Home / Browse projects / Bengaluru Urban, Karnataka / ELEGANT TAKT

Registration approved No litigation declared Residential/Group Housing project

ELEGANT TAKT

By ELEGANT BUILDERS AND DEVELOPERS

RG-KA-36323 · RERA PRM/KA/RERA/1251/309/PR/251024/007174 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Dec 2028Possession promisedno revision filed
5 of 18Construction stages donefurthest along: RCC or MS Framed structure, 65%
183 of 310Units unsoldnot recorded sold or booked
1Complaints at RERA Karnatakaon this registration
Jump to the 172 documents Report an error

ELEGANT TAKT is a Residential/Group Housing project by ELEGANT BUILDERS AND DEVELOPERS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/251024/007174 on 25 Oct 2024. Possession is promised by 31 Dec 2028. 127 of the 310 units on this registration are recorded sold or booked, and 5 of 18 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameELEGANT TAKT
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
    • 560097
  • Pincode560097
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/251024/007174
  • ReraGenie IDRG-KA-36323

Builder

  • NameELEGANT BUILDERS AND DEVELOPERS
  • Entity typePartnership Firm
  • GSTIN29AADFE0590L2Z6
  • Authorized SignatoryS JAYANTH
  • Other registrations7 more →
  • Declared earlier projects7 →

Key dates

this monthRegisteredOct 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on25 Oct 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed172 files

Current status

41%127 of 310 units booked
3.7%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower - 1---1700170
Tower - 2---1400140

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 18 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 65%.

Building: 40% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)100%
RCC or MS Framed structure65%
Masonry Construction45%
Plastering inside , outside & Ceiling45%
Joinery: Doors, Windows, Ventilators etc15%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)25%
Railing and Grill fixing25%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes5%
Sewage and Drainage SystemYes5%
Water conservation/rain water harvesting/recharge of ground waterYes5%
Energy managementYes5%
Fire protection and fire safety requirementsYes5%
Solid waste management and disposalYes5%
Emergency Evacuation servicesYes5%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallYes0%
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningYes0%
StaircasesYes10%
LiftsYes10%
Corridor/LobbiesYes10%
Fire escapesYes10%
Common entrance and exit for the building/common portico/foyer/verandahYes10%
BasementYes10%
TerraceYes10%
Outer WallYes10%
Open parking areasYes10%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes10%
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area14,011 sq m
Named landowners1
LandownerVillageDistrict
TAMEEM NAYEEM KHAN--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 213.82 cr
Cost incurredRs 8.00 cr
Spent of the estimate3.74%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 178.64 crRs 6.54 cr
On-site expenditure-Consultants FeesRs 13.72 crRs 34.64 lakh
On-site expenditure-Salaries of workersRs 8.79 crRs 56.47 lakh
On-site expenditure-Site OverheadRs 5.72 crRs 55.31 lakh
Payment of feesRs 4.60 cr-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 1.09 cr-
Payment of cessRs 92.99 lakh-
Payment of taxesRs 32.30 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESIGN DESK - PAUL RAVI JOHN
EngineerCHETHAN KUMAR R
Chartered AccountantN K SATISH

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
00644/2025-ELEGANT BUILDERS AND DEVELOPERS21/04/2025

