Home / Browse projects / Thane, Maharashtra / EKATVA ONYX

Registration lapsed No litigation declared Commercial project

EKATVA ONYX

By VERTICAL REALTORS PRIVATE LIMITED

RG-MH-36805 · RERA P51700047272 · Last updated on MahaRERA portal: 22 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
6 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 50%
17 of 142Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

EKATVA ONYX is a Commercial project by VERTICAL REALTORS PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700047272 on 17 Oct 2022. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 6 months from the original filing. 125 of the 142 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameEKATVA ONYX
  • TypeCommercial
  • Location
    • ROAD NO 16A
    • WAGLE ESTATE THANE WEST
    • Thane (M Corp.)
    • Thane
    • 400604
  • Pincode400604
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700047272
  • ReraGenie IDRG-MH-36805

Builder

  • NameVERTICAL REALTORS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsHIREN HANSRAJ CHHEDA, MAYUR AMARSHI BAUVA, MAYUR AMARSHI BAUVA, HIREN HANSRAJ CHHEDA

Key dates

4 months past promisethis monthRegisteredOct 2022First promiseDec 2025Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on17 Oct 2022
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed97 files

Current status

88%125 of 142 units booked
75.6%Work done, per cost certificate

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EKATVA ONYXNA13130142142

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 50%.

EKATVA ONYX: 62% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.35%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes0%
Street LightingYes15%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes25%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed77

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots77
Closed/Covered75
Open Space2

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,314 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Feb 2026

Approvals and building plan

Sanctioning authorityMAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION
Permissible FSI6428.56
Proposed, not sanctioned5,285 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHIVAJI NAGAR WAGLE ESTATE THANE WEST
Estimated costRs 31.02 cr
Cost incurredRs 23.45 cr
Work done75.6%
BuildingWingEstimatedIncurred
EKATVA ONYXNARs 20.18 crRs 19.00 cr
-NARs 10.84 crRs 4.45 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAPICES STUDIO PVT LTD
EngineerAJAY MAHALE & ASSOCIATES
Chartered AccountantCA Rohit Savla
Chartered AccountantCA Mohit Kishinchandani
Chartered AccountantVikram Viresh Bhate
Chartered AccountantPooja Ramsurat Prajapati
PartnerRole in project
VERTICAL REALTORS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700019327Dec 2025 → Jun 2026

Reason as filed by the promoterSince the construction area has been increased for which correction module has already been filed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 Q4- FY 2025-26.pdf22 Jun 2026
Withdrawal Update Form 2File: VRPL Form-2 Q4 25-26.pdf22 Jun 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 -Q4-FY 2025-26.pdf22 Jun 2026
Withdrawal Update Form 1File: Form-1 Q3- FY 2025-26.pdf20 Jun 2026
Withdrawal Update Form 1File: Form-1 Q3- FY 2025-26.pdf20 Jun 2026
Withdrawal Update Form 2File: VRPL Form-2 Q3 25-26.pdf20 Jun 2026
Withdrawal Update Form 2File: VRPL Form-2 Q3 25-26.pdf20 Jun 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 Q3- FY 2025-26.pdf20 Jun 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 Q3- FY 2025-26.pdf20 Jun 2026
Withdrawal Update Form 1File: Form-1 Q2- FY 2025-26.pdf12 Jun 2026
Withdrawal Update Form 2File: Form-2 Q2 2025-26.pdf12 Jun 2026
Withdrawal Update Form 3File: Q2- FY 2025-26- Withdrawal Application Form 3.pdf12 Jun 2026
Withdrawal Update Form 1File: Form-1 30-06-2025.pdf10 Jun 2026
Withdrawal Update Form 2File: Form-2 Q1 2025-26.pdf10 Jun 2026
Withdrawal Update Form 3File: Q1- FY 2025-26- Withdrawal Application Form3.pdf10 Jun 2026
Form 1File: FORM-1 VRPL Q2.pdf5 Jun 2026
Form 2File: Form-2 Q2 2024-25.pdf5 Jun 2026
Form 3File: FORM-3 VRPL Q2.pdf5 Jun 2026
Disclosure of Sold and Booked InventoryFile: Discloure of Sold Unsold Booked Inventory Q2.pdf5 Jun 2026
Form 1File: Form-1 VRPL Q3.pdf5 Jun 2026
Form 2File: Form-2 Q3 2024-25.pdf5 Jun 2026
Form 3File: Final Form-3 - Q3- FY 2024-25.pdf5 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q3.pdf5 Jun 2026
Form 1File: VRPL Form-1 Q4 24-25.pdf5 Jun 2026
Form 2File: Form-2 Q4 2024-25.pdf5 Jun 2026
Form 3File: Form 3 Q4 FY 2024-25 signed.pdf5 Jun 2026
Disclosure of Sold and Booked InventoryFile: VRPL Disclosure of Sold Unsold Inventory Q4 24-25.pdf5 Jun 2026
Form 1File: FORM-1 30062024.pdf13 Feb 2026
Form 2File: Form-2 VRPL Q1.pdf13 Feb 2026
Form 3File: Form-3 19-04-2025 signed.pdf13 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Booked Inventory Q1.pdf13 Feb 2026
Form 5 (FY 2023-2024)File: FINAL VRPL-Form 5 FY 23-24.pdf13 Feb 2026
Form 5 (FY 2022-2023)File: Form-5 FY 2022-23.pdf13 Feb 2026
Form 5 (FY 2024-2025)File: Signed VRPL Form-5 24-25.pdf10 Feb 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 VRPL Q3.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form-3 - Q3- FY 2024-25.pdf1 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf1 Feb 2025
Building plan approvalFile: 2024-12-11-SANCTIONED PLANS-1.pdf17 Jan 2025
Building plan approvalFile: 2024-12-11-SANCTIONED PLANS-2-3.pdf17 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: 2024-12-11- CC LETTER.pdf17 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 2024-12-11-SANCTIONED PLANS-1.pdf17 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 2024-12-11-SANCTIONED PLANS-2-3.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 VRPL Q2.pdf27 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final FORM-3 VRPL Q2.pdf27 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final FORM-3 VRPL Q2.pdf27 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FINAL VRPL-Form 5 FY 23-24.pdf22 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 30062024.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1CA Certificate -Form-3.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 VRPL Q1.pdf18 Nov 2024
Building plan approvalFile: 2023-12-26_APPROVED CC DRAWINGS_compressed.pdf6 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 2023-12-26_APPROVED CC DRAWINGS_compressed.pdf6 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24.pdf4 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31032024.pdf3 May 2024
Disclosure of sold/ booked inventoryFile: Booked Sold_Unsold Inventory Upto 5 Floor.pdf3 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31032024.pdf20 Apr 2024
Declaration in FORM BFile: Form B Affidavit 3112024.pdf20 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: 2023-12-26_CC LETTER_compressed.pdf20 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31122023 e.pdf20 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31122023.pdf20 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold_Unsold Invetory.pdf20 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ekatva Onyx_Form 3 Certificate 31122023 signed.pdf20 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Engineer Certifiacte for Qulity Assurance.pdf27 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 2023-09-30.pdf16 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engineers Certificate.pdf16 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory_vertical.pdf16 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory_vertical.pdf16 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 CA Certificate_compressed-compressed.pdf16 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form5.pdf10 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3 CA_certificate_10022023_compressed.pdf15 Feb 2023
Disclosure of sold/ booked inventoryFile: Booked Inventory.pdf14 Feb 2023
Proforma of Agreement for saleFile: Draft Rera Agreement 01.pdf10 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2023-02-07 RERA CERTIFICATE FORM -1 _compressed.pdf8 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: 2023-01-13 A-280 APPROVED CC LETTER.pdf18 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A HHC.pdf18 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure MAB.pdf18 Jan 2023
Proforma of Agreement for saleFile: Draft Rera Agreement 01.pdf18 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Deviation reportwith model copy of agreement meged.pdf11 Oct 2022
Other - LegalFile: Final Rera Dreaft Agreement Pdf format.pdf11 Oct 2022
CERSAI detailsFile: CERSAI_Search_Report_200247788656_For_Asset_Based_Search_21_09_2022_18_16_00_940.pdf21 Sep 2022

How this compares with Thane

88%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 6 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EKATVA ONYX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAGLE ESTATE THANE WEST7,600+ in Thane

2 kmEKATVA ONYXCompleted 78Lapsed / revoked 41Other 117Dot size: filed unitsN

Filed coordinates, straight-line distance. 236 registered projects within 2 km.

Builder: VERTICAL REALTORS PRIVATE LIMITED

VERTICAL REALTORS PRIVATE LIMITED has 1 registration on MahaRERA, including EKATVA ONYX. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that EKATVA ONYX shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if EKATVA ONYX is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EKATVA ONYX?

The registered promoter entity is VERTICAL REALTORS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EKATVA ONYX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EKATVA ONYX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EKATVA ONYX?

The professionals named in the filing: Architect: APICES STUDIO PVT LTD; Engineer: AJAY MAHALE & ASSOCIATES; Chartered Accountant: CA Rohit Savla; Chartered Accountant: CA Mohit Kishinchandani; Chartered Accountant: Vikram Viresh Bhate; Chartered Accountant: Pooja Ramsurat Prajapati. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EKATVA ONYX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EKATVA ONYX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EKATVA ONYX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.