Home / Browse projects / Raigarh, Maharashtra / Dreams Park
Dreams Park
RG-MH-78069 · RERA P52000016465 · Last updated on MahaRERA portal: 25 Mar 2023
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 17 months past the filed date
- 4 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Dreams Park is a Residential / Group Housing project by Dreamz Realty in Raigarh, Maharashtra, registered with MahaRERA as P52000016465 on 11 May 2018. Possession was promised by 30 May 2025 and is now 17 months past that date. 4 complaints are on record with the regulator.
At a glance
Project
- NameDreams Park
- TypeResidential / Group Housing
- Location
- Dilkap College Road
- Neral
- Mamdapur
- Karjat
- Raigarh
- 410102
- Pincode410102
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000016465
- ReraGenie IDRG-MH-78069
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on11 May 2018
- Promised completion30 May 2025
- Revised completionNone
- Buildings6 building records
- Documents filed44 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Dreams Park - Freesia | NA | 5 | 0 | 0 | 0 | 0 |
| Dreams Park - Flora | NA | 5 | 0 | 0 | 0 | 0 |
| Dreams Park - Iris | NA | 5 | 0 | 0 | 0 | 0 |
| Dreams Park - Zinnia | NA | 5 | 0 | 0 | 0 | 0 |
| Dreams Park - Aster | NA | 5 | 0 | 0 | 0 | 0 |
| Dreams Park - Tulip | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 25 Mar 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
56 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Podiums (if any), at 0%.
Dreams Park - Freesia73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Dreams Park - Flora73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Dreams Park - Iris91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Dreams Park - Zinnia91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Dreams Park - Aster91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Dreams Park - Tulip91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 25 Mar 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership3
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Tausif Mohd Ali Mulla | Taloje Majkur | Raigarh |
| Shakib Mustafa Palte | Mamdapur | Raigarh |
| Ibrahim Hamid Patel | Taloje Majkur | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Prasad Dani |
| Engineer | Snehal Mhatre |
| Partner | Role in project |
|---|---|
| Dreamz Realty | - |
Complaints filed with MahaRERA4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000192892 | Farah wafi dadan | dreamz Realty | 07/03/2020 |
| CC006000000192893 | rehana ismail kamal | dreamz realty | 07/03/2020 |
| CC006000000192895 | Mrs. Rubina Salam | DreamZ Realty | 07/03/2020 |
| CC006000000192900 | Mrs. Rukhsana M Rafique Alji | Dreamz Realty | 07/03/2020 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 May 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Mar 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 May 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Mar 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 10 Jul 2021
Documents filed44
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate upload.pdf | 25 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's certificate .pdf | 25 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality assurance certificate .pdf | 25 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality assurance certificate .pdf | 25 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality assurance certificate .pdf | 25 Mar 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: DREAMS PARK-TULIP OC.pdf | 10 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Rera.pdf | 2 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Rera Audit Report - 2019 2020.pdf | 31 May 2021 |
| Layout approvalFile: DREAMZ TP PLAN PAGE 1.pdf | 18 Mar 2021 |
| Layout approvalFile: DREAMZ TP PLAN PAGE 2.pdf | 18 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: DREAMZ TP PLAN PAGE 1.pdf | 18 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: DREAMZ TP PLAN PAGE 2.pdf | 18 Mar 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: DREAMZ CC COPY.pdf | 18 Mar 2021 |
| Building plan approvalFile: Tp Copy.pdf | 2 May 2018 |
| Layout approvalFile: Tp Copy.pdf | 2 May 2018 |
| PAN CardFile: Dreamz Pan Card.pdf | 2 May 2018 |
| Copy of the legal title reportFile: Search Report.pdf | 2 May 2018 |
| Details of encumbrancesFile: Aster.pdf | 2 May 2018 |
| Details of encumbrancesFile: Flora.pdf | 2 May 2018 |
| Details of encumbrancesFile: Freesia.pdf | 2 May 2018 |
| Details of encumbrancesFile: Iris.pdf | 2 May 2018 |
| Details of encumbrancesFile: Tulip.pdf | 2 May 2018 |
| Details of encumbrancesFile: Zinnia.pdf | 2 May 2018 |
| Copy of Layout Approval (in case of layout)File: Tp Copy.pdf | 2 May 2018 |
| Building Plan Approval (IOD)File: Tp Copy.pdf | 2 May 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Copy.pdf | 2 May 2018 |
| Declaration in FORM BFile: Aster.pdf | 2 May 2018 |
| Declaration in FORM BFile: Flora.pdf | 2 May 2018 |
| Declaration in FORM BFile: Freesia.pdf | 2 May 2018 |
| Declaration in FORM BFile: Iris.pdf | 2 May 2018 |
| Declaration in FORM BFile: Tulip.pdf | 2 May 2018 |
| Declaration in FORM BFile: Zinnia.pdf | 2 May 2018 |
| Certificates of CA (Form 3)File: Aster.pdf | 2 May 2018 |
| Certificates of CA (Form 3)File: Flora.pdf | 2 May 2018 |
| Certificates of CA (Form 3)File: Freesia.pdf | 2 May 2018 |
| Certificates of CA (Form 3)File: Iris.pdf | 2 May 2018 |
| Certificates of CA (Form 3)File: Tulip.pdf | 2 May 2018 |
| Certificates of CA (Form 3)File: Zinnia.pdf | 2 May 2018 |
| Proforma of Allotment letterFile: Aster Draft Agreement.pdf | 2 May 2018 |
| Proforma of Allotment letterFile: Flora Draft Agreement.pdf | 2 May 2018 |
| Proforma of Allotment letterFile: Freesia Draft Agreement.pdf | 2 May 2018 |
| Proforma of Allotment letterFile: Iris Draft Agreement.pdf | 2 May 2018 |
| Proforma of Allotment letterFile: Tulip Draft Agreement.pdf | 2 May 2018 |
| Proforma of Allotment letterFile: Zinnia Draft Agreement.pdf | 2 May 2018 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Dreams Park - Blossom | Survey No 169 plot no 41 mamdapur neral karjat | 23 | Completed | Dec 2020 | Dec 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 44 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Dreams Park on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Neral5,900+ in Raigarh
Filed coordinates, straight-line distance. 125 registered projects within 2 km.
NEST 2 PHASE 2
RAJESH VIRENDRA GUPTA
nest 1 phase 2
RAJESH VIRENDRA GUPTA
SHAKTI RESIDENCY
SHAKTI BUILDERS & DEVELOPERS
Plot No -1 Sector -29 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
Plot No.-1 Sector -39 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
Plot No -1 Sector -31 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
See every Raigarh project, with the district possession charts
Builder: Dreamz Realty
Dreamz Realty has 5 registrations on MahaRERA, including Dreams Park - Blossom and Dreams Park. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What does it mean that Dreams Park shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Dreams Park is delayed beyond 30 May 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Dreams Park?
The registered promoter entity is Dreamz Realty, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Dreams Park?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Dreams Park?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Dreams Park?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Dreams Park?
The professionals named in the filing: Architect: Prasad Dani; Engineer: Snehal Mhatre. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Dreams Park?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback