Home / Browse projects / Bengaluru Urban, Karnataka / DS MAX STAVAM NEST

Registration approved No litigation declared Residential/Group Housing project

DS MAX STAVAM NEST

By DS Max Properties Private Limited

RG-KA-51127 · RERA PRM/KA/RERA/1251/472/PR/180722/005079 · Last updated on RERA Karnataka portal: 14 Jul 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jun 2026Possession promisedno revision filed
15 of 18Construction stages donefurthest along: Painting, 0%
36 of 80Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 108 documents Report an error

DS MAX STAVAM NEST is a Residential/Group Housing project by DS Max Properties Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/472/PR/180722/005079 on 18 Jul 2022. Possession is promised by 30 Jun 2026. 44 of the 80 units on this registration are recorded sold or booked, and 15 of 18 construction stages are filed complete.

At a glance

Project

  • NameDS MAX STAVAM NEST
  • TypeResidential/Group Housing
  • Location
    • Yelahanka
    • Bengaluru Urban
    • 560064
  • Pincode560064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/472/PR/180722/005079
  • ReraGenie IDRG-KA-51127

Builder

  • NameDS Max Properties Private Limited
  • Entity typeCompany
  • CINU70102KA2007PTC041508
  • GSTIN29AACCD6168M1Z3
  • Authorized SignatoryShiva Shankar Chikkeri
  • Managing DirectorK V SATISH
  • DirectorsK V SATISH, S P Dayanand, Asha Satish
  • Project HeadS HIMAVANTHA REDDY
  • Other registrations38 more →
  • Declared earlier projects31 →

Key dates

this monthRegisteredJul 2022PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on18 Jul 2022
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed108 files

Current status

55%44 of 80 units booked
0.1%Of the estimated cost spent so far

Figures as on 14 Jul 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
STAVAM NEST---80080

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 18 construction stages are filed complete. The stage furthest along is Painting, at 0%.

Building: 83% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)100%
RCC or MS Framed structure100%
Masonry Construction100%
Plastering inside , outside & Ceiling100%
Joinery: Doors, Windows, Ventilators etc100%
Basic work of Water supply, Sanitary and Electrification100%
Dadoing, Skirting, Flooring, Tiles work (All types)100%
Railing and Grill fixing100%
Electrification, Water supply and Sanitary Finishing100%
Painting0%
Fire prevention and fire fighting fitting and fixture with network100%
Weather Proof work(tile,concrete)100%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes100%
Sewage and Drainage SystemYes100%
Water conservation/rain water harvesting/recharge of ground waterYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes100%
Storm water drainsYes100%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes100%
Parks & Tree plantingYes100%
Street LightingNoNot applicable
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseNoNot applicable
Community HallYes0%
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes100%
LiftsYes100%
Corridor/LobbiesYes100%
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes100%
BasementNoNot applicable
TerraceYes100%
Outer WallYes100%
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffYes100%
Water conservation and renewable energyYes100%
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,091 sq m
Named landowners2
LandownerVillageDistrict
Madhubabu M--
Madhubabu M--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 14.19 cr
Cost incurredRs 1.68 lakh
Spent of the estimate0.12%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 11.19 crRs 1.62 lakh
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)Rs 3.00 crRs 5,403

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAKASH S HATHWAR
EngineerSwarupananda Goud K S
Chartered AccountantK Somanatham

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed108

As listed on the registration, under the names the promoter filed them with; the newest 80 of 108 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/472/PR/180722/005079 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Stavam Nest Ack_project_ Completion.png14 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Stavam Nest Ack_project_ Completion.png14 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Stavam Nest Ack_project_ Completion.png14 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)14 Jul 2026
Q1 2026-27 KPTCL- BESCOM14 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Stavam Nest_0002.pdf13 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5,Q4,2025-26,DS Max Stavam Nest.pdf13 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Stavam Nest_ CE Mar 26.pdf13 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)13 Apr 2026
Q4 2025-26 KPTCL- BESCOM13 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Stavam Nest_0001.pdf12 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5, Q3 2025-26,DS Max Stavam Nest.pdf12 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Stavam Nest CE.pdf12 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)12 Jan 2026
Q3 2025-26 KPTCL- BESCOM12 Jan 2026
Affidavit for Non-Litigation Details- With JDAFile: 1 Affidavit for Non-Litigation Details- With JDA.pdf15 Jul 2022
Village Map HarohalliFile: 2 Village Map Harohalli.pdf15 Jul 2022
CLARIFICATION FOR NON PRODUCTION OF SINGLE LAYOUTFile: 3 CLARIFICATION FOR NON PRODUCTION OF SINGLE LAYOUT.pdf15 Jul 2022
FINAL PLAN PRJ_0181_22-23File: 4 FINAL PLAN PRJ_0181_22-23.pdf15 Jul 2022
Architect LicenceFile: 5 Architect Licence.pdf15 Jul 2022
BDA SENSITIVE ZONE (25-02-2022)File: 6 BDA SENSITIVE ZONE (25-02-2022).pdf15 Jul 2022
BWSSB NOC with Fee paid receiptFile: 7 BWSSB NOC with Fee paid receipt.pdf15 Jul 2022
BESCOM NOC with fee paid receiptFile: 8 BESCOM NOC with fee paid receipt.pdf15 Jul 2022
RTC, survey 126/7-
Mutation, survey 126/7-
Encumbrance Certificate, survey 126/7-
Conversion/Alienation Order, survey 126/7-
Sale/Title/Gift Deed, survey 126/7-
JDA, survey 126/7-
Khatha, survey 126/7-
RTC, survey 126/7-
Mutation, survey 126/7-
Encumbrance Certificate, survey 126/7-
Conversion/Alienation Order, survey 126/7-
Sale/Title/Gift Deed, survey 126/7-
JDA, survey 126/7-
Khatha, survey 126/7-
Registration CertificateFile: Certificate of Incorporation.pdf-
Organization StructureFile: DS-Max Properties Pvt Ltd - Organisation Chart.pdf-
Certificate issued by CA Form 1File: Stavam Nest Form 1.pdf-
Certificate issued by Architect Form 2File: Architect Certificate.pdf-
Certificate issued by Engineer Form 3File: Engineer Certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: 1 Affidavit for Non-Litigation Details- With JDA.pdf-
Certificate from Chartered AccountFile: Stavam Nest Form 1.pdf-
Balance Sheet 2020 - 2021File: Balance Sheet 2020-21.pdf-
Balance Sheet 2019 - 2020File: Balance sheet_2019-20.pdf-
Balance Sheet 2018 - 2019File: Balance sheet_2018-19.pdf-
Audited Profit and Loss Statement 2020 - 2021File: Profit and Loss 2020-21.pdf-
Audited Profit and Loss Statement 2019 - 2020File: Profit and loss_2019-20.pdf-
Audited Profit and Loss Statement 2018 - 2019File: Profit and loss_2018-19.pdf-
Director's Report 2019 - 2020File: Directors Report 2019-20.pdf-
Director's Report 2018 - 2019File: Directors report_2018-19.pdf-
Cash Flow Statement 2020 - 2021File: Financial documents.pdf-
Cash Flow Statement 2019 - 2020File: Cashflow_2019-20.pdf-
Auditor's Report 2019 - 2020File: Audit report_2019-20.pdf-
Auditor's Report 2018 - 2019File: AUDIT REPORT_2018-19.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR FY 2020-21.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: IT Returns_2019-20.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: IT Returns 2018-19.pdf-
BBMP License-
BESCOM NOC-
BWSSB NOC-
FINAL PLAN PRJ_0181_22-23-
FINAL PLAN PRJ_0181_22-23-
FINAL PLAN PRJ_0181_22-23-
Project Specification-
FINAL PLAN PRJ_0181_22-23-
Project Specification-
FINAL PLAN PRJ_0181_22-23-
FINAL PLAN PRJ_0181_22-23-
LEGAL OPINION OF RAJEEVI SHYAM (04-02-2022)-
JDA and GPA-
AGREEMENT DRAFT Stavam Nest-
Allotment LetterSTAVAM NEST-
Form B Affidavit-
Notarized Affidavit for 3(1) Voliation(1)-
Joint Affidavit from Promoter and Landowner-

Promoter's earlier projects23

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

13 not delivered by the promised date2 under way, not due yet8 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
DS MAX SKY SHUBHAMSY NO: 118/1,118/2, situated at Kithaganur village, Kithaganur grama panchayath, Bidarahalli, Hobli, Bangalore East TalukOngoingMar 2027Not due yet
DS MAX SPOORTHIKatha No:271 (Sy. No. 76/6), situated at S Medahalli Village , Sarjapura Hobli, Anekal Taluk, , Bangalore Urban District , Anekal , Bengaluru Urban, Karnataka - 562125OngoingDec 2026Not due yet
DS MAX STAVAMSy No.107/3, 107/4 & 107/5, Harohalli Village, Yelahanka Hobli Bangalore - 560064OngoingMar 2025Not delivered
DS MAX SAHARASy. No. 72, New Sy No. 183, at Chikkanagamangala Village, Sarjapura Hobli, Anekal Taluk BangaloreOngoingDec 2024Not delivered
DS-MAX SKY SUPREMESy No-27/2 & 27/3, Valagerahalli Village, Kengeri Hobli, Bangalore South TalukOngoingSep 2024Not delivered
DS MAX SONATA NESTKatha No.14, SY No.28/3;28/4;28/5;28/6, Chikkasandra Village, Yeshwantpur HOBLIOngoingJun 2024Not delivered
DS MAX SOVEREIGNSY No, 53, HALEHALLI Village, Kithaganur, BIDARA HALLI HobliOngoingMar 2024Not delivered
SANGAM GRANDSy. No.92/3,92/4,92/5 & 92/6 Seegehalli Village, Bidarahalli Hobli, Bangalore East TalukOngoingDec 2023Not delivered
SANGAM GRANDSy. No.92/3,92/4,92/5 & 92/6 Seegehalli Village, Bidarahalli Hobli, Bangalore East TalukOngoingDec 2023Not delivered
DS MAX SYNERGYSy. No.69/1 Agrahara Village, Yalahanka Hobli, Bangalore North TalukOngoingSep 2023Not delivered
DS MAX SYNERGYSy. No.69/1 Agrahara Village,, Yalahanka Hobli,Bangalore North TalukOngoingSep 2023Not delivered
DS MAX SKY CLASSICconverted land property bearing Sy.No.7/2, which measuring 3 acres, out of 3 acres 13 guntas, situated at Thirupalya Village, Jigani Hobli, Anekal Taluk,, converted land property bearing Sy.No.7/2, which measuring 3 acres, out of 3 acres 13 guntas, situated at Thirupalya Village, Jigani Hobli, Anekal Taluk,OngoingSep 2023Not delivered
DS MAX SUNWORTHSy.No.112/2 Kithagnur Village, Bidarahalli Hobli, Bangalore East Taluk BangaloreOngoingJun 2023Not delivered
Sankalp ManorSy. No. 7 , Kalkere Village, K R Puram Hobli, BangaloreOngoingMar 2023Not delivered
Sankalp ManorSy. No. 7 , Kalkere Village, K R Puram Hobli, BangaloreOngoingMar 2023Not delivered
DSMAX SKYCITYundeveloped converted land property bearing Sy. No. 65, which measuring 2 acre 34 guntas, out of 3 acre 09½ guntas, situated at Chokkanahalli Village, Yelahanka Hobli, Bangalore North Taluk Total 228 Flats Bangalore 560064, undeveloped converted land property bearing Sy. No. 65, which measuring 2 acre 34 guntas, out of 3 acre 09½ guntas, situated at Chokkanahalli Village, Yelahanka Hobli, Bangalore North Taluk Total 228 Flats Bangalore 560064Completed-No date filed
DS-MAX STAR LINEDoddanagamangala, Begur (Hobli), BangaloreCompleted-No date filed
DS MAX SkyscapeSy. No. 38/1, at Rampura Village, , Bidarahalli Hobli, Bangalore East Taluk, BangaloreCompleted-No date filed
DS MAX STARRYConverted land property bearing Old Sy.No.76, New Sy. No.76/2, which measuring 1 acre 02guntas, situated at Maragondanahalli Village,Jigani Hobli, Anekal Taluk,, Converted land property bearing Old Sy.No.76, New Sy. No.76/2, which measuring 1 acre 02guntas, situated at Maragondanahalli Village,Jigani Hobli, Anekal Taluk,Completed-No date filed
DS MAX SPLENDIDBBMP Khata No 14/1, Sy No 65 Herohalli Village,, Herohalli Sub zone, Rajarajeshwari Nagar Zone, Ward No 72, Bengaluru.Completed-No date filed
DS MAX SAVERAproperty bearing Sy. No. 104/2, 104/3,104/4, Uttarahalli Village, Uttarahalli Hobli, Bangalore South TalukCompleted-No date filed
DS MAX SATELLITESY.NO - 223/5,223/6,, Kengeri, BANGALORECompleted-No date filed
DS - Max Sparkle NestSy No.28/1, K Narayanapura Village,, K R Puram Hobli, Bangalore East Taluk.Completed-No date filed

How this compares with Bengaluru Urban

55%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep DS MAX STAVAM NEST on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmDS MAX STAVAM NESTOther 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 9 registered projects within 2 km.

Builder: DS Max Properties Private Limited

DS Max Properties Private Limited has 39 registrations on RERA Karnataka, including DS MAX SKY SISIRA and DS MAX SKY SAMURAI. Its filings declare 31 earlier projects, 18 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if DS MAX STAVAM NEST is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of DS MAX STAVAM NEST?

The registered promoter entity is DS Max Properties Private Limited, a company as per the filing. Its CIN U70102KA2007PTC041508 and GSTIN 29AACCD6168M1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in DS MAX STAVAM NEST?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at DS MAX STAVAM NEST?

The professionals named in the filing: Architect: PRAKASH S HATHWAR; Engineer: Swarupananda Goud K S; Chartered Accountant: K Somanatham. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DS MAX STAVAM NEST?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DS MAX STAVAM NEST. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DS MAX STAVAM NEST to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.