11zon (4).pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 23 Malibu West - Mar 2025_11zon.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dec 2024.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 23 Malibu West - Mar 2025.pdf28 Apr 2025
Disclosure of sold/ booked inventoryFile: Circular 29 - Mar 2025.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - EV 23 Malibu West as on 31-03-2025.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - EV 23 Malibu West as on March 2025.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - EV 23 Malibu West as on March 2025.pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - EV 23 Malibu West as on Dec 2024.pdf12 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - EV 23 Malibu West as on Dec 2024.pdf12 Mar 2025
Building plan approvalFile: VASUNDHARA CC DRAWING_Part3_11zon.pdf18 Nov 2024
Building plan approvalFile: VASUNDHARA CC DRAWING_Part2_11zon.pdf18 Nov 2024
Building plan approvalFile: VASUNDHARA CC DRAWING_Part1_11zon.pdf18 Nov 2024
Copy of the legal title reportFile: Vasundhara Title Report.pdf18 Nov 2024
Proforma of Allotment letterFile: AL_EV 23 Malibu West_E V Home Construction Pvt Ltd_16112024.pdf18 Nov 2024
Declaration in FORM BFile: Promoter Declaration Format B.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Vasundhara EV 23 Malibu West Nov 2024_compressed (1).pdf18 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: VASUNDHARA CC DRAWING_Part3_11zon.pdf18 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: VASUNDHARA CC DRAWING_Part1_11zon.pdf18 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: VASUNDHARA CC DRAWING_Part2_11zon.pdf18 Nov 2024
Other - LegalFile: 1 Lease Deed _New_Part1_11zon.pdf18 Nov 2024
Other - LegalFile: 1 Lease Deed _New_Part2_11zon (1).pdf18 Nov 2024
Deviation Report with respect to Allotment letterFile: Deviation AL.pdf18 Nov 2024
Other - TechnicalFile: 1 Other - Technical.pdf18 Nov 2024
Other - TechnicalFile: 2 Other - Technical.pdf18 Nov 2024
Deviation Report with respect to model copy of AgreementFile: Deviation AFS.pdf18 Nov 2024
Proforma of Agreement for saleFile: AFS_EV 23 Malibu West_E V Home Construction Pvt Ltd_16112024 (1).pdf18 Nov 2024
Declaration about Commencement CertificateFile: Format D.pdf16 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A (1).pdf16 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE OF FINANCE.pdf16 Nov 2024
Building plan approvalFile: VASUNDHARA CC DRAWING_Part3_11zon.pdf15 Nov 2024
Building plan approvalFile: VASUNDHARA CC DRAWING_Part2_11zon.pdf15 Nov 2024
Building plan approvalFile: VASUNDHARA CC DRAWING_Part1_11zon.pdf15 Nov 2024
Layout approvalFile: LAyout_compressed.pdf15 Nov 2024
PAN CardFile: E V Homes Pan Card.pdf15 Nov 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER - FINANCE.pdf15 Nov 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER -Legal.pdf15 Nov 2024
Copy of Layout Approval (in case of layout)File: LAyout_compressed.pdf15 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: VASUNDHARA CC.pdf15 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: VASUNDHARA CC DRAWING_Part1_11zon.pdf15 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: VASUNDHARA CC DRAWING_Part2_11zon.pdf15 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: VASUNDHARA CC DRAWING_Part3_11zon.pdf15 Nov 2024
CERSAI detailsFile: CERSAI DECLARATION.pdf15 Nov 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER - FINANCE.pdf15 Nov 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER -Legal.pdf15 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_compressed.pdf15 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: e v homes Format B.pdf15 Nov 2024

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SINAI TOWERKAKINAD KOCHI KERALA 68201738CompletedJul 2017Feb 2017
E V CASTLEPLOT NO 110 SECTOR 9 ULVE TALUKA PANVEL DISTT RAIGAD 41020626CompletedApr 2016Apr 2016
ZION I AND IIPLOT NO 29 AND 30 SECTOR 25 NERUL EAST NAVI MUMBAI 40070659CompletedMar 2016Late, May 2017
SAFFIRE HEIGHTSPLOT NO 32A AND 33A SECTOR 12 KALAMBOLI TALUKA PANVEL DISTT RAGIAD 41020970CompletedMar 2010Late, May 2012

How this compares with Thane

10%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EV 23 MALIBU WEST on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Koparkhairane, Navi Mumbai7,600+ in Thane

2 kmEV 23 MALIBU WESTCompleted 19Lapsed / revoked 9Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 58 registered projects within 2 km.

Builder: EV HOMES CONSTRUCTIONS PVT LTD

EV HOMES CONSTRUCTIONS PVT LTD has 6 registrations on MahaRERA, including EV CITY CENTRE and EV Heart City. Its filings disclose 6 earlier MahaRERA projects: declares 2 of 4 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if EV 23 MALIBU WEST is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EV 23 MALIBU WEST?

The registered promoter entity is EV HOMES CONSTRUCTIONS PVT LTD, a company as per the filing. Its CIN U45200MH2005PTC155637 and GSTIN 27AABCE5013H1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EV 23 MALIBU WEST?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EV 23 MALIBU WEST?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EV 23 MALIBU WEST?

The professionals named in the filing: Architect: Urban Analysis & Solutions Consultancy Services; Engineer: SK Consultants & Engineers; Chartered Accountant: N B Sayed & Associates; Chartered Accountant: Jayesh Sanghrajka & Co. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EV 23 MALIBU WEST?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EV 23 MALIBU WEST. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EV 23 MALIBU WEST to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.