Home / Browse projects / Thane, Maharashtra / Empire Industrial Centrum Phase -7
Empire Industrial Centrum Phase -7
RG-MH-07572 · RERA P51700054980 · Last updated on MahaRERA portal: 22 Apr 2025
Source: official MahaRERA filing
Red flags
- De-registered
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Empire Industrial Centrum Phase -7 is a Mixed project by EMPIRE INDUSTRIES LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700054980 on 21 Feb 2024. Possession is promised by 31 Dec 2029. 1 complaint is on record with the regulator.
At a glance
Project
- NameEmpire Industrial Centrum Phase -7
- TypeMixed
- Location
- MIDC AMBERNATH INDUSTRIAL AREA
- AMBERNATH
- CHIKHLOLI
- Chavindra
- Thane
- 421505
- Pincode421505
- RERA no.P51700054980
- ReraGenie IDRG-MH-07572
Builder
- NameEMPIRE INDUSTRIES LIMITED
- Entity typeCompany
- Other registrations4 more →
- Completed3 of 5
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusDe-registered
- Registered on21 Feb 2024
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings2 building records
- Documents filed55 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B2 - MARATHA | NA | 3 | 0 | 0 | 0 | 0 |
| B1 - CHOLA | NA | 3 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 22 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.
B2 - MARATHA0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B1 - CHOLA0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 22 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 25% |
| Landscaping & Tree Planting | Yes | 20% |
| Street Lighting | Yes | 10% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 25% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed370
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| B2 - MARATHA | 185 | 185 |
| B1 - CHOLA | 185 | 185 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | R V Architects |
| Engineer | Mr. Anil Singh |
| Chartered Accountant | Jatin Motwani & Co. |
| Chartered Accountant | A T Jain & Co. |
| Partner | Role in project |
|---|---|
| EMPIRE INDUSTRIES LIMITED | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12600902 | Yogesh Pratap Singh | EMPIRE INDUSTRIES LIMITED | 19/02/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Jan 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Jan 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Jan 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed55
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 phase-7 B1 dt-31-03-2025.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 phase-7 dt-31-03-2025_compressed.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 phase-7 B1 B2 dt-31-03-2025.pdf | 22 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 Phase-7 Dt 19-03-2025_compressed.pdf | 24 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20241231_B1 BLDG_FORM-1_compressed.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20250123_B2 BLDG_FORM-1_compressed.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: phase-7_compressed.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 PHASE-7 DATE-31-12-2024.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PH7 sept_compressed.pdf | 27 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PH7 sept_compressed.pdf | 27 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate-Phase-7_comp.pdf | 27 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form-3 phase-7 30062024.pdf | 25 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: empire ph 7_compressed.pdf | 22 May 2024 |
| Layout approvalFile: 1_Part_1.pdf | 15 Jan 2024 |
| Layout approvalFile: 1_Part_2.pdf | 15 Jan 2024 |
| Layout approvalFile: 1_Part_3.pdf | 15 Jan 2024 |
| Layout approvalFile: 1_Part_4.pdf | 15 Jan 2024 |
| Layout approvalFile: 1_Part_5.pdf | 15 Jan 2024 |
| Layout approvalFile: 1_Part_6.pdf | 15 Jan 2024 |
| Layout approvalFile: 1_Part_7.pdf | 15 Jan 2024 |
| Layout approvalFile: 1_Part_8.pdf | 15 Jan 2024 |
| Layout approvalFile: 1_Part_9.pdf | 15 Jan 2024 |
| Building plan approvalFile: B1,B2 Approval Letter.pdf | 15 Jan 2024 |
| PAN CardFile: EMPIRE INDUSTRIES PAN CARD.pdf | 15 Jan 2024 |
| Copy of the legal title reportFile: Legal Title Report_Latest.pdf | 15 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal.pdf | 15 Jan 2024 |
| Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal.pdf | 15 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 1_Part_1.pdf | 15 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 1_Part_2.pdf | 15 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 1_Part_3.pdf | 15 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 1_Part_4.pdf | 15 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 1_Part_5.pdf | 15 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 1_Part_6.pdf | 15 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 1_Part_7.pdf | 15 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 1_Part_8.pdf | 15 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 1_Part_9.pdf | 15 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: B1,B2 Approval Letter.pdf | 15 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: B1,B2 Approval Letter.pdf | 15 Jan 2024 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf | 15 Jan 2024 |
| Declaration in FORM BFile: Notazised Form B.pdf | 15 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_B1.pdf | 15 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_B2.pdf | 15 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_B1.pdf | 15 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_B2.pdf | 15 Jan 2024 |
| CERSAI detailsFile: Asset Based Search Report.pdf | 15 Jan 2024 |
| CERSAI detailsFile: Debtor Based Serach Report.pdf | 15 Jan 2024 |
| CERSAI detailsFile: Asset Based Declaration.pdf | 15 Jan 2024 |
| CERSAI detailsFile: Debtor Based Declaration.pdf | 15 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 15 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estates.pdf | 15 Jan 2024 |
| Proforma of Allotment letterFile: Allotment letter.pdf | 15 Jan 2024 |
| Proforma of Agreement for saleFile: Agreement For Sale_compressed.pdf | 15 Jan 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration - Separate Bank Account.pdf | 15 Jan 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report_Allotment Letter.pdf | 15 Jan 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report_Agreement for Sale_compressed.pdf | 15 Jan 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations, which the RERA portal never shows together
- All 55 filed documents as one ZIP, foldered, with a manifest
Keep Empire Industrial Centrum Phase -7 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near AMBERNATH, CHIKHLOLI7,600+ in Thane
MATOSHREE NAGAR EXCELLENCY BLDG SAPPHIRE A AND
MATOSHREE SHELTERS (INDIA) PRIVATE LIMITED
NIDHI RESIDENCY
ADITYA YASH BUILDERS
MIDTOWN B AND C WING
SIDDHIVINAYAK GROUP NX
PATELS LEGACY
RAPID CORPORATION
PATELS ETERNITY
OMKAR INFRASTRUCTURE
Harishree Celestial-1
HARISHREE CREATIONS
See every Thane project, with the district possession charts
Builder: EMPIRE INDUSTRIES LIMITED
EMPIRE INDUSTRIES LIMITED has 5 registrations on MahaRERA, including EMPIRE INDUSTRIAL CENTRUM PHASE - I and Empire Industrial Centrum - Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that Empire Industrial Centrum Phase -7 shows as de-registered on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Empire Industrial Centrum Phase -7 is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Empire Industrial Centrum Phase -7?
The registered promoter entity is EMPIRE INDUSTRIES LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Empire Industrial Centrum Phase -7?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Empire Industrial Centrum Phase -7?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Empire Industrial Centrum Phase -7?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Empire Industrial Centrum Phase -7?
The professionals named in the filing: Architect: R V Architects; Engineer: Mr. Anil Singh; Chartered Accountant: Jatin Motwani & Co.; Chartered Accountant: A T Jain & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Empire Industrial Centrum Phase -7?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.