Red flags

  • 1 complaint at RERA Karnataka
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Jun 2021Possession promisedmoved 12 months from the original
1Complaints at RERA Karnatakaon this registration
Jump to the 84 documents Report an error

Estella Maple square Block A is a Residential/Group Housing project by Estella Projects Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/180524/001815 on 24 May 2018. Possession is promised by 30 Jun 2021. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameEstella Maple square Block A
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/180524/001815
  • ReraGenie IDRG-KA-79020

Builder

  • NameEstella Projects Private Limited
  • Entity typeCompany
  • Authorized SignatorySUDHAKAR AGANI
  • Directorsvenkat reddy agani, vijayamm, MOHAN REDDY AGANI, sai kiran hampapuram

Key dates

this monthRegisteredMay 2018First promiseJun 2020Revised toJun 2021

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on24 May 2018
  • Promised completion30 Jun 2021
  • Revised completionRevised to 30 Jun 2021 (originally 30 Jun 2020)
  • Buildings1 building record
  • Documents filed84 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK A---57057

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,237 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 30.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPoornakriti
EngineerMunish Sharma

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/308/PR/220620/001815Jun 2020 → Jun 2021

Reason as filed by the promoterApplied for modification

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
01712/2023-Estella Projects Private Limited16/11/2023

Documents filed84

As listed on the registration, under the names the promoter filed them with; the newest 80 of 84 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/180524/001815 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: 5A.pdf-
Architect Certificate for Work Completion Schedule till DateFile: CERTIFICATE FOR WORK COMPL.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Estella A Block Extention.pdf-
CA Certificate for Funds UtilizationFile: funds utilization certificate-project extension.pdf-
Architect Certificate for Pending Work Completion Schedule.File: CERTIFICATE FOR PENDING WORK.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engg certificate - work pending- for Extension of project .pdf-
CA Certificate for Funds required for Project CompletionFile: funds required certificate-project extension.pdf-
AffidavitFile: Affidavit for Extension of Estella Maple Square A Block.pdf-
Latest Encumbrance CertificateFile: EC.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails-Tower A.xlsx-
Commencement-
Site Plan-
ESTELLA MAPLE SQUARE-Marked approved plan-
RERA - Sale deed declaration-
RERA - Sale deed declaration-
Sale deed & RTC-
AVR -page-001-
AVR -page-001-
RERA - Sale deed declaration-
Marketing-ilovepdf-compressed-
Marketing-ilovepdf-compressed-
EC-
Katha Maple square-SLN-22-
Binder1 Sca-
AVR -page-001-
AVR -page-001-
SKM_C224e17053014450-KSPCBNOC-31-ilovepdf-compressed-
certifi- incor-
AVR -page-001-
AVR -page-001-
SKM_C224e17053014472-AIRPORT Authority of India NOC-28-
SKM_C224e17053014460- BESCOM NOC-29-
AVR -page-001-
AVR -page-001-
AVR -page-001-
SKM_C224e17053014470-BSNL NOC-33-
AVR -page-001-
Unnamed document-
AVR -page-001-
AVR -page-001-
AVR -page-001-
AVR -page-001-
AVR -page-001-
AVR -page-001-
AVR -page-001-
AVR -page-001-
AVR -page-001-
AVR -page-001-
AVR -page-001-
AVR -page-001-
Balance Sheet 2016 - 2017File: Balance sheet 2017.pdf-
Balance Sheet 2015 - 2016File: Balance sheet 2016.pdf-
Balance Sheet 2014 - 2015File: Balance sheet 2015.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Proit and loss 2017.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Profit and loss 2016.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Profit and loss 2015.pdf-
Director's Report 2016 - 2017File: Director rept-17.pdf-
Director's Report 2015 - 2016File: Director report 16.pdf-
Director's Report 2014 - 2015File: Directors Report-15.pdf-
Cash Flow Statement 2016 - 2017File: cash flow 2016 2017.pdf-
Cash Flow Statement 2015 - 2016File: cash flow 2016 2017.pdf-
Auditor's Report 2016 - 2017File: Auditor 2017.pdf-
Auditor's Report 2015 - 2016File: Auditor-16.pdf-
Auditor's Report 2014 - 2015File: Auditor 2015.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR 2017.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITRV-16.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: ITR -15.pdf-
20180521070800-
Prospectus/Brochure-
Advertisement Copy 1-
Tower Excel SheetFile: PRMKARERA1251308PR180524001815.xlsx-
Road cutting permission letter issued by the planning Authority for laying Water supply line, sanitary line, UFile: BESCOM 16-2-16.pdf-
Occupancy CertificateFile: Occupancy Certificate.PDF-
Consent for operation issued by KSPCBFile: KSPCB 21-4-16.pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: BESCOM 16-2-16.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: BESCOM 16-2-16.pdf-
Details of external infrastructure work such as drive way, play area, park, STP and water treatment plant, WheFile: KSPCB 21-4-16.pdf-
Architect certificate for having completed the work(in format no 5)File: Form 5 Architect.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Form 4 CA CC.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Completion Affidavit.PDF-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Estella Maple square Block A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmEstella Maple square BloOther 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 44 registered projects within 2 km.

Builder: Estella Projects Private Limited

Estella Projects Private Limited has 1 registration on RERA Karnataka, including Estella Maple square Block A. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Estella Maple square Block A is delayed beyond 30 Jun 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Estella Maple square Block A?

The registered promoter entity is Estella Projects Private Limited, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Estella Maple square Block A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Estella Maple square Block A?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Estella Maple square Block A?

The professionals named in the filing: Architect: Poornakriti; Engineer: Munish Sharma. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Estella Maple square Block A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Estella Maple square Block A. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Estella Maple square Block A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.