ETERNIA

By KRIPA ELITE CORPORATION

RG-MH-06980 · RERA P51800054205 · Last updated on MahaRERA portal: 17 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
46 of 194Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

ETERNIA is a Others project by KRIPA ELITE CORPORATION in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800054205 on 3 Jan 2024. Possession is promised by 31 Dec 2027. 148 of the 194 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameETERNIA
  • TypeOthers
  • Location
    • Building No 89
    • Kannamwar Nagar
    • Kurla
    • Mumbai Suburban
    • 400083
  • Pincode400083
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800054205
  • ReraGenie IDRG-MH-06980

Builder

  • NameKRIPA ELITE CORPORATION
  • Entity typePartnership
  • PartnerPratab Kishinchand Rawlani
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredJan 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jan 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Current status

76%148 of 194 units booked
44.5%Work done, per cost certificate

Figures as on 17 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ETERNIANA0018212194

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

ETERNIA: 60% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.72%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,276 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Kannamwar Nagar Sai Vihar CHS Ltd.HariyaliMumbai Suburban

Approvals and building plan

Sanctioning authorityBuilding Permission Cell, Greater Mumbai / MHADA
Permissible FSI10200.0
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot no 7, CS No 282/6, Vijay Sadan Corner Road, Sion East, Mumbai -400022
Estimated costRs 77.00 cr
Cost incurredRs 34.25 cr
Work done44.48%
BuildingWingEstimatedIncurred
ETERNIANARs 77.00 crRs 34.25 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArcho Consultants
EngineerSandip D Kadam
EngineerAssociated Structural Engineers LLP
Chartered AccountantSU RADHAKRISHNANI & Co
Chartered AccountantMukesh Gurnani
Chartered AccountantVRP & Associates
PartnerRole in project
KRIPA ELITE CORPORATION-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12503171Suyog Suresh PawaskarKRIPA ELITE CORPORATION08/09/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect Certifiicate 01042026.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf17 Apr 2026
Withdrawal Update Form 3File: Form 3 Kripa Elite Corporation 31032026.pdf17 Apr 2026
Withdrawal Update Form 1File: form 1 blg 89 KEC Signed.pdf21 Jan 2026
Withdrawal Update Form 2File: Engineers Certifiacte Form-2.pdf21 Jan 2026
Withdrawal Update Form 3File: Form 3 Kripa Elite Corporation 31122025 Signed.pdf21 Jan 2026
Withdrawal Update Form 1File: Form 1 KEC.pdf18 Oct 2025
Withdrawal Update Form 2File: Form 2 KEC.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3 Kripa Elite Corporation 30092025.pdf18 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Kripa Elite Corporation Signed.pdf14 Oct 2025
Withdrawal Update Form 1File: Form 1.pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2.pdf19 Jul 2025
Withdrawal Update Form 3File: Form 3 Kripa Elite Corporation 30062025.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 KEC.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Kripa Elite Corporation 31032025.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 KEC.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Eternia.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 KEC.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: 89 KN CC.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate eternia 30062024.pdf12 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eternia Engineer Certificate 30092024.pdf12 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Signed Form 5 kripa Elite Corp.pdf30 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30062024.pdf26 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30092024.pdf26 Nov 2024
Building plan approvalFile: Page-1.pdf28 Jul 2024
Building plan approvalFile: Page-2.pdf28 Jul 2024
Building plan approvalFile: Page-3.pdf28 Jul 2024
Building plan approvalFile: Page-4.pdf28 Jul 2024
Building plan approvalFile: Page-5.pdf28 Jul 2024
Building plan approvalFile: Page-6.pdf28 Jul 2024
Building plan approvalFile: Page-7.pdf28 Jul 2024
Building plan approvalFile: Page-8.pdf28 Jul 2024
Building plan approvalFile: Page-9.pdf28 Jul 2024
Building plan approvalFile: Page-10.pdf28 Jul 2024
Building plan approvalFile: Page-11.pdf28 Jul 2024
Building plan approvalFile: Bldg 89 Letter.pdf28 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Page-1.pdf28 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Page-2.pdf28 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Page-3.pdf28 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Page-4.pdf28 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Page-5.pdf28 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Page-6.pdf28 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Page-7.pdf28 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Page-8.pdf28 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Page-9.pdf28 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Page-10.pdf28 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Page-11.pdf28 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Bldg 89 Letter.pdf28 Jul 2024
Other - TechnicalFile: Bldg No 89-CC.pdf8 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure partners.pdf6 Dec 2023
Proforma of Agreement for saleFile: Proforma of Agreement for sale ETERNIA.pdf27 Nov 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Certificate for agreement.pdf27 Nov 2023
Other - LegalFile: partnership deed kripa elite.pdf27 Nov 2023
Layout approvalFile: 89 layout Compress.pdf11 Nov 2023
Copy of Layout Approval (in case of layout)File: 89 layout Compress.pdf11 Nov 2023
CERSAI detailsFile: cersai (1).pdf9 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Compressed.pdf9 Nov 2023
Copy of the legal title reportFile: Title Report 89_compressed.pdf3 Nov 2023
Disclosure of sold/ booked inventoryFile: Unsold sold inventory 89.pdf2 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure 89.pdf2 Nov 2023
Proforma of Allotment letterFile: Proforma of Allotment letter.pdf2 Nov 2023
Deviation Report with respect to Allotment letterFile: Allottment letter deviation report.pdf2 Nov 2023
Building plan approvalFile: IOA 89.pdf31 Oct 2023
PAN CardFile: pan kripa elite.pdf31 Oct 2023
Details of encumbrances concerned to FinanceFile: no Encumbrances.pdf31 Oct 2023
Details of encumbrances concerned to LegalFile: no Encumbrances.pdf31 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: IOA 89.pdf31 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: 89 cc.pdf31 Oct 2023
Declaration about Commencement CertificateFile: Form D.pdf31 Oct 2023
Declaration in FORM BFile: FORM B 89_C.pdf31 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archo Cert form 1.pdf31 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 89.pdf31 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORM A Bank Account 89.pdf31 Oct 2023

How this compares with Mumbai Suburban

76%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ETERNIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kannamwar Nagar6,700+ in Mumbai Suburban

2 kmETERNIACompleted 36Lapsed / revoked 28Other 97Dot size: filed unitsN

Filed coordinates, straight-line distance. 161 registered projects within 2 km.

Builder: KRIPA ELITE CORPORATION

KRIPA ELITE CORPORATION has 3 registrations on MahaRERA, including SERENE and BLISS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if ETERNIA is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ETERNIA?

The registered promoter entity is KRIPA ELITE CORPORATION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ETERNIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ETERNIA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ETERNIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ETERNIA?

The professionals named in the filing: Architect: Archo Consultants; Engineer: Sandip D Kadam; Engineer: Associated Structural Engineers LLP; Chartered Accountant: SU RADHAKRISHNANI & Co; Chartered Accountant: Mukesh Gurnani; Chartered Accountant: VRP & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ETERNIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ETERNIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ETERNIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.