Documents filed172

As listed on the registration, under the names the promoter filed them with; the newest 80 of 172 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/251024/007174 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: 8) Takt- Form -4, Chartered Accountant (QU) -July 2026 - Sep 2026.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: 8) Takt - Form-5 Architect (QU) - July 2026 - Sep 2026-DD.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: 8) Takt- Form -6, Engineer (QU) - July 2026 to Sep 2026.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: 7) Form -4, Chartered Accountant (QU) - Apr 2026 - June 2026.pdf14 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: 7) Takt - Form-5 Architect (QU) - Apr 2026 - June 2026.pdf14 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: 7) Takt- Form -6, Engineer (QU) - Apr 2026 to June 2026.pdf14 Jul 2026
Q1 2026-27 Water supply and sewage board14 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)14 Jul 2026
Q1 2026-27 KPTCL- BESCOM14 Jul 2026
Q1 2026-27 Fire and Safety14 Jul 2026
Q1 2026-27 Airport Authority of India14 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department14 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Takt-6) Form -4, Chartered Accountant (QU) - Jan 2026 - Mar 2026.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Takt Architect certificate.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: 6) Takt- Form -6, Engineer (QU) - Jan 2026 to Mar 2026.pdf15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q4 2025-26 Fire and Safety15 Apr 2026
Q4 2025-26 Airport Authority of India15 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: 5) Form -4, Chartered Accountant (QU) - Oct 2025 - Dec 2025.pdf15 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: 5) Takt - Form-5 Architect (QU) - Oct 2025 - Dec 2025.pdf15 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: 5) Takt- Form -6, Engineer (QU) - Oct 2025 to Dec 2025.pdf15 Jan 2026
Q3 2025-26 Water supply and sewage board15 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Jan 2026
Q3 2025-26 KPTCL- BESCOM15 Jan 2026
Q3 2025-26 Fire and Safety15 Jan 2026
Q3 2025-26 Airport Authority of India15 Jan 2026
Q3 2025-26 BSNL/Telecommunication Department15 Jan 2026
Declaration for kharab landFile: A- 1) A Karab land Declaration.pdf24 Oct 2024
EC as on dateFile: A - 2) EC - no litigation as on 22-10-2024.pdf24 Oct 2024
EC as on dateFile: A - 2) EC as on 23-10-2024.pdf24 Oct 2024
proforma of allotment letterFile: 3) Allotment Letter.pdf24 Oct 2024
BESCOM NOC RECIEPTFile: 4) BESCOM NOC Paid challan.pdf24 Oct 2024
BWSSB NOC RECIEPTFile: 4) BWSSB NOC Paid Challan.pdf24 Oct 2024
STP DRAWINGFile: 5) ELEGANT TAKT-STP-LOC 18-10-2024 P0-5.pdf24 Oct 2024
LAND COST CALCULATIONFile: 6) Land Cost Details.pdf24 Oct 2024
Balance sheet, profit and loss account & ITR , with UDIN FY 2020-21File: FY 2020-21 - Full With Schedued.pdf9 Oct 2024
Balance sheet, profit and loss account & ITR , with UDIN FY 2021-22File: FY 2021-22 - Full With Schedued.pdf9 Oct 2024
Balance sheet, profit and loss account & ITR , with UDIN FY 2022-23File: FY 2022-23 - Full With Schedued.pdf9 Oct 2024
RERA Annual Statement Hermitage - 2023-24File: CA Certificate - RERA Annual Statement Hermitage - 2023-24.pdf9 Oct 2024
RERA Annual Statement Terraces - 2023-24File: CA Certificate RERA Annual Statement Terraces - 2023-24.pdf9 Oct 2024
S JAYANTH Self Attested KYCFile: S JAYANTH Self Attested KYC.pdf9 Oct 2024
Subramani M Self Attested KYCFile: Subramani M Self Attested KYC.pdf9 Oct 2024
Prabha V Self Attested KYCFile: Prabha V Self Attested KYC.pdf9 Oct 2024
Manjunath S N Self Attested KYCFile: Manjunath S N Self Attested KYC.pdf9 Oct 2024
Rajesh S Self Attested KYCFile: Rajesh S Self Attested KYC.pdf9 Oct 2024
GST certificateFile: GST Registration Copy.pdf9 Oct 2024
Sources Of Fund along with partner Supporting IT retun copyFile: Sources Of Fund -1.pdf9 Oct 2024
Jayanth S Partner Financials Statement 2022-23File: Jayanth S Financials 2022-23.pdf9 Oct 2024
Subramani M Partner Financials Statement 2022-23File: Subramani M Financials 2022-23.pdf9 Oct 2024
Prabha V Partner Financials Statement 2022-23File: Prabha V Financials 2022-23.pdf9 Oct 2024
Manjunath SN Partner Financials Statement 2022-23File: Manjunath S Financials 2022-23.pdf9 Oct 2024
Rajesh S Partner Financials Statement 2022-23File: Rajesh S Financials 2022-23.pdf9 Oct 2024
Unsecured loan detailsFile: Unsecured Loan Details.pdf9 Oct 2024
CA membership registration certificate with self-attestedFile: CA Registration certificate-1.pdf9 Oct 2024
authenticated copy of current year RTCFile: RTC (1).pdf9 Oct 2024
authenticated copy of current year RTCFile: RTC (2).pdf9 Oct 2024
authenticated copy of EC from 1-4-2008 to till dateFile: EC (1).pdf9 Oct 2024
authenticated copy of EC from 1-4-2008 to till dateFile: EC (2).pdf9 Oct 2024
title deed of the current land ownerFile: Titel deed or gift deed1.pdf9 Oct 2024
ADLR Certified survey sketchFile: Doddabettahalli Sketch N.pdf9 Oct 2024
Approved Original Single Plot layout planFile: Approved plan.pdf9 Oct 2024
Approved Original Single Plot layoutFile: Approved plan.pdf9 Oct 2024
Building License from Local Authority BBMPFile: Building license (1).pdf9 Oct 2024
commencement certificateFile: Commencement certificate (1).jpeg9 Oct 2024
commencement certificateFile: Commencement certificate (2).jpeg9 Oct 2024
self attested copy of the Engineer license certificateFile: Engineer License Chethan Kumar.pdf9 Oct 2024
Inventory with brief BHK wise detailsFile: Breakup types of units.pdf9 Oct 2024
proforma of Agreement for SaleFile: RERA Agreement.pdf9 Oct 2024
proforma of the Allotment letterFile: RERA ALLOTMENT LETTER ET.pdf9 Oct 2024
BESCOM NOCFile: BESCOM NOC.pdf9 Oct 2024
BWSSB NOCFile: BWSSB NOC.pdf9 Oct 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
ELEGANT TERRACESV Legacy Rd., Banashankari 3rd Stage, HosakerehalliOngoingSep 2024Not delivered
ELEGANT EXQUISITESY NO 13/1 AND SY NO 12/1/A, SITUATED AT PATTANAGERE VILLAGECompleted-No date filed

How this compares with Bengaluru Urban

41%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep ELEGANT TAKT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmELEGANT TAKTOther 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 26 registered projects within 2 km.

Builder: ELEGANT BUILDERS AND DEVELOPERS

ELEGANT BUILDERS AND DEVELOPERS has 8 registrations on RERA Karnataka, including ELEGANT AURA and ELEGANT EXOTICA. Its filings declare 7 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if ELEGANT TAKT is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ELEGANT TAKT?

The registered promoter entity is ELEGANT BUILDERS AND DEVELOPERS, a partnership firm as per the filing. Its GSTIN 29AADFE0590L2Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ELEGANT TAKT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ELEGANT TAKT?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at ELEGANT TAKT?

The professionals named in the filing: Architect: DESIGN DESK - PAUL RAVI JOHN; Engineer: CHETHAN KUMAR R; Chartered Accountant: N K SATISH. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ELEGANT TAKT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ELEGANT TAKT. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ELEGANT TAKT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.