Home / Browse projects / Bengaluru Urban, Karnataka / AMIGO ALFRESCO
AMIGO ALFRESCO
RG-KA-83950 · RERA PRM/KA/RERA/1251/309/PR/170326/008531 · Last updated on RERA Karnataka portal: 13 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
AMIGO ALFRESCO is a Residential/Group Housing project by AMIGO SHELTERS PVT LTD in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/170326/008531 on 17 Mar 2026. Possession is promised by 31 Dec 2028. 1 of the 110 units on this registration are recorded sold or booked, and 2 of 17 construction stages are filed complete.
At a glance
Project
- NameAMIGO ALFRESCO
- TypeResidential/Group Housing
- Location
- Bengaluru North
- Bengaluru Urban
- 560097
- Pincode560097
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/309/PR/170326/008531
- ReraGenie IDRG-KA-83950
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on17 Mar 2026
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings3 building records
- Documents filed123 files
Current status
Figures as on 13 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | - | - | - | 40 | 0 | 40 |
| B | - | - | - | 40 | 0 | 40 |
| C | - | - | - | 30 | 0 | 30 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 13 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 17 construction stages are filed complete. The stage furthest along is Sub-structure flooring (Parking Floor, at 60%.
Building: 15% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 0% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 60% |
| Retaining wall (All types) | 0% |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 13 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | - |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 5% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | Yes | 0% |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| KAREEM FAYAZ | - | - |
| KAREEM FAYAZ | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 62.84 cr | Rs 1.56 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAJ KUMAR |
| Engineer | ARUN KUMAR H N |
| Chartered Accountant | K R NARASIMHAMURTHY |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed123
As listed on the registration, under the names the promoter filed them with; the newest 80 of 123 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/170326/008531 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Cert sep 2026 Amigo Alfresco.pdf | 13 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Arc Cert - Q2 2026-27 Alfresco.pdf | 13 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Eng Cert - Sep 26 - Amigo Alfresco.pdf | 13 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 13 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 13 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 13 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 13 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 june 2026 AMIGO ALFRESCO.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Arch Certificate Q1 2026-27 Alfresco.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Eng Cert - Amigo Alfresco.pdf | 13 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 13 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 13 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 13 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 13 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Q4 25-26 Alfresco.pdf | 22 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Q4 25-26 Alfresco.pdf | 22 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Q4 25-26 Alfresco.pdf | 22 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 22 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 22 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 22 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 22 Apr 2026 |
| AGREEMENT OF SALEFile: DRAFT AGREEMENT FOR SALE NEW FORMAT KA RERA KB.pdf | 10 Mar 2026 |
| ALLOTMENT LETTERFile: DRAFT ALLOTMENT LETTER NEW FORMAT KA RERA KBR.pdf | 10 Mar 2026 |
| BESCOM AFFIDAVIT AND ACKNOWLEDGEMENTFile: Bescom Alfresco.pdf | 10 Mar 2026 |
| BWSSB NOCFile: BWSSB NOC Alfresco.pdf | 10 Mar 2026 |
| LAND COST AND GUIDANCE VALUEFile: Land Cost and Guidance Value.pdf | 10 Mar 2026 |
| ENGINEER REG CERTIFICATEFile: Engineer Reg Certificate.pdf | 10 Mar 2026 |
| DECLARATION LETTER LAND COSTFile: Declaration letter Land Cost.pdf | 10 Mar 2026 |
| APPROVED SINGLE LAYOUT PLANFile: 1 Revised Single Plot Sanction.pdf | 10 Mar 2026 |
| BUILDING LICENSEFile: 2 BLDG LICENCE PRJ 0923 25 26.pdf | 10 Mar 2026 |
| APPROVED SANCTION PLAN DRAWINGFile: 3 FINAL APPROVED PLAN PRJ 0923 25 26.pdf | 10 Mar 2026 |
| DECLARATION OF COMMENCEMENT CERTIFICATEFile: 4 Declaration for Commencement Certificate.pdf | 10 Mar 2026 |
| DEMARCATION PROPOSED LAND MASTER PLANFile: Demarcation Proposed Land Master Plan.pdf | 10 Mar 2026 |
| DEMARCATION PROPOSED LAND IN VILLAGE MAPFile: 6 VILLAGE MAP.pdf | 10 Mar 2026 |
| AMIGO ALFRESCO KSPCBFile: 7 Amigo Alfresco CFE.pdf | 10 Mar 2026 |
| AMIGO ALFRESCO KSPCBFile: 7 Amigo SEIAA EC.pdf | 10 Mar 2026 |
| DECLARATION KTCP ACTFile: 9 Declaration for KTCP Act.pdf | 10 Mar 2026 |
| FORM 3 DULY SIGNED WITH SELF ATTESTED LICENSEFile: 6 Form 3 & License Self Attested Eng.pdf | 10 Mar 2026 |
| ELABORATED STRUCTURAL STABILITY CERTIFICATE WITH SELF ATTESTED LICENSEFile: 7 Stability Certificate with License Self Attested.pdf | 10 Mar 2026 |
| STP DRAWING WITH SIGNATUREFile: 12 STP Drawing with signature.pdf | 10 Mar 2026 |
| COST OF CONSTRUCTION WITH SIGNATUREFile: 13 Cost of Construction Alfresco Eng.pdf | 10 Mar 2026 |
| SOURCE OF WATER WITH GPSFile: 15 Source of Water with GPS.pdf | 10 Mar 2026 |
| CDP MAPFile: CDP MAP 001.pdf | 10 Mar 2026 |
| BDA SINGLE LAYOUT PLANFile: Letter BDA.pdf | 10 Mar 2026 |
| APPROVED SINGLE LAYOUT PLANFile: 1 Revised Single Plot Sanction.pdf | 26 Feb 2026 |
| BUILDING LICENSEFile: 2 BLDG LICENCE PRJ 0923 25 26.pdf | 26 Feb 2026 |
| SANCTION PLAN DRAWINGFile: 3 FINAL APPROVED PLAN PRJ 0923 25 26.pdf | 26 Feb 2026 |
| DECLARATION COMMENCEMENT CERTIFICATEFile: 4 Declaration for Commencement Certificate.pdf | 26 Feb 2026 |
| DEMARCATION OF PROPOSED LAND IN MASTER PLANFile: Demarcation Proposed Land Master Plan.pdf | 26 Feb 2026 |
| DEMARCATION OF PROPOSED LAND IN VILLAGE MAPFile: 6 VILLAGE MAP.pdf | 26 Feb 2026 |
| KSPCBFile: 7 Amigo Alfresco CFE.pdf | 26 Feb 2026 |
| KSPCBFile: 7 Amigo SEIAA EC.pdf | 26 Feb 2026 |
| DECLARATION KTCP ACTFile: 9 Declaration for KTCP Act.pdf | 26 Feb 2026 |
| FORM 3 DULY SIGNED WITH SELF ATTESTED LICENSEFile: 6 Form 3 & License Self Attested Eng.pdf | 26 Feb 2026 |
| ELABORATED STRUCTURAL STABILITY CERTIFICATE WITH SELF ATTESTED LICENSEFile: 7 Stability Certificate with License Self Attested.pdf | 26 Feb 2026 |
| AFS WITH PROPER PAYMENT PLANFile: 8 DRAFT AGREEMENT FOR SALE NEW FORMAT KA RERA.pdf | 26 Feb 2026 |
| ALLOTMENT LETTER WITH PROPER PAYMENT PLANFile: 9 DRAFT ALLOTMENT LETTER NEW FORMAT KA RERA.pdf | 26 Feb 2026 |
| BESCOM NOV AFFIDAVIT AND ACKNOWLEDGEMENTFile: 10 Bescom Alfresco.pdf | 26 Feb 2026 |
| BWSSB DECLARATION WITH DEMAND NOTEFile: 11 Supply of Water.pdf | 26 Feb 2026 |
| STP DRAWING WITH SIGNATUREFile: 12 STP Drawing with signature.pdf | 26 Feb 2026 |
| COST OF CONSTRUCTION WITH SIGNATUREFile: 13 Cost of Construction Alfresco Eng.pdf | 26 Feb 2026 |
| LAND COST GUIDANCE VALUE SELF ATTESTEDFile: 14 Land Cost Declaration and Guidance Value.pdf | 26 Feb 2026 |
| SOURCE OF WATER WITH GPSFile: 15 Source of Water with GPS.pdf | 26 Feb 2026 |
| RTC, survey 38/3 | - |
| Mutation, survey 38/3 | - |
| Encumbrance Certificate, survey 38/3 | - |
| Conversion/Alienation Order, survey 38/3 | - |
| Sale/Title/Gift Deed, survey 38/3 | - |
| JDA, survey 38/3 | - |
| Khatha, survey 38/3 | - |
| RTC, survey 39/2 | - |
| Mutation, survey 39/2 | - |
| Encumbrance Certificate, survey 39/2 | - |
| Conversion/Alienation Order, survey 39/2 | - |
| Sale/Title/Gift Deed, survey 39/2 | - |
| JDA, survey 39/2 | - |
| Khatha, survey 39/2 | - |
| Registration CertificateFile: 1 Registration cum Incorporation Certificate.pdf | - |
| Memorandum of AssociationFile: MOA Amigo Shelters 2.pdf | - |
| Article of AssociationFile: AOA Amigo Shelters 3.pdf | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| AMIGO PALACIO | 98/4 CHIKKAGUBBI VILLAGE BIDARAHALLI HOBLI BENGALURU EAST TALUK BENGALURU NORTH | Ongoing | Mar 2028 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep AMIGO ALFRESCO on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 12 registered projects within 2 km.
NVG SEATTLE
NVG DEVELOPERS PRIVATE LIMITED
ELEGANT TAKT
ELEGANT BUILDERS AND DEVELOPERS
South Park Phase 1
ESTEEM SOUTH PARKS PRIVATE LIMITED
DHARA NAKSHTHRA
DHARA HOME SPACES
ALPINE PYRAMID - IRIS
ALPINE HOUSING DEVELOPMENT CORPORATION LIM
SUMUK SQUARE
SUMUK PROJECTS
See every Bengaluru Urban project, with the district possession charts
Builder: AMIGO SHELTERS PVT LTD
AMIGO SHELTERS PVT LTD has 3 registrations on RERA Karnataka, including AMIGO PALACIO and AMIGO ALFRESCO. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if AMIGO ALFRESCO is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of AMIGO ALFRESCO?
The registered promoter entity is AMIGO SHELTERS PVT LTD, a company as per the filing. Its CIN U70102KA2010PTC053488 and GSTIN 29AAICA4855A1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in AMIGO ALFRESCO?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at AMIGO ALFRESCO?
The professionals named in the filing: Architect: RAJ KUMAR; Engineer: ARUN KUMAR H N; Chartered Accountant: K R NARASIMHAMURTHY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AMIGO ALFRESCO?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback