ALPINE PYRAMID - IRIS
By ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED
RG-KA-51587 · RERA PRM/KA/RERA/1251/309/PR/140525/007742 · Last updated on RERA Karnataka portal: 8 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
ALPINE PYRAMID - IRIS is a Residential/Group Housing project by ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/140525/007742 on 14 May 2025. Possession is promised by 30 Apr 2028. 53 of the 109 units on this registration are recorded sold or booked, and 4 of 18 construction stages are filed complete.
At a glance
Project
- NameALPINE PYRAMID - IRIS
- TypeResidential/Group Housing
- Location
- Bengaluru North
- Bengaluru Urban
- 560097
- Pincode560097
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/309/PR/140525/007742
- ReraGenie IDRG-KA-51587
Builder
- NameALPINE HOUSING DEVELOPMENT CORPORATION LIMITED
- Entity typeCompany
- CINL85110KA1992PLC013174
- GSTIN29AACCA4839Q1Z0
- Authorized SignatorySYED ABDUL RASHEED
- Managing DirectorSYED ABDUL KABEER
- DirectorsSYED ABDUL KABEER, SYED ABDUL RASHEED
- Project HeadMANJUNATH B PAWAR
- Other registrations4 more →
- Declared earlier projects5 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on14 May 2025
- Promised completion30 Apr 2028
- Revised completionNone
- Buildings1 building record
- Documents filed201 files
Current status
Figures as on 8 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| IRIS | - | - | - | 109 | 0 | 109 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 8 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 18 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 75%.
Building: 31% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 50% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 75% |
| Masonry Construction | 15% |
| Plastering inside , outside & Ceiling | 10% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 8 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership5
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Deeksha Ramanna Anand D/O Late B M Ramanna | - | - |
| Sunitha w/O Shivakumar | - | - |
| K Rajanna | - | - |
| K G Venkatesh and Family | - | - |
| K Rajanna | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 34.00 cr | Rs 13.99 cr |
| Administrative Costs | Rs 2.26 cr | Rs 69.54 lakh |
| On-site expenditure-Salaries of workers | Rs 1.70 cr | Rs 33.78 lakh |
| On-site expenditure-Consultants Fees | - | Rs 82.86 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ARCHITECTURE PARADIGM PVT LTD |
| Engineer | GUNASHEEL KARANTH KRISHNA |
| Chartered Accountant | MASARATH AHMED SHERIFF |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed201
As listed on the registration, under the names the promoter filed them with; the newest 80 of 201 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/140525/007742 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Alpine Pyd Iris Form 4 Q2 30290206 R.pdf | 8 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Alpine Pyd Iris Form 5 Q2 30092026 R.pdf | 8 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Alpine Pyd Iris Form 6 Q2 30092026 R.pdf | 8 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 8 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 8 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 8 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 8 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 8 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Alp Pyd Iris Form4 Q1 June26.pdf | 9 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Alp Pyd Iris Form5 Q1 June26.pdf | 9 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Alp Pyd Iris Form 6 Q1 June26.pdf | 9 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 9 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 9 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 9 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 9 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 9 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Alp Pyd Iris Form 4 Q4 31032026.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Alp Pyd Iris Form5 Q4 31032026.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Alp Pyd Iris Form 6 Q4 31032026.pdf | 13 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 13 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 13 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 13 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 13 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 13 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Alp Pyd Iris CA Form 4 Q3 Dec25.pdf | 7 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Alp Pyd Iris Architech Form 5 Q3 Dec-25.pdf | 7 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Alp Pyd Iris Engineeering Form 6 Dec -25.pdf | 7 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 7 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 7 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 7 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 7 Jan 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 7 Jan 2026 |
| Query replyFile: Query reply.pdf | 5 May 2025 |
| EC all Sy NoFile: 1 EC all Sy No.pdf | 5 May 2025 |
| Alpine Pyramid Iris Block Sharing Agreement LATESTFile: 2 Alpine Pyramid Iris Block Sharing Agreement LATEST.pdf | 5 May 2025 |
| Joint KathaFile: 3 joint katha.pdf | 5 May 2025 |
| katha extract jointFile: 3 katha extract joint.pdf | 5 May 2025 |
| AkarbandFile: 4 Akarband Pyramid.pdf | 5 May 2025 |
| Alp BS 2021-22File: Alp BS 2021-22.pdf | 16 Apr 2025 |
| BS with Shedules 22-23File: BS with Shedules 22-23.pdf | 16 Apr 2025 |
| BS with Shedules 23-24File: BS with Shedules 23-24.pdf | 16 Apr 2025 |
| PL with Shedules 21-22File: PL with Shedules 21-22.pdf | 16 Apr 2025 |
| PL with Shedules 22-23File: PL with Shedules 22-23.pdf | 16 Apr 2025 |
| PL with Shedules 23-24File: PL with Shedules 23-24.pdf | 16 Apr 2025 |
| Audit Report 202324 (1)File: Audit Report 202324 (1).pdf | 16 Apr 2025 |
| CASHFLOW2023-24File: CASHFLOW2023-24.pdf | 16 Apr 2025 |
| Director Report 202324 (1)File: Director Report 202324 (1).pdf | 16 Apr 2025 |
| Audit Report 202223 (1)File: Audit Report 202223 (1).pdf | 16 Apr 2025 |
| Cash flow 2022-23File: Cash flow 2022-23.pdf | 16 Apr 2025 |
| Director Report 202223 (1)File: Director Report 202223 (1).pdf | 16 Apr 2025 |
| Cashflow 2021-22File: Alp CF 2021-22.pdf | 16 Apr 2025 |
| Director Report 202122 (1)File: Director Report 202122 (1).pdf | 16 Apr 2025 |
| Audit Report 202122 (1)File: Audit Report 202122 (1).pdf | 16 Apr 2025 |
| rtc pyramid 13-Mar-2025 12-50-49File: rtc pyramid 13-Mar-2025 12-50-49.pdf | 16 Apr 2025 |
| Sy No 209 3 24-25File: Sy No 209 3 24-25.pdf | 16 Apr 2025 |
| Sy No 209 4 24-25File: Sy No 209 4 24-25.pdf | 16 Apr 2025 |
| Sy No 209 6 24-25File: Sy No 209 6 24-25.pdf | 16 Apr 2025 |
| Sy No 209 7 24-25File: Sy No 209 7 24-25.pdf | 16 Apr 2025 |
| Sy No 209 8 24-25File: Sy No 209 8 24-25.pdf | 16 Apr 2025 |
| MR Endosement PydFile: 5 MR Endosement Pyd.jpeg | 16 Apr 2025 |
| MR of Sy no 209-3File: 5 MR of Sy no 209-3.pdf | 16 Apr 2025 |
| MRFile: 5 MR.pdf | 16 Apr 2025 |
| EC all SyNoFile: 6 EC all SyNo.pdf | 16 Apr 2025 |
| conversion order 209-3File: 7 conversion order 209-3.pdf | 16 Apr 2025 |
| Alpine Pyramid Iris Block Sharing Agreement LATESTFile: 8 Alpine Pyramid Iris Block Sharing Agreement LATEST.pdf | 16 Apr 2025 |
| joint kathaFile: 9 joint katha.pdf | 16 Apr 2025 |
| katha extract jointFile: 9 katha extract joint.pdf | 16 Apr 2025 |
| Alpine Pyd Iris Affidavit for Kharab B LandFile: 11 Alpine Pyd Iris Affidavit for Kharab B Land.pdf | 16 Apr 2025 |
| mother conversion orderFile: 12 mother conversion order.pdf | 16 Apr 2025 |
| ADLR PydFile: 14 ADLR Pyd.pdf | 16 Apr 2025 |
| Pyramid Legal opinionFile: 13 Pyramid Legal opinion.pdf | 16 Apr 2025 |
| ADLR PydFile: 14 ADLR Pyd.pdf | 16 Apr 2025 |
| Original Site planFile: OriginalSite Plan.pdf | 16 Apr 2025 |
| Section planFile: Section plan.pdf | 16 Apr 2025 |
| Original licence alpineFile: final approved licence alpine.pdf | 16 Apr 2025 |
| final approved drawing alpineFile: final approved drawing alpine.pdf | 16 Apr 2025 |
| 1st to 10th floor planFile: 1st to 10th floor plan.pdf | 16 Apr 2025 |
| 11th and Terrace FloorFile: 11th and Terrace Floor.pdf | 16 Apr 2025 |
| Basement planFile: Basement plan.pdf | 16 Apr 2025 |
| ElevationFile: elevation.pdf | 16 Apr 2025 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| ALPINE PYRAMID - EFGH | KHATHA NO.1554/2093,4,6,8 KODIGEHALLI VILLAGE, YELAHANKA HOBLI BANGALORE NORTH TALUK | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep ALPINE PYRAMID - IRIS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 46 registered projects within 2 km.
NVG SEATTLE
NVG DEVELOPERS PRIVATE LIMITED
ELEGANT TAKT
ELEGANT BUILDERS AND DEVELOPERS
South Park Phase 1
ESTEEM SOUTH PARKS PRIVATE LIMITED
DHARA NAKSHTHRA
DHARA HOME SPACES
AMIGO ALFRESCO
AMIGO SHELTERS PVT LTD
SUMUK SQUARE
SUMUK PROJECTS
See every Bengaluru Urban project, with the district possession charts
Builder: ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED
ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED has 5 registrations on RERA Karnataka, including ALPINE PYRAMID - IRIS and ALPINE PYRAMID EFGH. Its filings declare 5 earlier projects, 5 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if ALPINE PYRAMID - IRIS is delayed beyond 30 Apr 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of ALPINE PYRAMID - IRIS?
The registered promoter entity is ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED, a company as per the filing. Its CIN L85110KA1992PLC013174 and GSTIN 29AACCA4839Q1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in ALPINE PYRAMID - IRIS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at ALPINE PYRAMID - IRIS?
The professionals named in the filing: Architect: ARCHITECTURE PARADIGM PVT LTD; Engineer: GUNASHEEL KARANTH KRISHNA; Chartered Accountant: MASARATH AHMED SHERIFF. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ALPINE PYRAMID - IRIS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback