Home / Browse projects / Bengaluru Urban, Karnataka / DS MAX SISTA

Registration approved Residential/Group Housing project

DS MAX SISTA

By DS MAX REALTY PVT LTD

RG-KA-66759 · RERA PRM/KA/RERA/1251/310/PR/181215/002216

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Feb 2019Possession promisedmoved 12 months from the original
1Complaints at RERA Karnatakaon this registration
Jump to the 44 documents Report an error

DS MAX SISTA is a Residential/Group Housing project by DS MAX REALTY PVT LTD in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/181215/002216 on 15 Dec 2018. Possession is promised by 28 Feb 2019. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameDS MAX SISTA
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/181215/002216
  • ReraGenie IDRG-KA-66759

Builder

  • NameDS MAX REALTY PVT LTD
  • Entity typeCompany
  • CINU70102KA2008PTC048299
  • Authorized SignatoryK V SATISH

Key dates

this monthRegisteredDec 2018First promiseFeb 2018Revised toFeb 2019

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Dec 2018
  • Promised completion28 Feb 2019
  • Revised completionRevised to 28 Feb 2019 (originally 28 Feb 2018)
  • Buildings1 building record
  • Documents filed44 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DS MAX SISTA---88088

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemNoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,035 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 20.40 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/310/PR/190307/002216Feb 2018 → Feb 2019

Reason as filed by the promoterothers

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
00173/2025-DS MAX REALTY PVT LTD23/01/2025

Documents filed44

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/181215/002216 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: IMG.jpg-
Architect Certificate for Work Completion Schedule till DateFile: AR Certificate Project Extension (works completed)- Sista.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: CE Certificate Project Extension (works completed)- Sista.pdf-
CA Certificate for Funds UtilizationFile: DS-Max Sista Utilization Certificates.pdf-
Architect Certificate for Pending Work Completion Schedule.File: AR Certificate Project Extension (works Pending)- Sista.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: CE Certificate Project Extension (works Pending)- Sista.pdf-
CA Certificate for Funds required for Project CompletionFile: DS-Max Sista Funds Required.pdf-
AffidavitFile: Sista - Affidavit & Commencement Certificate.pdf-
Consent letter from 2/3rd of AllotteesFile: Sista Consent letter.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
LISENCE COPY AND FEES PAID RECIPIT-
Sista- Project Doc-1-
Sista- Project Doc-
sista agreement draft-
sista agreement draft-
KATHA CERTIFICATE-EXTRACT-RECIPIT--DS-MAX-
LISENCE COPY AND FEES PAID RECIPIT-
CONVERSION SKETCH-
ALLOTMENT LETTER-
ebrochure sista-
Karnataka State Pollution Control Board-
Sista Specification-
EC TILL 28 MARCH 2017-
Balance Sheet 2015 - 2016File: DS Max Realty Pvt Ltd BS Scan 2015-16.pdf-
Balance Sheet 2014 - 2015File: Realty BS 2014-15.pdf-
Balance Sheet 2013 - 2014File: DS Max Realty BS 2013-14.pdf-
Audited Profit and Loss Statement 2015 - 2016File: DS Max Realty Pvt Ltd PL FY 2015-16.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Realty PL 2014-15.pdf-
Audited Profit and Loss Statement 2013 - 2014File: DS Max Realty PL 2013-2014.pdf-
Director's Report 2015 - 2016File: BOARD REPORT- REALTY.pdf-
Director's Report 2014 - 2015File: DSMax Realty Directors Report 2014-15.pdf-
Director's Report 2013 - 2014File: DSMax Realty Directors Report 2014-15.pdf-
Cash Flow Statement 2015 - 2016File: DS Max Realty Pvt Ltd Cash Flows 2015-16.pdf-
Cash Flow Statement 2014 - 2015File: Realty BS 2014-15.pdf-
Auditor's Report 2015 - 2016File: compressed_Audit Report-realty 2015-16.pdf-
Auditor's Report 2014 - 2015File: Realty Auditors Report 2014-15.pdf-
Auditor's Report 2013 - 2014File: Realty Auditors Report 2014-15.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: DS Max Realty Pvt Ltd ITR FY 2015-16.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: Realty ITR FY 2014-15.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: DS Max Realty Pvt Ltd 2014-15 ITR.pdf-
Form - B-
Prospectus/BrochureFile: Sista Broucher.pdf-
Advertisement Copy 1File: Advertisment Copy.jpg-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_181215_002216.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep DS MAX SISTA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: DS MAX REALTY PVT LTD

DS MAX REALTY PVT LTD has 1 registration on RERA Karnataka, including DS MAX SISTA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if DS MAX SISTA is delayed beyond 28 Feb 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of DS MAX SISTA?

The registered promoter entity is DS MAX REALTY PVT LTD, a company as per the filing. Its CIN U70102KA2008PTC048299 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in DS MAX SISTA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against DS MAX SISTA?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

What should I check before booking in DS MAX SISTA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DS MAX SISTA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DS MAX SISTA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.